GLAST LAT ProjectMarch 24, 2003 1B Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 1B: Schedule Summary; Critical.

Slides:



Advertisements
Similar presentations
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Advertisements

GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
Overview Cost to Complete
Presentation transcript:

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical Paths; Risks Thomas Borden Stanford Linear Accelerator Center Tracker Subsystem Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Agenda Cost Schedule and critical Path Risks

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Cost Carbon- Fiber Wall Total US Tracker Cost $10,688, (inflated) Significant Collaborator contribution: –Italy: purchase 5000 SSD’s, Fabricate, assemble and test Qualification, Flight and Spare towers –Japan: purchase 6400 SSD’s and support testing of all SSD’s

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Schedule

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Schedule

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Schedule

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Schedule

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Milestones

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Milestones

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Milestones

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Milestones

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Milestones

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Critical Path First Critical Path

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Critical Path Second Critical Path

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Critical Path Third Critical Path

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Critical Path Third Critical Path

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Critical Path Critical Path Dates: –May 1, 2003 – Start tray panel fabrication –July 30, 2003 – SLAC deliver first lot of TMCM’s to INFN-Pisa –November 7, Qualification Towers Assembled Flow from Qual tower and Spare defined by tower testing

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Risks TKR-1 Risk Description: –Low Tracker MCM yield. Each MCM holds 26 ICs. The MCMs are tested before encapsulation, to allow for rework. However, rework is costly, and too much rework could make it impossible to hold the schedule and budget. We need it to be the exception, rather than the rule, but so far, in the EM run, rework involving IC replacement was needed on the majority of MCMs. Risk Mitigation: –Screening and handling procedures need to be improved according to the plan described here. Risk Impact Assessment: –Possible delay in tower assembly and increased labor cost at Teledyne. Risk Mitigation Implementation Plan: –1. (Johnson, Sugizaki) Improve IC screening. The GTRC chips were not screened for the EM, some features of the GTFE were not screened, and the screening was at only 2 MHz due to technical problems. These systems will be improved and tested. An inker is being added to the probe station to remove human error in die sorting. We also may need to reject dice close to the wafer edge. (end March) 2. (Johnson, Ziegler) Improve IC handling. Detailed procedures are being written. (end March) 3. (Borden) Improve testing of the MCM PWB prior to assembly and again prior to die attach. (Mid April) 4. (Johnson, Sugizaki) Improve the MCM test software to speed up localization, of a bed IC. (June 1) 5. Improve IC design (done), especially to remove the G-chip oscillation problem. Current Status: –March 19, 2003: the GTRC probe card was built and is working well with updated test vector software. The GTFE probe card was rebuilt and is working and currently being put through thorough tests. Both cards work at 20 MHz+. The wafer testing procedure is written and reviewed and in the release process. The cleanroom has been prepared and inspected. The inker is on order (end March). The new chips have been tested and the design improvements were successful.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Risks TKR-2 Risk Description: –MCM-SSD CTE mismatch. The Tracker MCMs and the SSDs are connected by wire bonds, which are to be encapsulated. This interface is not yet tested. Since it goes the full width of a tray, there is a risk of damage from movement during thermal cycling. Risk Mitigation: –The flight MCMs are to be fabricated in Polyimide instead of FR4, to lower the CTE (Aramid was considered but has other undesirable features). The encapsulation will be Nusil silicone, as in the ladders, which allows some movement with low stress. The interface needs to be tested on the EM. Risk Impact Assessment: –Critical Path Impact Risk Mitigation Implementation Plan: –Build a complete functional engineering-model tray by mid April(two MCMs) in addition to the ones in the mini-tower, and put it through full qualification-level thermal-vacuum testing. (May) Current Status: –March 19, 2003: The tray panel is in hand, as are the two MCMs and the ladders. The procedure for encapsulating these bonds is being tested first on some mechanical/thermal EM trays.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Risks TKR-3 Risk Description: –Tray-panel fabrication start-up. Fabrication of tray panels at Plyform needs to start in early March (i.e. pre-CDR) unless the rate can be made to exceed current predictions. We have not yet seen a plan from Italy/Plyform on how to accomplish this, nor have we seen any documentation. Risk Mitigation: –SLAC assistance to Pisa in getting documentation and materials in place. Risk Impact Assessment: –Critical path impact Risk Mitigation Implementation Plan: –Acquire Carbon-Carbon material early from SLAC (done). Procure cores from SLAC (in progress). Tom Borden travel to Plyform in early February to assist with planning and documentation. Current Status: –March 19, 2003: 1. The cores were ordered and already received and shipped to Italy. 2. Tom traveled to Italy and helped prepared a draft procedure document. 3. We received a detailed schedule from Pisa for the flight build. It shows that the tray panel fab can start in May instead of March and the electronics will still be the critical path.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Risks TKR-4 Risk Description: –Procurement of MCM components. MCM production at Teledyne needs to start soon to have MCMs ready to accept ASICs in late May. The design includes parts that are not yet approved but have 8- week lead times (the connectors), parts for which we have been working for a long time for approval without complete closure (polyfuses), and parts for which we do not have agreement on fabrication specifications (the PWB and flex). Furthermore, our success rate at SLAC for procuring these items for the EM was poor. We need Teledyne on contract to help us handle these procurements. The LAT parts specialist to date has never made any contacts with Teledyne. Risk Mitigation: –Increase manpower at SLAC on these procurements. Contract with Teledyne to do all of the parts receiving. Risk Impact Assessment: –Critical path impact. Risk Mitigation Implementation Plan: –Have a meeting at Teledyne, including Nick Virmani, as soon as possible to iron out the contract and specifications to be used for MCM PWB and flex procurements and specifications to be used for MCM assembly. Action also needs to be taken on the Omnetics nano-connectors to get them approved for flight. Current Status: –March 19, 2003: 1. The meeting at Teledyne was held successfully, clarifying a lot of issues. 2. The Omnetics connectors were approved and are on order. 3. The polyswitches were approved and are on order. 4. Final PWB and flex prototypes are in hand and being tested. 5. Jeff Tice and Jerry Clinton at SLAC are working the procurements and associated specifications. A quote for the PWBs was requested.