ALICE space in P2 ALICE TC (W.Riegler, A.Tauro) SPOB meeting – 24.2.2011.

Slides:



Advertisements
Similar presentations
Project 4: National Balloon Museum Rehabilitation and Expansion The rehabilitation of the museum involves an addition to the existing facility, providing.
Advertisements

What to when you have an unexpected OSHA inspection.
Copyright © 2008 Waiting Room Solutions Waiting Room Solutions Training: Support Portal.
St. Joseph’s Building Project. Introduction This power point will let you know what is happening with the building project. It goes from the beginning.
Energetic and Environmental Incubator House at Zalahaláp.
Marks and Spencer Chesterfield Store Entrance Matting Refurbishment by UK Mat Group.
Free house located at 130 W. Sheboygan Street, Campbellsport, WI.
Delivering Collaborative Solutions that Promote Learning Asotin-Anatone School District Helpdesk A web-based application to submit and track all technical.
A: Excuse me, Could you tell me where the Accounts Department is? B: Yes, it’s the second door on the left opposite the Conference Room. FINDING YOUR WAY.
Fire Marshal & Medical Emergency Training Please Sign In
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 6 June 2014.
Building 90 BET Meeting S.Synarski 6/11/14. Agenda Reminder: Sign up for Lab Alert (2 min) October Drop, Cover, Hold, Evacuate Drill: Oct 16, 10:16am.
Exploring the Benefits of Shared Spaces and Services for Hunterdon County Nonprofits March 30, 2012 Build with Purpose United Way of Hunterdon County.
Enclosure Fire Dynamics
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Understanding House Plans
Thomas Baron - IT Gregory Godineau - GS Conference rooms service Issues with physical keys Requirements Solution Pilot and Deployment Alternatives.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Church Administrators & Emergency Planning
OVD, spol. s r.o. REAL ESTATE COMPOUND MANUFACTURING / WAREHOUSING FOR SALE OR RENT Business Park ZTS Dubnica nad Váhom.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Key Stage 2 Example VAKPACKs: Roman Houses - Missing Vowels Game Try to work out the following word(s) where their vowels and spaces.
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
Housekeeping. Responsibilities Supervisors are to ensure that good housekeeping is maintained at all Universal Compression’s office, shop and work locations.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
TEST BEAM 2007 Dates, Facilities, Safety Cinzia Some key slides from Beniamino Di Girolamo CERN.
Schematic design presentation School of Business South Hall Renovation.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Module 9Slide 1 of 25 WHO - EDM Premises Part One Basic Principles of GMP Part One, 11.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Meeting between Users’ Office, LHC experiments, GS/AIS Doris Chromek-Burckhart Head of CERN Users’ Office 16. November 2012.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
Bond Project Update September 2017
Know your workplace hazards
EXTENSION ELENA = BUILDING 193 Status of integration
Budget specification EHN1 Extension: Infrastructure (WG2)
OFF SITE RENEWAL REGISTRATIONS!
California Payroll Conference
TECHjOSH.COM TechJosh.com.
Open Doors – Storage Committee
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
SITE SPECIFIC INFORMATION Gilbertson Road, Laverton
C.M. Scullion Associates Ltd
Troy School District Bond Program – Series 1 Construction Update
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
SITE SPECIFIC INFORMATION Brooks Drive, Dandenong
Simulation Scenario Floor Plans
Presentation transcript:

ALICE space in P2 ALICE TC (W.Riegler, A.Tauro) SPOB meeting –

SPOB meeting ALICE space in P22 Status of P2 space 37 barracks on site, most of them dating from LEP times 30 barracks used by ALICE (others by CV, BE,..). 8 are rented by the collaboration Used mainly to store small/delicate objects and as office space !!! These barracks are in really bad conditions. They are an hazardous and unhealthy place !!! We aim at getting rid of all of them. In 2010 GS has already removed the 4 oldest ones We need additional space in replacement of these barracks: –We request to have new offices and a storage area (see next slides)

SPOB meeting ALICE space in P23 Aerial view of P2 site ALICE storage and office areas Bld is the only storage place we have – and is now full Bld. 2252: mechanical workshop, cleanroom and storage of big structures Bld. 3294: offices and conference rooms Bld (owned by BE): we occupy 50% of this place (storage) !!! Barracks !!!

SPOB meeting ALICE space in P24 Barracks* *not for distribution to safety inspectors ☺ Dismantled in 2010

SPOB meeting ALICE space in P25 Building 3294 (2008) We are happy with this place, which is very well used for all the daily/weekly ALICE meetings.

SPOB meeting ALICE space in P26 ALICE space requests 1.Office space: 16 offices – matching with the # of ALICE detectors. New conference room not needed We like very much to have them on the 2 nd floor of Bld (design of foundations was made such to cope with this possibility) 2.Storage space: New building with foundation, similar to B.292 (Meyrin) Surface ~ 250m 2 2 entrance doors: –Personnel –Material (possibility to enter with trans-pallet) Heating

SPOB meeting ALICE space in P27 Office space: 2 nd floor Bld (JAQUET)

SPOB meeting ALICE space in P28 2 solutions for the storage area

SPOB meeting ALICE space in P29 Bld. 292 (Meyrin)

SPOB meeting ALICE space in P210 Thanks!