EDS 1 Early Delivery Systems Testing Preparation WebEx Meeting Jonathan Pulcini - EDS 1 John Webb - EDS 1 Ken Kasparian - EDS 3 Bill Blevins - EMS Frank.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
Advertisements

August 13-14, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Planning – Involving Market Participants TPTF May 22, 2007.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
1 Texas Nodal Texas Nodal Program Implementation TPTF June 6, 2006 Agenda.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
22 May 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
September 25, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
May 22, 2008 TPTF Texas Nodal Market Implementation Program Update Raj Chudgar.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
EDS 1 Early Delivery Systems EDS 1 Update Jonathan Pulcini - Project Manager August 13, 2007.
1 Market Trials Update NATF May 4, 2010.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
EDS 1 Early Delivery Systems EDS 1 Update for Workshop Jonathan Pulcini - Project Manager August 17, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 26, 2007.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
1 Market Trials Update NATF January 5, 2010.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
EDS 2 Early Delivery Systems Approach March 2007.
NMT – Network Operations Modeling & Telemetry - Project
Role of Account Management at ERCOT
Presentation transcript:

EDS 1 Early Delivery Systems Testing Preparation WebEx Meeting Jonathan Pulcini - EDS 1 John Webb - EDS 1 Ken Kasparian - EDS 3 Bill Blevins - EMS Frank Kendall - EMS May 16, 2007

Page 2 2 EDS 1 – Release 2 May 2007 EDS 1 – Early Delivery Systems Agenda 9:30 -10:00 am EDS 1 Point Verification Process – Jonathan Pulcini –Pre-Verification Activities –Verification Activities –Post-Verification Activities –Q&A 10:00 – 10:30am QSE Nodal Point Verification – John Webb and Ken Kasparian –Inbound Testing Schedule (EDS 1 / EDS 3) –Outbound Testing Schedule (EDS 1 / EDS 3) –Q&A 10:30 – 12:00 noon ICCP Handbook – Bill Blevins and Frank Kendall –Overview of sections –Specific review of recent updates –Q & A

Page 3 3 EDS 1 – Release 2 May 2007 EDS 1 – Early Delivery Systems EDS 1 Point Verification Process Jonathan Pulcini

Page 4 4 EDS 1 – Release 2 May 2007 EDS 1 – Early Delivery Systems Point to Point Verification Testing - Scheduling –Testing Timeline is June 1 st – Sept 30 th –EDS1 is scheduling with MPs currently for all time slots –Contact Jonathan Pulcini at to schedule

Page 5 5 EDS 1 – Release 2 May 2007 EDS 1 Testing Timeline June Initial TSP and QSE Testing: confirmed ONCOR ELECTRIC DELIVERY COMPANY, CENTERPOINT ENERGY HOUSTON ELECTRIC LLC AND NRG TEXAS LP July QSE and TSP Testing: 1 st two weeks are confirmed ONCOR ELECTRIC DELIVERY COMPANY, EXELON, APX (need list of sub QSEs), RELIANT Availability remains for weeks of 7/16-720, 7/ August QSE and TSP Testing: AUSTIN ENERGY (TSP), CPS (TSP) Availability remains for most of month September QSE and TSP Testing: BRAZOS ELECTRIC COMPANY (QSE/TSP) Availability remains for most of month

Page 6 6 EDS 1 – Release 2 May 2007 Testing Preparation – Confirming Schedule By May 30 th –Confirm testing schedule with ERCOT for each MP. –MP must confirm number of testing resources available during scheduled time slot. –For any other questions or issues that need to be addressed, ERCOT will schedule a call with the MP as needed. –POC for EDS 1 Testing - Contact Jonathan Pulcini at to schedule testing.

Page 7 7 EDS 1 – Release 2 May 2007 Testing Preparation – Pre-Testing Activities Four Weeks Prior to Testing –ERCOT sends the Market Participant (MP) the AIEF form to complete. –The MP s the ICCP team a completed AIEF form to Steve White at –ERCOT sends the MP an ICCP Change Request Form pre- populated with existing Zonal ICCP points. –ERCOT completes all network requests and verifies network connectivity with the MP. Note: these steps have already been completed for CenterPoint Energy

Page 8 8 EDS 1 – Release 2 May 2007 Testing Preparation – Pre-Testing Activities Three Weeks Prior to Testing –MP submits the ICCP Service Request: link as a Service Request (SR) through the Texas Market Link (TML) with all new ICCP points using the pre-populated service request form sent by ERCOT the previous week. Note: ERCOT requests that MPs submit SRs to TML early in the week to give ERCOT time to review the list and load changes into their Wednesday database batch load –MP sends: detailed schedule (list of stations/resources to test each day) number of resources available testing contacts (name, phone, ) –ERCOT loads existing SCADA points into EMS database as part of the weekly Wednesday batch load.

Page 9 9 EDS 1 – Release 2 May 2007 Testing Preparation – Pre-Testing Activities Two Weeks Prior to Testing –ERCOT loads new ICCP data points for the MP into ICCP test database. –EDS 1 testing team loads ICCP testing data points into EDS 1 testing database. –ERCOT generates and sends test checklists to the MP for verification. –MP sends ERCOT one line diagrams (if available) for all stations/resources that will be tested.

Page EDS 1 – Release 2 May 2007 Testing Preparation – Pre-Testing Activities One Week Prior to Testing –ERCOT re-confirms testing schedule with the MP. –ERCOT updates testing checklists and resends to the MP. –ERCOT conducts a pre-test with one MP station/resource scheduled for testing the first week. Note: Testing will consist of verifying status changes on a unit, reviewing randomly selected analog points, and manually changes some points. The MP must have at least one resource available to conduct pre-testing.

Page EDS 1 – Release 2 May 2007 Testing Preparation – Testing Activities P2P Testing –ERCOT records the MP operator name, contact information, and start time of the test on each test checklist. –ERCOT cross-verifies with the MP all analog point values and quality codes on both ends. –The MP changes values of selected analog points on their side and ERCOT verifies changes in value, quality code, and update time at ERCOT. –The MP toggles status of each status point. ERCOT verifies status change, change in quality code and time taken for update on tabular displays.

Page EDS 1 – Release 2 May 2007 Testing Preparation – Testing Activities Immediately Following Test –ERCOT logs, categorizes, and prioritizes all the identified problems. –ERCOT sends an electronically signed copy of the test results to the MP through . –MP s confirmation and agreement of the ERCOT electronically signed copy to –ERCOT provides a weekly status on testing results to track progress at: - Readiness Center tab, Key Documentshttp://nodal.ercot.com EDS 1 Weekly Status Report mmddyyyy.doc

Page EDS 1 – Release 2 May 2007 Testing Preparation – Testing Activities EDS 1 Weekly Status Report - example

Page EDS 1 – Release 2 May 2007 Testing Preparation – Post-Testing Activities Week After Testing –ERCOT updates central EDS 1 testing database with test results. –ERCOT updates issue list database based on the issues identified and assigns them either to ICCP analysts or network modeling teams. –ERCOT ICCP/Modeling teams work with the MPs to resolve problems. –EDS 1 team re-verifies the issues at appropriate time and updates the databases.

Page EDS 1 – Release 2 May 2007 Questions? Point to Point Scheduling Point to Point Testing Activities

Page EDS 1 – Release 2 May 2007 For more information... Visit Texas Nodal Website: Subscribe to biweekly newsletter: bin/majordomo. Select TexasNodalNewshttp://lists.ercot.com/cgi- bin/majordomo questions, comments or feedback to the Nodal Transition Readiness Center at or call (512) to speak with a Contact your account manager

Page EDS 1 – Release 2 May 2007 EDS 1 – Early Delivery Systems QSE Nodal Point Verification John Webb and Ken Kasparian

Page EDS 1 – Release 2 May 2007 Nodal QSE SCED / LFC Point Verification Plan Background –Each QSE will add approximately 30 new SCED / LFC ICCP points per Resource (Unit and Load) –New points are defined in the ICCP Handbook in tables 20 and EDS 1 –Scope Load new and existing points into the Nodal ICCP database Verify ICCP connectivity, point mapping, scan rates and quality code values between QSEs and ERCOT –Inbound to ERCOT QSE Operator manually enters / toggles values for ERCOT Operator to verify –Outbound to QSEs ERCOT Operator manually enters / toggles values for QSE Operator to verify

Page EDS 1 – Release 2 May 2007 Nodal QSE SCED / LFC Point Verification Plan EDS 3 –Scope Trial Operation of Security Constrained Economic Dispatch (SCED) Attain Reasonable LMPs & Begin Six Month LMP Posting Trial Operation of Load Frequency Control (LFC) –Inbound to ERCOT Real-Time ICCP point data required for SCED / LFC –Outbound to QSEs EDS 3 SCED / LFC ICCP point data

Page EDS 1 – Release 2 May 2007 Step 1 (Jun – Sep 07) Step 2 (Aug – Oct 07) Step 3 (Oct – Dec 07) ICCP Validation Point to Point Checkout Configure New ICCP Data Registration Data Collection Validate Existing Data Collect New Registration Data Web Services WS Interface Specifications Development Sandbox SCED ICCP Input Connect new ICCP data sources (EMS, Field Telemetry, …) Validate new MP ICCP telemetry is available for SCED testing Registration Data Upload New Registration Data for Nodal testing Complete Registration Data Integration Web Services WS Backend Integration MMS Validation Rule Testing (Early EDS) SCED Execution Nodal Registration Data Static ICCP data inputs to validate initial stability Migrate to Real-Time ICCP data inputs for SCED testing Reasonable LMP Attainment SCED ICCP Output Complete Integration with EMS system Distribute SCED outputs via ICCP Web Service Output Distribute SCED output via Web Services Step 4 (Jan – Jun 08) LMP Posting Post LMPs for 6 months as required by the Nodal Transition Plan Utilize Real-Time ICCP data Distribute SCED outputs via Web Services & ICCP EDS 3 - Data Preparation for SCED 6 Month LMP Posting

Page EDS 1 – Release 2 May 2007 Questions? QSE Nodal Point Verification

Page EDS 1 – Release 2 May 2007 EDS 1 – Early Delivery Systems ICCP Handbook Bill Blevins and Frank Kendall

Page EDS 1 – Release 2 May 2007 ICCP Handbook Changes Summary This ERCOT Nodal ICCP Communication Handbook Version 0.20 is a major revision from the previous Version Changes have occurred in every section and nearly every paragraph. The document has also been organized so that material is easier to find, easier to use as a reference document, and to improve comprehension.

Page EDS 1 – Release 2 May 2007 ICCP Handbook Change Summary Details All comments from ERCOT internal review, TPTF, and other Market Participants have been processed. The AIEF has been modified and moved to Appendix A. There is now only one version of the AIEF regardless of Market Participant type. An explanation of the ICCP Object Naming conventions and the purpose of the naming convention tables versus the data exchange tables has been added (Section 1.4). The ICCP Object Naming convention tables have been moved so that they are adjacent to the data exchange tables they support. The ICCP Object Naming conventions have been changed to make constructing an object name easier. The glossary has been expanded (Section 1.6).

Page EDS 1 – Release 2 May 2007 ICCP Handbook Change Summary Details Section 2 has been improved and combined with the section on implementation procedures previously duplicated in the QSE and TSP sections. The description of the high data availability architecture has been given its own chapter level section (Section 3) and greatly expanded to discuss various Market Participant configurations, connections, and operation in the new architecture. Domain naming conventions have been changed to support the high data availability architecture, and the section has been reorganized for improved clarity (Section 4.3). Resource status codes have been defined and included in the Handbook (Section 4.5.2). Other improvements in clarity have been made throughout the document.

Page EDS 1 – Release 2 May 2007 ICCP Handbook Next steps Address TBD issues. Post version 0.21 for TPTF approval. May 22 nd review comments and resolution with TPTF. Obtain vote from TPTF for approval. Place ICCP handbook under document control. Deliver to IRT for EDS P-P checkouts. Distribute to Market Participants.

Page EDS 1 – Release 2 May 2007 Questions? ICCP Handbook