AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008.
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Authoring Instructional Materials (AIM)
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
AIM Toolset Interfaces with Authoritative Technical Data
1 AIM/CPM Pilot Project Status Report 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Roy Hoyt & Leslie Desenburg, NETC N74.
Authoring Instructional Materials (AIM)
Authoring Instructional Materials (AIM) Roadmap
AIM ACR Prioritization AIM ACR Prioritization 5 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM ACR Prioritization AIM ACR Prioritization 19 Sep 12 Tiffany Dombrowski, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
NSW AIM FRB Utilization Discussion Karen Pohl Curriculum Systems Director Naval Special Warfare Center 4-6 November, 2009 Orlando, FL 1.
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
AIM FRB Briefing Jerry Benzel Contractor Support to NAVSEA 07TR3 (202)
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
Sakai Overview ITS Teaching and Learning Interactive Aurora Collado January 10, 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
1. Report status of traditional and modernized AIM
Portal and AQAS-Philadelphia University 21-22/6/2011 AVCI Platform in PU Dr. Abdel-Rahman Al-Qawasmi Philadelphia University Director of Computer Center.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
Class Instructor Name Date. Classroom Tips Class Roster – Please Sign In Class Roster – Please Sign In Internet Usage Internet Usage –Breaks and Lunch.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
Roles/Privileges/Workflow IPT Status Report. Agenda –Members –Tasks –Status –Functional Requirements.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM ACR Prioritization AIM ACR Prioritization 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
1 © Xchanging 2010 no part of this document may be circulated, quoted or reproduced without prior written approval of Xchanging. MOSS Training – UI customization.
Learningcomputer.com SQL Server 2008 – Management Studio.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
K. Harrison CERN, 22nd September 2004 GANGA: ADA USER INTERFACE - Ganga release status - Job-Options Editor - Python support for AJDL - Job Builder - Python.
Module 1: Introduction to Microsoft SQL Server Reporting Services
1 Documentation Progression Send To Standard Document Library Document Center – Drop Off Library – Rules Based on Content Type and Metadata routes files.
Project Management Plan Howard Community College Canvas Training Course Instructional Designer Ruddhi Wadadekar Presented to The Dean: Teaching and Learning.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Block Learning / Ready Relevant Learning and
Module 5: Managing Content. Overview Publishing Content Executing Reports Creating Cached Instances Creating Snapshots and Report History Creating Subscriptions.
VISION Learning Station
Managing a Web Server and Files
eCourses Gradebook Overview
Using the AIM Alternative Testing Module (for Instructors)
Presentation transcript:

AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08

Use of Traditional AIM I LP/TG Content ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando. Courses are exported to SCORM V1.2 and imported into Elite.

Top Five AIM Change Requests (ACRs) 1. AIM-I : Add RRL, OAC, and FAL to HTML output. 2. AIM-I : Add ability to create changes to RRL items. 3. AIM-I : Include TG graphics that were embedded in Word in SCORM output. 4. AIM-I : Allow simultaneous editing of TCCD, COI, and LP/TG. 5. AIM-I : Add Developing Authority functionality to LO module.

Electronic Classroom and ILT Delivery All ECs are connected to a central server, which contains the Elite courses, IETMs, IMIs, and Training Assets Menu. The EC Instructor stations are dual-monitored for simultaneous viewing presentation materials and staging of materials for broadcast to Student stations. Materials are sent to Student stations from the Instructor station using Robotel.

JTA/NJA Data and Process SSP has: Revised OCCSTDS Re-developed NJA and OCCSTDS Uploaded NJA into CPM (R&D site) from Excel spreadsheets Sent refreshed OCCSTDS for NAVMAC review SME Panel (SME, SLC, TYCOM, SSP, Fleet) Develops integrated OCCSTDS/NJA Skill Group (KSAs) Tasks (KSAs) Subtasks (KSAs) Steps (KSAs) Reviewed and approved SSP and SLC OCCSTDS WG Pulled NJA data out and created OCCSTDS update OCCSTDS Review/ Approval Process Operator NJA Technician NJA Manager NJA MT 3 OCCSTDS Functional Area Tasks Functional Area Tasks Functional Area Tasks Functional Area Tasks MT 2 OCCSTDS MT 1 OCCSTDS MTC OCCSTDS

ILE Projects and CPM/LO Module MT Continuum –MT Continuum Overview –Development Process

Small Arms Initial Training Course at TTF PRPBMS NWSG IPFCS MCRP OJT CAMP LAB Patrol #1PDTPPatrol #2 OJT ILTLABOJT SWS Tech FCS LCHR PDTPPatrol SWDO OJTLABILT PDTPPatrols Ops Course(s) At TTF Advanced Ops & Maint Course(s) At TTF ILT Mini-courses At TTF Prerequisite Requirements Apprentice Training Color codes: Journeyman Training Master Training SSBN Watch Station Qualification Watch Station Qualification Watch Station Qualification Watch Station Qualification Training Course at TTF Shore Tour Second and Third Sea Tours “A” School Patrols 3-5 of first sea tour MT Continuum Overview

MT Continuum Development Process

NJA Excel COI/ISD Word Doc

MT Continuum Process Lessons Learned Need to be able to update AIM data with changes made in final development (As Designed = As built) for maintenance of content. AIM automatic metadata needs better definition process to make more effective. Must have a “GOTS” product do the “finishing work”—or else minor changes require going back to developer EVEN if you have the source files. Need a Configuration Management toolset to control final product AND source files. (CMAD did NOT do this, and now no toolset is planned to accomplish).

Top Five AIM/CPM FRM Items 1. (Multiple FR items): Change Compare Report – surveillance needs are high and more costly than initial development. 2. (Multiple FR items): Work flow (approval) – ensures CM. 3. ( ): Import open XML into LO Module from other applications – supports maintaining as designed data (LO Module) = as built data (other app). 4. ( ): Import option to overwrite existing material or not – supports maintenance. 5. ( ): Build NLOS from existing NLOS and maintain links to existing content AND utilize the same ELO in LO Module – supports content re-use

Points of Contact Jamie Swaim or Richard Garrison or