NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May Dynamics Tests LAT Environmental.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project Integration and Test October 1, Environmental Test Requirements: Structural LAT Structural Tests: There are three environmental.
LAT-TD GLAST LAT ProjectJune 28, 2006 Mechanical Systems GLAST LAT Mass Properties Test Readiness Review Mechanical Systems GLAST LAT Mass Properties.
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
LAT-TD Page 1 GLAST LAT ProjectEnvironmental Test TIM, Day 1: Structural Tests, March 14, 2005 Agenda: LAT Environmental Test TIM, Day 1: Structural.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Bill Raynor Naval Research Lab
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Environmental Test Planning
Baseline Environmental Test Flow at NRL
GLAST LAT Acoustic Vibration Test Readiness Review
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
Amendment Invoice Task Force Progress Report
UK Link Technology Refresh
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Amendment Invoice Task Force Progress Report
P17082 Biomechanical Elbow Model Build and Test Prep
Amendment Invoice Task Force Progress Report
Environmental Test Planning Meeting
Exit Capacity Substitution and Revision
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Introduction and Overview
Design Integration and Analysis
Detailed Design Presentation
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
GLAST Large Area Telescope:
Presentation transcript:

NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting Dynamics Testing Update John Ku

NRL Pathfinder Planning Meeting2 GLAST LAT Project07 September 2005 Dynamics Test Plan and Sine Vibration Test Update Dynamics Test Plan Update –Dynamics Test Plan in release cycle – comment from NRL implemented, nothing holding up release except signatures Sine Vibration Test Progress –Test Plan has been agreed upon for some time now, and is well understood –Incorporated minor comments arising from the draft review – the test plan is currently in signature cycle –Strain gauge locations defined to allow calculation of interface loads – the gauge locations were determined by analysis but will be verified at the TIP proof test and Grid Static Load Test Sine Vibration Test Issues –Need to ensure accelerometer interface to NRL – this has been examined many times in the past, but a final accounting needs to be done for all accelerometers, their cables and associated lengths, and strain gauges  Approx need date = mid-Oct, ‘05 Potential long lead items (6 weeks for accel or cable delivery) –Need to lay out contingency plan for modal test  Approx need date = Nov, ‘05 Sine Vibration Test Additional Work –Complete Pre-test Analysis, which comprises frequency-response analysis, load extraction and margin calculations  Approx need date = mid-Nov, ’05 –Work with NRL to write Test Procedure  ECD = Jan, ‘06

NRL Pathfinder Planning Meeting3 GLAST LAT Project07 September 2005 Acoustic Test and Weight/CG Test Update Acoustic Test Progress –Test Plan has been agreed upon for some time now, and is well understood –Initial layout of SC top deck simulator in-work Acoustic Test Issues –SC Top deck simulator large enough? Some concern that the area is significantly less than the SC Top Deck…is this acceptable? –Radiator lower support strut stiffness Subsystem test may not have been conservative for the RMBs How well does the test stand have to simulate the SC? Acoustic Test Additional Work –Complete SC top deck simulator trade and design  Approx need date = Jan, ‘06 –Complete trade study on radiator lower support struts  Approx decision date = mid- Sept, ‘05 Potential impact to test stand design, i.e. may need to change 4x4x0.25 angle to something stiffer Need to arrive at the answer soon to not hold up test stand weldment mfg –Work with NRL to write Test Procedure  ECD = Jan, ‘06 Weight/CG Test Progress –Basic method agreed upon and shown in current test plan –Load cells identified Weight/CG Test Issues –Load spreader plate not designed yet Weight/CG Test Additional Work –Design Load spreader plate  ECD = Dec, ‘05 –Make spreadsheet to calculate Weight and CG from load cell output  ECD = Feb, ’06 –Work with NRL to write Test procedure  ECD = Jan, ‘06