Session 2, III - Voltage dips and disturbances in customers installations Barcelona 12-15 May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.

Slides:



Advertisements
Similar presentations
Interharmonic Levels at a DC Arc Furnace Installation Erich W. Gunther Electrotek Concepts, Inc.
Advertisements

1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Summary of 3 rd CEWG meeting by Chair and Vice-Chair Open Session CEWG on R&D Financing and Coordination November 18, 2011.
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
3 luglio 2006 Dove Auditorium CESI via Rubattino 54 - Milano Qualità della tensione nelle reti elettriche in Italia: il sistema italiano di monitoraggio.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
Russ Housley IETF Chair 23 July 2012 Introduction to the IETF Standards Process.
Midwest ISO Stakeholder Process Bill Smith July 12, 2011 Missouri Public Service Commission.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Nanotechnology Documentary Standards Activities Ajit Jillavenkatesa Standard Services Division NIST April 30, 2008.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
SC 17A SC 17A Discussion - Need and Process IEEE, Document Need, Dual Logo Maintenance Process New Delhi, India /17 L. Farr and D.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
McGranaghan US Session 2 Block 4 Question 12 Barcelona May Statistical Framework for Establishing Target Reliability Levels and Classifying.
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
National Digital Orthophotography Program Shirley Hall Chair, NDOP Steering Committee.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 05/09/2013.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
PagedatoForfatter - Titel1. pagedatoForfatter - Titel2 How to help NC in working towards network for the future  Based on dialogue with the Danish NC.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
1 The Need for Probabilistic Limits of Harmonics: Proposal for IEEE Std 519 Revision Paulo Ribeiro Calvin College / BWX Technologies, Inc Guide Carpinelli.
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
CIGRE JWG / CIRED Power Quality Indices and Objectives Progress report on joint Cigré / Cired Germain Beaulieu, conv. February 2003.
Slide 1 IEEE Standardization Issues for SPIRIT Options, Costs, Impacts Victor Berman, 28 July 2005.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Gunther & McGranaghan US Session 3 Block 2 Barcelona May Development of the Integrated Energy and Communications Systems Architecture (IECSA)
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Prinath Dias Former RCA Focal Person.  A little history  The policies behind the achievements  Some thoughts for the future.
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Working Group II Terms of Reference Presented to CGMS Plenary and Working Group II CGMS-44 CGMS-WP-30.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society Liaison.
How to : Download, Read & Analyze PQDIF Files from PMC-680i 10-Jun -2013, Alan Hua.
How to : Download, Read & Analyze PQDIF Files from PMC-680i 10-Jun -2013, Alan Hua.
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
HIS Smart Grid – Summary (1)
Frances Cleveland Convenor WG15
IEC TC57 Smart Grid Activities
Context : Deregulation of the electricity market
Accredited Standards Committee C63® - EMC
Smart Grids activities in ETSI
Accredited Standards Committee C63® - EMC
Marcello A. Giorgi Università di Pisa & Pisa
Presentation transcript:

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working Group General Aspects Erich W. Gunther Electrotek Concepts, Inc – USA Convener Cigré C4.05/CIRED 2/UIE - CCU2

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 History & Scope of CCU2 In existence since 1977 as a “permanent” Cigré working group Study of the low-frequency disturbances (harmonics, flicker, unbalance and voltage dips) caused either by the loads or, sometimes, by the transmission and distribution systems themselves. Study methods of prediction and measurement of the corresponding parameters of these disturbances. Assessment of limit values of these parameters and corresponding values of probability. Maintain liaisons with other organizations concerned with similar studies – technology transfer is sometimes considered our most beneficial “product”. More than 2000 documents distributed within the working group since Despite the voltage quality designation in the official name, we handle current also

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Cigré C4.05, CIRED 2, UIEPQ - CCU2 The CIRED power quality working group is a joint working group. Originally with Cigré (recently renamed C4.05) and was designated CC02. Three years ago, UIE PQ formally joined the group to create CCU2 Three groups with common interest in power quality have joined forces with common members, meetings, and publications to maximize results and minimize overhead Meet 1 or more times per year Last meetings in Düsseldorf and Brussels Meet next week in Madrid. Next meeting at the joint Cigré/IEEE symposium in October 2003

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Diverse disciplines and expertise Voltage quality issues require expertise in many different technical areas. Consequently, CCU2 membership is large (52 members from > 20 countries) but with a core group of 10 or so who regularly attend meetings. Same members of CCU2 are also members of other power quality related organizations. Reality of limited travel budgets necessitates cooperation between groups and common meetings where possible.

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Work in progress Flicker meter test/certification protocol Extend UIE/IEC flicker meter specification to cover 100 volt lamps (Japan) Paper on worldwide flicker compatibility levels, contract levels, practical levels, measured values, and actual experiences Paper on impact of utility deregulation on power quality UIE Guide Part 3: Harmonics

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Coordination with other groups CCU2 maintains a list of coordinating groups, their conveners, and work underway to keep everyone informed Close coordination with IEC, IEEE and other groups via common membership IEC often requests CCU2 perform specific tasks New IEEE Power Quality Subcommittee formed under T&D Committee – most power quality related working groups moved there IEEE Power Quality Standards Coordinating Committee SCC-22 – new agreement between IEEE and IEC to appoint IEEE representative to each PQ related working group

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Coordination Accomplishments Interharmonics in Power Systems paper co-developed and published with IEEE interharmonic task force RMS variation indices and tabulation methods co-developed with EPRI and various IEEE working groups RMS variation indices work turned over to new Cigré working group (C4.07) for additional work IEC and IEEE SCC-22 have formal agreement to share working documents between power quality groups and appoint IEEE representatives to IEC WG’s IEEE flicker task force has adopted IEC as flicker meter standard – details being finalized IEEE (PQ measurements) and (characterization) being harmonized with

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Future work Review flicker requirements specified in wind power standards, identify conflicts, make recommendations for resolution Request from IEC TC77A WG9 - Dip (sag) / swell / momentary interruption meter test protocol based on requirements Harmonic meter test protocol based on nd Edition and requirements Request from IEC TC 77A to review harmonic compatibility levels

Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Conclusion There are still many power quality issues to understand and solve Pooling of technical resources necessary to maximize progress due to companies limited budgets for standards participation Distributed generation and utility deregulation creating new challenges for managing power quality and reliability CCU2 Web Site –