Phase III Design Development Finalization December 23, 2008 apcosigns.com.

Slides:



Advertisements
Similar presentations
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. architectural.
Advertisements

Subject: Final Presentation of Wayfinding and Signage Design For: Loyola University Health System Date: March 21, 2003 By: APCO Graphics, Inc.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
FP- Level 0FP- Level 1FP- Level 3FP- Level 4FP- Level 5FP- Level 6FP- Level 7 INTERIOR Dining 2 Dining 1 Admitting FLOORPLANS EXTERIOR Site Plan Overall.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Campus signage – Internal
SM2222: Information Design and Visualization Wayfinding: “You Are Here” (YAH) Map 18 November 2005.
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
The Johns Hopkins Hospital New Clinical Building Program Overview April 28, 2008.
SCHEMATIC DESIGN PRESENTATION
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Wayfinding & Signage Update Management Information Forum April 21, 2013.
Measure E Town Hall November 24, 2003 Donna Jones Dulin Gilbane Building Co.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
Elevations.
Blue Prints.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
The Newest and Most Effective Wayfinding Solution for Hospitals, Clinics &Medical Centers Copyright TTSS 2001.
APCO Graphics, Inc. is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this.
Building Plans.
Designated Smoking Areas Update to Proposal for Locations
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Schematic design presentation School of Business South Hall Renovation.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Center for the Arts Towson, Maryland Schematic Lighting Proposal Ben Mitten Architectural Engineering Pennsylvania State University.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Winchester Medical Center Campus Expansion June 21, 2011.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Double Column Product Sign Ground Mounted Carries 1 to 6 Vehicle Franchises Truck, Or Certified Used Vehicle Faces Division emblems appear on 1 & 2 franchise.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Competency: Draw exterior elevations
Corporate Security & Safety “Confidence through Security; Safety for life!” Robert D. Achenbach Corporate Security & Safety Officer Corporate.
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
North Augusta High School Design Development Presentation.
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
1 Symbols Signage Educational Series Part 2: Destination Criteria and Naming.
Learning, Health, and Safety Capital Project Alternates and Change Order
Aanaimalai (Othakadai) Jain’s school and jain beds,bhirami inscriptions on south west side of the hill. It was created at 1 st century A.D. by “eri arithan.
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council March 13, 2012.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
DC Office of Cable Television, Film, Music & Entertainment Angie Gates, Director Proposed Transition Marquee Branding.
The Beverley Taylor Sorenson Arts and Education Complex.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
Environmental Health & Safety, Maintenance and Operations; Major Projects; Sustainability.
MONICA FRANCO. REI FLOOR PLAN Since the space was very huge, it was impossible for me to actually plan the interior space of it. Therefore I decided to.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. architectural.
Special Mention: Copley International Conference Center Upper Level Southeast: Inaccessible Element.
Signage Upgrade Project 2016
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
Penn Medicine Chester County Hospital
CUH Opened December 2014 Replaced St. Paul University Hospital.
Competency: Draw exterior elevations
Wayfinding and Signage
The photo is showing the south side of the building and configuration of the exterior side of the windows. Elevation designs describe the materials and.
Progress Report 11/10/11.
New York City Master Plan Update
Roslin Primary School.
Capital Outlay Workshop
Mandeville Center Upper Level West: Interior Inaccessible Element
North Augusta High School – Phase 2A and 2B
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Presentation transcript:

Phase III Design Development Finalization December 23, 2008 apcosigns.com

Phase III Finalization The Exterior Solution How it Works

Phase III Finalization Exterior Wayfinding Hierarchy How the System will Work Perimeter Identifier Entrance / Drop-Off Valet Parking Campus Entrance Identifier Campus Directional Parking Lot ID 123 4

Phase III Finalization Wayfinding & Design Exterior Sign Placement Perimeter Identifiers - Directs Visitors to Emergency & Hospital Entrance Parking Lot ID Campus Entrance ID’s - Directs Visitors into Correct Entrance Campus Directional - Directs Visitors to Correct Building & Parking Staff or Service Entrances Wall Mounted Building ID Free-Standing Building ID “You Are Here” Locator Map

Phase III Finalization Exterior Wayfinding / Design Perimeter Identifiers Perimeter Identifier - Directs Visitors to Emergency & Hospital Entrance 2

Phase III Finalization Exterior Wayfinding / Design Perimeter Identifiers Side A Side B Location 2

Phase III Finalization Campus Entrance ID’s - Directs Visitors into Correct Entrance Exterior Wayfinding / Design Campus Entrance Identifiers

Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 16

Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 17

Phase III Finalization Exterior Wayfinding / Design Campus Entrance Identifiers Location 35

Phase III Finalization Exterior Wayfinding / Design Staff / Service Entrance Identifiers Staff or Service Entrances

Phase III Finalization Exterior Wayfinding / Design Staff / Service Entrance Identifiers Side A Locations 3, 46, 61, 67 & 68 Side B

Phase III Finalization Exterior Wayfinding / Design Campus Directionals Campus Directional - Directs Visitors to Correct Building & Parking

Phase III Finalization Exterior Wayfinding / Design Campus Directionals - Primary Location 13 Side ASide B Location 9 Side ASide B Location 18 Side ASide B Location 19 Side ASide B Location 31 Side ASide B Location 36 Side ASide B

Phase III Finalization Exterior Wayfinding / Design Campus Directionals - Secondary / Tertiary Secondary Directional Location 24.1 Side B Tertiary Directional Location 60 Side B

Phase III Finalization Wayfinding Halifax Health Branding Building Branding - Identifies Building From a Distance

Phase III Finalization Wayfinding Branding West Location 23 South Location 66

Phase III Finalization Wayfinding Labeling of Building Entrances Fountain Entrance Professional Building Entrance North Tower Entrance Emergency Entrance Ambulance Entrance Oncology Center Lower Entrance Oncology Center Upper Entrance 201 Building Entrance Shuttle Entrance H&F Center Entrance

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Fountain Entrance

Phase III Finalization Fountain Entrance Labeling of Buildings and Entrances New Canopy Location 23 New Canopy Location 22

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Professional Building Entrance

Phase III Finalization Professional Building Entrance Professional Building Freestanding Building ID Location 29

Phase III Finalization Wayfinding Labeling of Buildings and Entrances North Tower Entrance

Phase III Finalization Professional Building Entrance North Tower Entrance Freestanding Building ID Location 30

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Emergency Entrance

Phase III Finalization Professional Building Entrance Emergency Entrance Internally Illuminated Letters Location 56 Internally Illuminated Letters Locations 55 & 57 Building ID Location 54

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Ambulance Entrance

Phase III Finalization Professional Building Entrance Ambulance Entrance Internally Illuminated Letters Location 64

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Shuttle Entrance

Phase III Finalization Professional Building Entrance Shuttle Entrance Building ID Location 63 Cut Dimensional Copy Location 66.1

Phase III Finalization Wayfinding Labeling of Buildings and Entrances H&F Center Entrance

Phase III Finalization Professional Building Entrance Health & Fitness Center Curved Face Plaques Locations 8.1, 8

Phase III Finalization Wayfinding Labeling of Buildings and Entrances Oncology Center Lower Entrance Oncology Center Upper Entrance

Phase III Finalization Professional Building Entrance Oncology Upper & Lower Entrances Cut Dimensional Letters Location 14 Cut Dimensional Letters Location 11

Phase III Finalization Wayfinding Labeling of Buildings and Entrances 201 Building Entrance

Phase III Finalization Professional Building Entrance 201 Building

Phase III Finalization Exterior Wayfinding / Design “You Are Here” Locator Maps

Phase III Finalization Exterior Wayfinding / Design “You Are Here” Locator Maps Campus Map Freestanding Location 25, 39.1 Campus Map Wall Mount Location 20

Phase III Finalization Wayfinding Parking Lot Designations

Phase III Finalization Exterior Wayfinding / Design Parking Lot Identfiers Parking Lot ID

Phase III Finalization Design Parking Lot Identfiers Locations 4.1, 4.2, 4.3 Lot ID Pole Mount Locations 20.1, 20.2, 20.3, 20.4, 20.6 Lot ID Freestanding Locations 4, 5 Locations 15, 20.5, 12 Locations 26, 26.1, 27, 28 Locations 33, 33.1, 37, 38, 38.1, 38.2 Locations 39, 40, 40.1, 40.2, 41 Locations 50, 51, 52, 52.1, 52.2, 53, 58 Locations 48, 59 Locations 60.1, 60.2, 60.3 Locations 43, 44, 45, 49 Locations 64.1, 64.2 Location 21 Valet Parking Location 11.1 Locations 26.2, 26.3 Locations 38.1, 38.2 Locations 40.2, 40.3 Locations 52.1, 52.2 Location 60.3 Location 59.1

Phase III Finalization The Interior Solution How it Works

Phase III Finalization Interior Wayfinding Hierarchy How the System will Work Primary Directory Wall Mounted Directional Elevator Directory Ceiling Mounted Directional

Phase III Finalization Wayfinding Primary Directory Building ID Freestanding Location 31 Primary Directory * Lists Services for Hospital * Lists Building for Service * Lists Floor for Service * Located ED Entrance Tower Entrance Fountain Entrance Shuttle Entrance Both Ends of Connector Sizes Shown: 30” x 18” 30” x 22”

Phase III Finalization Wayfinding Primary Directory Building ID Freestanding Location 31

Phase III Finalization Wayfinding Directionals (Wall Mount) Building ID Freestanding Location 31 Primary Wall Mounted Directional * Directs to Elevators * Directs to Services on the level it is located on * Directs to Building Entrances * Located at: Primary Visitor Decision Points Where Wall Space is Available

Phase III Finalization Design Interior Building ID Freestanding Location 31 Room Identification

Phase III Finalization Wayfinding Directionals & Elevator ID (Ceiling Mount) Building ID Freestanding Location 31 Ceiling Mounted Directional * Additional Wayfinding Help * Located at: Primary Decision Points

Phase III Finalization Wayfinding Elevator ID & Directory Building ID Freestanding Location 31 Elevator ID & Directory * Shows Visitors Which Elevator they Viewing * Lists Services that are Accessed Using This Elevator * Shows Floor Service is Located on * Located at: Each Elevator Bank

ED Exam Room Numbering Final Ground Floor B D C A F H G E I J H96 H95 H94 H93 H92 H91 H90 H89 H88 H87 H86 H85 G84 G83 G82 G81 G80 G79 G78 G77 G76 G75 G74 G73 I102I101I100 I99 I98 I97 F72 F71 F70 F69 F67 F66 F65 F64 F63 F62 F61 E60 E59 E58 E57 E56 E55 E54 E53 E52 E51 E50 E49 D48 D47 D46 D45 D44 D43 D42 D41 D40D39 D38 D37 C36 C35 C34 C29 C28 C27 C26 C25 B24 B23 B22 B21 B20 B19 B18 B17 B16 B15 B14 B13 A12 A11 A10 A9 A8 A7 A6 A5 A4 A3 A2 A1 J103 J104 J105 J106 J107 C30 C31 C32 C33 J108 J109J110 Phase III Finalization

Phase III Finalization Building ID Freestanding Location 31 ED Exam Room Numbering Final Ground Floor

Phase III Finalization Wayfinding Signage Within the North Tower

Phase III Finalization Wayfinding Signage Within the North Tower At Ground & 1st Floor Elevator Banks

Phase III Finalization Wayfinding Signage Within the North Tower North End of Waiting AreaSouth End of Waiting Area

Phase III Finalization Wayfinding Signage Within the North Tower

Phase III Finalization Wayfinding Signage Within the North Tower

Phase III Finalization Wayfinding Interior Campus-Wide Elevator A

Phase III Finalization Wayfinding Interior Campus-Wide Across from Elevator A Level 1 BeforeAfter

Phase III Finalization Wayfinding Interior Campus-Wide BeforeAfter Main Lobby Corridor North Tower

Phase III Finalization Wayfinding Interior Campus-Wide Connector Fountain Building BeforeAfter

Phase III Finalization Wayfinding Interior Campus-Wide BeforeAfter Elevator B Level 1

Phase III Finalization Design Interior Campus-Wide Building ID Freestanding Location 31 Elevator B Level 1 BeforeAfter

Phase III Finalization Wayfinding Interior Campus-Wide Staff Elevator Across from B Level 1

Phase III Finalization Design Interior Campus-Wide Building ID Freestanding Location 31 Corridor to Radiology BeforeAfter

Phase III Finalization Design ADA Addition Building ID Freestanding Location 31

apcosigns.com Phase III Finalization