Team HazardHawk Team HazardHawk 2008. Last Week  Concept Finalization Complete  Preliminary CAD of Concept Complete  Budgetary Estimates Parts Selection.

Slides:



Advertisements
Similar presentations
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Advertisements

Week 10 - Project Today: – Team formation: 3 or 4 students each – Schedule: Progress meetings – during April Oral presentation/demo – final exam day Written.
Autonomously Controlled Front Loader By: Steve Koopman and Jerred Peterson Advisor: Dr. Schertz.
 Air! A pneumatic assembly is one that converts energy stored in compressed air to mechanical energy. Electrical Energy Compressed air Mechanical force.
VEX Drive Systems Presented by Chani Martin Lauren Froschauer Michelle Gonzalez Presented by Chani Martin Lauren Froschauer Michelle Gonzalez.
Fishing FishingBot is a robot looks like a fish. It can make to bite fishing needle as closing mouth with Servo Motor when Infrared Sensor Board detects.
Today – Wednesday, May 22, 2013  EOC Practice Test #1 – Second half  Learning Target : Assessment of Ch. 10 concepts  CH. 10 TEST TODAY!
Autonomous Metal Detector Vehicle (AMDV)
Mechanical Design of Robots. High School Competitions.
Section 5-8.  The dashboard of your car gives you a lot of information about your car’s ability to go  It gives no information about your car’s ability.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
Project WindBot Mikhail Bruk Anton Talalayev Momchil Dimchev Mechatronics Design Project
A fully autonomous robot designed to navigate and solve a maze.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts September 14, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Ground Scouts Robotics P09207 Week 4 Update Concept Selection System Level.
October 21, 2003 ECE Senior Design1 Autonomous GPS-BOT Preliminary Design Review by Kery Hardwick, Yevgeniy Khasanov, Naoya Kinuta, Zhe Chuan Luo.
GPSBot08 System Overview.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey October 3, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey November 9, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Low Cost Fundus Camera P15590 December 11th, 2014
Marketing Spy Bander Alenezi Anthony Do Phu Nguyen Golriz Sedaghat ECE411 Practicum Project Fall 2014.
BugBot is a robot that walks with 6 legs not using wheels Bug.
VEX Drive Systems Presented by Chani Martin Lauren Froschauer Michelle Presented by Chani Martin Lauren Froschauer Michelle.
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
Team HazardHawk Team HazardHawk 2008 April 24, 2008.
PDR #8: Parts, Sources & Costs Team ACME Andrew Henebry, Tom Lauducci, Megan Snyder, Tim Stonelake.
Project Proposal: Student: Rowan Pivetta Supervisor: Dr Nasser Asgari.
Visual Target Tracking System Final Design February 26, 2003 Chad Helm Matthew Sked James Deloge Tim Bagnull.
Team John Deere Weekly Status Report Week 4 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt Wade Burch.
Autonomous Metal Detector Vehicle (AMDV) Jared Speer Lamar Williams Jr. Nathan Stephan University of Central Oklahoma Department of Engineering and Physics.
TEAM 5248 FERMION Members: Yi, Justin, Hamza , Ben, Marcus, Sean, Sai, Devin, Christine, Erin.
Lecture 23 Dimitar Stefanov. Wheelchair kinematics Recapping Rolling wheels Instantaneous Centre of Curvature (ICC) motion must be consistent Nonholonomic.
Ali Alkuwari Patrick SwannJad FarahMarcus SchafferKorhan Demirkaya Long QuyDenden TekesteNgoc MaiSteven Weaver.
Abstract The Infrarat is an autonomous toy car that will use proximity sensors and a pivoting array of Infrared sensors for tracking a body and to avoid.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
Scrumm meeting. Mechanical Done. Tire vs belt? Tire chosen. What to do? Do a prototype of a car. Continue with design.
Team Concept and Key Issues AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 16 September.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Turn in lab 3. Put your name, perm number and lab section on your answer sheet.
Group 7 Project 1 Presentation Robert Moe John Zumwalt Mark Woehrer Celi Sun.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Software Narrative Autonomous Targeting Vehicle (ATV) Daniel Barrett Sebastian Hening Sandunmalee Abeyratne Anthony Myers.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
DEVRY CIS 321 Week 1 Milestone 1 Check this A+ tutorial guideline at For more classes.
DBM 265 Week 5 Learning Team Assignment Virtual Organization Project Proposal Paper and Presentation This paper is based on Smith Consulting Client Project.
MGT 598 STUDY Education for Service-- mgt598study.com.
100 g Locomotion Thursday March 26, Ryan Lehto Propulsion Group
Small, Lightweight Speed and Distance Sensor
The Daisy Ridleys Michael Fanton – ME Joey Campion – ME
Preliminary Detailed Design Review: P18001
Presentation transcript:

Team HazardHawk Team HazardHawk 2008

Last Week  Concept Finalization Complete  Preliminary CAD of Concept Complete  Budgetary Estimates Parts Selection ○ Complete Material Selection ○ Complete Team HazardHawk 2008

Last Week  GPS and Infrared Testing Complete  Select Trade Study Topics Complete  Complete Concept Memo Incomplete Team HazardHawk 2008

Concept Status  Body: 2.5’ x 1.3’ x 1’  Arm: Two 30” segments Retractable Equiped with two infared sensors Can swivel 180 o Powered by 12-V DC Motors  Tank Drive Each side powered by a 24-V DC Motor  LCD Display w/Keypad Team HazardHawk 2008

CAD

Preliminary Budget Team HazardHawk Budget ItemCommentsQTYPrice L-BracketHome Depot - For Body8$4.64 HingeHome Depot - For Body2$2.43 HDPEMcMaster-Carr #9785T1621$ MotorMerkle - Korff 24V Gear Motor2$40.00 MotorBi-Polar 2 Phase Motor2$20.00 Drive ShaftMcMaster-Carr #8632T91$22.27 SprocketMcMaster-Carr #6280K3212$15.24 SprocketMcMaster-Carr #6280K3844$50.32 Rod Hobby Lobby Carbon Fiber.5x10x1000mm1$21.00 Screws/BoltsBolts+Nuts100$15.00 HingeFor Arm2$8.50 Battery From Mr. Brownell - 24V Borrowed2$0.00 Gear15 Tooth 1 in.2$23.30 ChainMcMaster-Carr #6261K ft.1$19.18 Chain McMaster-Carr #6261K261 - Connector1$1.34 RingsMcMaster-Carr #98430A138100$8.00 WheelsMcMaster-Carr #2331T184$46.16 BearingsMcMaster-Carr #2705T248$25.92 TOTAL $438.68

GPS Test Results  Data taken on 1/30/2008 Test 1: Start at an arbitrary location, move away from the location for 5 minutes and then return to the location and determine whether coordinates are the same. ○ Start: N , W ○ End: N W Test 2: Start at an arbitrary location, move a great distance away from the location, and looking only at the GPS, return to the starting coordinates. ○ Start: N , W ○ End: ~Six feet from target

Trade Study Topics  Infrared Sensor Sensitivity Kerry  Kalman Filtering Techniques for Improving GPS Precision Tim  Kinematic Analysis of the Arm Mechanism Andy  GPS: Accuracy, Optimal Usage, etc. Dave  Feasibility of Using Wheel Encoders to Improve Navigation Guillermo

Action Items  Complete Concept Memo We will initiate this today (2/5/08) during our group meeting and divide the memo into parts Individual Assignments will be completed by Thursday (2/7/08) The memo will be compiled during the group meeting on Thursday (2/7/08)  Trim Budget Investigate Different or Scrap Material for body Look into used wheels Talk to Mr. Brownell about less expensive motors Team HazardHawk 2008

Action Items  Order Parts We will put in our online McMaster -Carr order on Friday (2/8/08) after double checking our B.O.M and consulting with Mr. Brownell and Prof. Strebinger on our arm material selection  Complete Trade Study Proposals Individuals will complete their assigned proposals by 2/12/08

Team HazardHawk 2008