Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.

Similar presentations


Presentation on theme: "Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair."— Presentation transcript:

1 Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair

2 Introduction Project Definition: – Develop a Robotic Football Competition and produce a proof-of-concept prototype. Discussion: – Budgeting Review & Revised Concept. – Component Purchasing & Trade Studies.

3 Previous Week’s Action Items Item 1: Preliminary Budgeting Review – Wrote the first draft of concept design parts list and pricing. – Divided budget into categories and individual components. – Estimated the current total cost at $370.00

4 Budget Sheet Summary: Component:Cost ($): Motors:50.00 RC, Servo, DC Stepper Electrical:170.00 Mini Max, H-Bridge, Batteries, Speed Controller Materials:150.00 Rotating Platform, Field, High Density Polyethylene, Velcro, Ball TOTAL:370.00

5 Previous Week’s Action Items Item 2: Revised Robot Concept Designs – Simplified Quarterback and Running Back/Receiver model. – Based both models on similar chassis design. – Robot Dimensions: Height – 8 1 / 2 ” Depth – 5” Width – 5” Thickness – 3 / 16 ”

6 Current Status of Concept Status of the Design – Conceptual design phase. – Established first draft of budget. – Developed revised prototype sketch with dimensions and CAD model.

7 Current Graphic

8 Next Week’s Action Items Item 1: Purchase Budgeted Components – Investigate concept design components. Component options unrelated to trade study topics: – Second Mini-Max/PIC. – Speed Controller. – H-Bridge. – Research supplier pricing. – Buy components necessary to concept design.

9 Next Week’s Action Items Item 2: Develop Trade Studies – Investigate individual trade study topics. – Build programs and models for each topic. – Meet to report individual progress to the group on 2/19 and 2/21.

10 Conclusion Important Points: – Budgeting Review. – Revised Concept. – Component Purchasing. – Trade Studies Development.

11 Questions? Any questions?