Preparing a Woodlot Licence Plan A Joint Presentation of: Federation of BC Woodlot Associations Ministry of Forests Prepared by: A.J. Waters and Associates.

Slides:



Advertisements
Similar presentations
Forest Legacy Assessment of Need Identifying Future Forest Legacy Areas Governors Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
Advertisements

Forest Practices Code Transition Planning and Silviculture John McClarnon Regeneration Specialist MOF.
The State of GAR From MOE’s Experience PFIT “Learnings” Workshop October 16, 2007.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Forest Practices Code Transition Planning Ian Miller Legislation and Policy Forester, MOF.
Montana Department of Natural Resources & Conservation Trust Land Management Division Forest Management Program Presented by: Gary Frank Resource Program.
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
Guide to Developing FDP Stocking Standards
1 Writing Landscape Unit Objectives 2 Planning for Old Growth Retention Data Preparation Delineate OGMAs Develop WTR Targets Write LU Objectives Establish.
Peace Connectivity Network A Presentation By Brian Churchill, Phacet, 2004.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Thanks for joining us. We’ll be starting soon. To join the teleconference, dial , passcode # To download handouts : Click the Handouts.
Forest Practices Code Transition Protection of Environmental Values Rod Davis Manager, Ecosystem Planning and Standards, WLAP.
Forest Practices Code Transition Roads With Ron Davis Chief Engineer, MOF.
Lakeshore Development Guidelines A Primer Charlie Lake Conservation Society September 2007.
Small Scale Salvage Program Application Process. Purpose To establish an application and approval process for small scale timber salvage that is efficient,
FSP Extensions Delivered by: Paul Picard, Del Williams Forest Tenures Branch.
1 Forest and Range Practices Act: Forest Stewardship Plans.
USING CONSERVATION COVENANTS TO PROTECT PRIVATE LAND Judy Atkins Hillyer Atkins.
Forest Management Planning
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Most Common Conservation Practices Forestry Illinois.
Forest Practices Code Transition Woodlots & CFAs Al Waters Senior Woodlot Licence Forester, MOF.
Amendments to the Woodlot Licence Forest Management Regulation February 26, 2001.
Open Space Residential Development Bylaw Town of Rehoboth.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
Proposed Action Purpose and Need A proposal to authorize, recommend, or implement an action in response to the need identified in the Purpose and Need.
Atlin/Taku Land Use Planning Forestry Chapter Presentation to Multiparty Workshop #4 June 19, 2009.
Natural Resource Information Systems Aquatic Organism Passage Managing your Data in INFRA and NRIS Water Brian Sanborn USFS – NRIS Water/Air Region 9 –
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Accomplish More Together Conservation Planning for Green Infrastructure: A Greenprint for Sustainability Michael S. Fishman, CWB, PWS Greg Liberman, CPESC.
FN Cultural Heritage Resources The WLP must specify a strategy for conserving and protecting “cultural heritage resources” that are the focus of a traditional.
Forest Planning and Practices Regulation Amendments to Protect Secondary Structure Joint Presentation of: Joint Presentation of: Federation of BC WoodlotAssociationsFederation.
The Balcones Canyonlands Conservation Plan, Balcones Canyonlands Preserve, & Public Service Infrastructure William A. Conrad Secretary BCCP Coordinating.
1 FRPA Quiz Show Harvesting & Roads Module FRPA Training Program February 2004.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Context for Objectives in FRPA Dave McBeth, RPF Land Use Specialist MFR, Operations Division HQ.
Range Planning 1 & Objectives & Objectives The Focus is on Results.
1 FRPA Quiz Show Overview Module -- Break 4 FRPA Training Program February 2004.
Nine Alternative Performance Requirements You Can Propose 1.Soil Disturbance Limits 2.Permanent Access Structure Limits 3.Stocking Standards, Regeneration.
1 FRPA Quiz Show Silviculture Module FRPA Training Program February 2004.
Watershed Management Muhammad Dilshad Habib 2004-ag-1414
Forest Practices Code Transition Protection of Environmental Values Rod Davis Manager, Ecosystem Planning and Standards Ministry of Water, Land and Air.
Helping Communities Protect Wildlife Habitat Emily Brunkhurst Wildlife Biologist NH Fish and Game Taking Action for Wildlife.
12 July 2010 NYS Department of Environmental Conservation Division of Environmental Permits Critical Environmental Areas Under SEQR What Do They Mean?
1 Lessons Learned On the Second Entry in a Cariboo Mule Deer Winter Range Alex Fraser Research Forest Ken Day, Manager SISCO Winter Workshop, February.
1 Summary Range Planning & Practices Workshop. Summary 2 Topics Covered Summary of key points Working in the transition phase Meeting the objectives of.
1 ABCFP Policy Review Seminar 2009 Forest and Range Practices ABCFP Policy Review Seminar 2009: Forest and Range Practices.
Forest Practices Code Transition Public Input and First Nations Consultation for Operational Planning Ian Miller, Legislation and Policy Forester, Ministry.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
1 FRPA Quiz Show Overview Module - Break 3 FRPA Training Program February 2004.
1 RESULTS BASED CODE. 2 Results Based Code Timeframes Introduce “package” this session –F&RPA –Amendments to FPC (streamlining) –Biologist’s Act –Amendments.
Overview of Funding Sources Land and Water Conservation Fund Act (LWCF) 1965 (includes Forest Legacy and other Cooperative Conservation Programs) & Federal.
1 FRPA Overview Range Planning & Practices Workshop.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
Land Protection. Conservation Restriction (CR) Voluntary legal agreement that protects land forever from being developed.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Forest Management in BC
Crown expectations for small stream outcomes under FRPA
Parks and Recreation Commission
An Alternative to Skyline Blight
FRPA Silvicultural Tests2 2: MOFR, 2006
Small Scale Salvage Program
Information Sharing and
Preserving and Conserving Agricultural Lands:
for the GOVERNMENT ACTIONS REGULATION WORKSHOP
Farm Consulting Assignment
Speaker Notes: Objectives & Range Practices Under FRPA
Guide to Developing FDP Stocking Standards
Presentation transcript:

Preparing a Woodlot Licence Plan A Joint Presentation of: Federation of BC Woodlot Associations Ministry of Forests Prepared by: A.J. Waters and Associates Inc. 1 Fall 2005

Agenda 8:30 Introductions, Course Overview and Goals 8:45 Woodlot Licence Plan – Term, Signature and Plan Area 9:00 Map and Information Required – Management Objectives 10:00Break 10:15 Map Exercise: Identify Areas Where you will Avoid or Modify Harvest Describing Timber Harvesting Modifications 12:00Break 1:00 Protecting and Conserving Cultural Heritage Resources Writing a Wildlife Tree Retention Strategy 2:00 Measures for Invasive Plants & Natural Range Barriers Preparing Stocking Requirements for Specified Areas Performance Requirements and Alternatives 3:00Break 3:15 Exercise: Writing Alternative Performance Requirements Disclaimer and RPF Signature 4:00 Supplemental Information 4:15 Normal and Emergency Approval Woodlot Licence Plan Amendments2

Workshop Objectives During this workshop you will:  complete most of your WLP  understand the links between WLP content and practice requirements  learn which parts of the WLP must be signed by an RPF3

The Basic Components of a Woodlot Licence Plan  Map and information  Areas where harvesting will be avoided or modified  Strategy for FN cultural heritage resources  Wildlife tree retention strategy  Stocking standards  2 written measures  Alternative Performance Requirements (optional)  Signatures  Supplemental Information Gavin Lake Use a portion of UBC/Alex Fraser Research Forest (Gavin Lake Block) with Lakes, streams, roads, topography as an example. Area shown about 600 ha.4

Woodlot Licence Plan Template A large part of the workshop will be spent filling out a version of the WLP template that provides example wording to help you create your own WLP.5

Woodlot Licence Plan Term6

Signature of the WL Holder  If a WL is held by a corporation or FN band, the WLP must be signed by a person authorized on behalf of the corporation or FN band  If a WL is held by an individual, the WLP must be signed by the WL holder or a person authorized by the WL holder  A WL holder can provide a letter to the District Manager indicating another person is authorized to sign on behalf of the WL holder7

The Woodlot Licence Plan Area The Woodlot Licence Plan Should normally cover the entire woodlot licence area Can cover a smaller area if the District Manager is satisfied no timber harvesting or road construction will take place on the area not being addressed Under normal circumstances CPs and RPs can only be issued over areas covered by the WLP Gavin Lake Clearly identify if a portion of the woodlot licence area is not covered by the plan! 8

Woodlot Licence Plan Area 9

Gavin Lake Topography Information from Existing Maps  Forest Cover  Topography (Contours)  Streams, Wetlands & Lakes  Fish Streams Utilities FdSx110 PlSx110 SxFdCw 841 FdSxPL 641 FdSxBl(Cw)841 FdSxPL 641 FdSx 641 FdSx 430 Cw Bl 730 SxFd 641 FdEp 631 FdSxPL 641 Forest Cover10  Biogeoclimatic Ecosystem Classification to the Subzone  Public Utilities on Crown Land

Wildlife Habitat Areas  Wildlife habitat areas must be identified on the WLP map or text unless the DM grants an exemption because the location of the wildlife habitat area must not be disclosed  “Primary forest activities” (harvesting, silviculture treatments, road construction, maintenance and deactivation) must comply with any general wildlife measure established for a wildlife habitat area11

Scenic Areas  Scenic areas need to be identified or described on the WLP map or in the WLP text  Do not identify the visual sensitivity classes that apply to parts of the scenic area as this will require the WLP to be amended when visual quality objectives are established Gavin Lake12 Scenic Areas

Ungulate Winter Ranges  Any ungulate winter ranges need to be identified on the WLP map or text  Understand any objectives or general wildlife measures for the ungulate winter range Mule Deer Winter Range Gavin Lake13

Community or Fisheries Sensitive Watersheds  The WLP must identify or describe any community watersheds or fisheries sensitive watersheds which overlap the WL area  WLP must be consistent with any water quality objectives for a community watershed or any fisheries sensitive watershed objectives.14

Community or Domestic Water Supply Infrastructures  The WLP must identify or describe any community or domestic water supply intakes that are licensed under the Water Act and any related water supply infrastructures which exist on or adjacent to the WL area15

Sensitive Soils Slopes >60% Contiguous areas of sensitive soil  The WLP must identify contiguous areas of sensitive soil  Sensitive soil is defined as an area with a slope > 60 % or indicators of potential slope instability Gavin Lake16

Maps and Information for Roads  Existing Roads  Temporary and Permanent barricades to restrict vehicle access Gavin Lake17

Private Property  Private property within or adjacent to the woodlot licence area must be identified or described in the WL plan  adjacent is no longer defined in regulation but means near or contiguous Gavin Lake Private Land18

Certain are Confidential Resource Features Gavin Lake  Resource Features19 Karst Range Developments Research Plots Snow Course Cultural Heritage Resource associated with traditional use Recreation sites, trails, facilities and features