Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March 26-30 2010 Bruce Schumm Santa Cruz Institute for Particle Physics.

Slides:



Advertisements
Similar presentations
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Advertisements

Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
Beyond the Large Hadron Collider: R&D Towards an International Linear Collider Bruce Schumm SCIPP & UC Santa Cruz San Jose State Physics Seminar April.
Highlights from the Tracking Sessions 12 talks in three sessions Rough accounting: ILD SiD Generic OR- Gaseous Solid State
SCIPP R&D on the International Linear Collider Detector SCIPP Review May 18, 2006 Presenter: Bruce Schumm.
The SCIPP LSTFE Time-Over- Threshold Electronics Readout Project SILC Meeting, Santander, Spain December, 2008 Bruce Schumm Santa Cruz Institute.
SCIPP R&D on the International Linear Collider Detector SCIPP Review November 29, 2005 Presenter: Bruce Schumm.
E cm up to 1 TeV, de- pending on site chosen Design luminosity of 2x10 34 cm -2 s -1 Beam spot: 550x5.7 nm Crossings every 337 ns for about 1  s; repeats.
Thoughts on B-Field Uniformity for the SD Tracker SID Tracking Meeting October 22, 2004 Bruce Schumm UC Santa Cruz March 2001 Baseline Thanks to Harry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Tracking Efficiency and Momentum Resolution Analysis Chris Meyer UCSC ILC Simulation Reconstruction Meeting March 13, 2007.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
CURVATURE RECONSTRUCTION PERFORMANCE SLAC ILC Simulation Meeting September Alex Bogert (Undergraduate student) Bruce Schumm Question: ILD Higgs.
SCIPP R&D on Long Shaping- Time Electronics 4 th SiLC Meeting Barcelona, Spain (by remote connection) December Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Long Shaping- Time Electronics ALCPG Workshop Vancouver, BC, Canada July 19-22, 2006 Bruce Schumm.
SCIPP R&D on Time-Over- Threshold Electronics and Long- Ladder Readout LCWS 07 DESY May 30 – June Bruce Schumm Santa Cruz Institute for Particle.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Tracking Simulation Studies at UC Santa Cruz Bruce Schumm UCSC/SCIPP LCWS07 DESY May 30-Jun Tracking Validation Studies Non-prompt tracks with SiD.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
ILC Tracking R&D at SCIPP SiD Workshop Thursday, June Bruce Schumm Santa Cruz Institute for Particle Physics.
Chevron / Zigzag Pad Designs for Gas Trackers
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
The Santa Cruz Linear Collider Group Simulation Effort SiLC Workshop Prague, Czech Republic April 26, 2007 Bruce Schumm.
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
ILC Instrumentation R&D at SCIPP ILCWS ‘08 University of Illinois at Chicago November Bruce Schumm Santa Cruz Institute for Particle Physics.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
Momentum resolution study of LDC 6 th SiLC meeting, Torino, Dec M. Regler, M. Valentan Interplay of TPC and SET: influence on the momentum.
New LDC optimization studies... ILD Workshop, DESY-Zeuthen, 14–16 Jan M. Regler, M. Valentan presented by W. Mitaroff New LDC optimization studies.
Report on the UCSC/SCIPP BeamCal Simulation Effort FCAL Clustering Meeting 24 June 2015 Bruce Schumm UC Santa Cruz Institute for Particle Physics.
R&D Towards a Linear Collider Detector DOE Site Visit Wednesday July 27, 2011 Senior: Fadeyev, Schumm, Spencer Students: Bogert, Carman **, Chappelletvolpini.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Studying the efficiency and the space resolution of resistive strips MicroMegas Marco Villa – CERN MAMMA meeting Tuesday, 13 th December 2011 CERN, Geneva.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Development of radiation hard Sensors & Cables for the CBM Silicon Tracking System Sudeep Chatterji On behalf of CBM-STS Collaboration GSI Helmholtz Centre.
Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 8, 2006 Presenter: Bruce Schumm.
VXDBasedReco TRACK RECONSTRUCTION PERFORMANCE STUDIES Bruce Schumm University of California at Santa Cruz ALCPG Workshop, Snowmass Colorado August 14-28,
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
Tracking: An Experimental Overview Richard Partridge Brown / SLAC Fermilab ALCPG Meeting.
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Rint Simulations & Comparison with Measurements
Thought on SCIPP’s Participation in SiLC Test Beam Activities
Time-Over-Threshold Readout Long Ladder Readout Noise
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Radiation Damage Studies for Solid State Sensors Subject to Mrad Doses
FCAL Activity at the UC Santa Cruz Institute for Particle Physics (SCIPP) Bruce Schumm Principle Investigator 1.
ILC Instrumentation R&D at SCIPP
International Tracking Testbeam Needs
Presentation transcript:

Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics

Faculty/Senior Vitaliy Fadeyev Alex Grillo Bruce Schumm More Students Dale Owens Sheena Schier Dustin Stolp Aaron Taylor Capella Yee Students Alex Bogert Jerome Carman Kelsey Collier Spencer Key Jared Newmiller The SCIPP/UCSC SiLC/SiD GROUP (R&D Participants) Lead Engineer: Ned Spencer Technical Staff: Max Wilder, Forest Martinez-McKinney All participants are mostly working on other things (BaBar, ATLAS, biophysics…) Students: undergrad physics and/or engineering majors at UCSC

Current Areas of Inquiry ILC-Specific Instrumentation SiD sensor testing Performance of KPIX as a tracking chip LSTFE front-end chip development Generic Instrumentation Charge division and longitudinal resolution Noise sources in high-resolution limit Red = topics covered in this talk

Current Areas of Inquiry Cont’d Simulation Tracking performance Non-prompt track reconstruciton Meta-stable stau signatures Red = topics covered in this talk

Charge Division for Silicon Strip Sensors

But: Add neighboring strips in simulation…

Readout Noise for Linear Collider Applications

Use of silicon strip sensors at the ILC tend towards different limits than for hadron collider or astrophysical applications:  Long shaping time  Resistive strips (narrow and/or long) But must also achieve lowest possible noise to meet ILC resolution goals. How well do we understand Si strip readout noise, particularly for resistive networks? How can we minimize noise for resistive networks?

Standard Form for Readout Noise (Spieler) Series Resistance Amplifier Noise (series)Amplifier Noise (parallel) Parallel Resistance F i and F v are signal shape parameters that can be determined from average scope traces.

CDF L00 Sensor “Snake” CDF L00 strips: 310 Ohms per 7.75cm strip (~3x GLAST)  Long-ladder readout noise dominated by series noise (?) Construct ladder by bonding strips together in “snake” pattern (Sean Crosby) At long shaping-time, bias resistors introduce dominant parallel noise contribution  Sever and replace with custom biasing structure (significant challenge…) Thanks to Sean Crosby and Kelsey Collier, UCSC undergraduate thesis students

Expected Noise for Custom-Biased L00 Ladder Spieler formula suggests that series noise should dominate for ladders of greater than 5 or so sensors.

CDF L00 Sensor “Snake” CDF L00 “Snake” LSTFE1 chip on Readout Board

Readout Noise Results Relative to prior results, have explored “center- tapping” (reading out from center of chain rather than end. Naïve expectation Expectation with measured shape factors F i, F v Measured (end readout) Measured (center-tap)

Summary of Findings Reading out from ladder from end: Significantly less noise observed than expected (network effects ignored in formulation of expectation?) Reading out from middle (“center tap”): Noise seems further reduced (~20%) for lengths for which series noise dominates Will explore with P-SPICE simulation…

CURVATURE RECONSTRUCTION PERFORMANCE 1.Compare width of Gaussian fit to residuals with two different estimates: Error from square root of appropriate diagonal error matrix element Error from Billior calculation ( LCDTRK program) 2.Only tracks with all DOF (5 VTX and 5 CT layers) are considered. 3.Require |cos  | < 0.5 Mixture of q/qbar at 500 and 1000 GeV, tau samples at 500 GeV; also use single muons

CURVATURE ERROR vs. CURVATURE LCDTRK calculation (no beam constraint) Gaussian fit SiD02 Detector Model

Results for Stiff, Central Tracks In terms of  p /p, comparing ,  with p=100 GeV and |cos  | < 0.5 we find   LCDTRK 0.28%0.28% Residuals 0.37%0.39% LOI Result0.33% ----  Delhi group (Kirti Ranjan et al.) looking into developing Kalman Filter fitter

SCIPP ILC DETECTOR R&D SUMMARY Charge division resolution ~6mm (for 10cm ladder) Resolution somewhat degraded by inter- strip coupling Network effects may mitigate series noise for ILC  -strip applications Center readout may further reduce noise Full-simulation curvature resolution may not yet be optimized  improvement with Kalman filter?