July 4 th Operation Fast Forward Safarian, Kaz, PM.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Hurricane Preparedness in South Carolina Jim Feda, P.E. Director of Maintenance.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Simpson County Travel Demand Model July 22, 2003.
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
Rick Via Statewide Incident Management Program Manager Office: Leveraging Technology & ITS to Enhance Traffic.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Pedestrian rights and responsibility (a) Upon the immediate approach of an authorized emergency vehicle making use of an audible signal meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
Regional Traffic Monitoring System for Maryland’s Eastern Shore Dr. Gang-Len Chang Traffic Safety and Operations Lab University of Maryland, College Park.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
Talking Operations Seminar on Emergency Transportation Operations & Planned Special Events - The DDOT Perspective - Joe Kammerman Homeland Security Coordinator.
1 Regional Priority Bus Projects List Steve Yaffe, Arlington County December 17, 2008 TPB Regional Bus Subcommittee Presented to the Transportation Planning.
May 2007 Developing a Walk-Out Evacuation Plan for Washington, DC TRB National Transportation Planning Applications Conference by Phil Shapiro, VHB.
Keir Opie National Center for Transportation and Industrial Productivity (NCTIP) New Jersey Institute of Technology (NJIT) Paramics North American User.
RELIEVING CONGESTION Keeping the Nation’s Arteries and Travel Ways Unclogged ~Anyesha Mookherjee Traffic Engineer, URS Corp.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Incident Management in Central Arkansas: Current Settings and Proposed Extensions Weihua Xiao Yupo Chan University of Arkansas at Little Rock.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Fall 2008 Spring 2009 Review TPB Technical Committee 10/2/2009, Item #6 TPB Technical Committee 10/2/2009, Item #6 1.
RESF-1 Transportation Kick-Off Workshop Chair: Natalie Jones-Best (DDOT) April 19 th, am to 12 noon.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
RESF-1 Transportation July 2006 Meeting Chair: Natalie Jones Best (DDOT) July 26 th, pm to 3pm.
Traffic Incident Management F/Lt. Monica Yesh Post Commander, Metro South Michigan State Police.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Buddy.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Traffic safety & Operations Laboratory Traffic safety & Operations Laboratory DC MPD DC MPD March 2009 Traffic Simulation of Chartered Bus Operation Plan.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Bharath Paladugu TRPC Clyde Scott Independent Consultant
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Update on COG Incident Management and Response (IMR) Action Plan Recommendations: Back-Up Power for Traffic Signals Marco Trigueros, P.E. COG/TPB Staff.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
Spring 2010 Campaign Briefing George Branyan Pedestrian Program Manager District of Columbia Department of Transportation Transportation Planning Board.
Lecture 6: Stop Sign Control & Signalized intersections & Design LOS Explain there is hierarchy of intersection control Use the warrants for 2-way stop.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Technology and Resources In “Quick Clearance” Incident Management.
NRO Incident Management (IM) Activities FAMPO Policy Committee Meeting February 22, 2010.
Introduction Study area Existing problem Objective Methodology Results and Conclusions Recommendations.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
1 Update on the Congestion Management Process (CMP) and Related Data Activities Wenjing Pu COG/TPB Staff Travel Management Subcommittee Meeting May 26,
Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008.
1 Item #8 Progress Report on Actions to Improve Regional Transportation Communication and Coordination During Incidents Ronald T. Burns Maryland Department.
Idaho State EMS Communications Center. Department of Health and Welfare Division of Health Bureau of EMS and Preparedness –Standards and Compliance –StateComm.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
Share The Road Traffic Safety Program Sausalito Police Department’s.

Integrating Transit and Highway Solutions In High Volume Corridors
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Metropolitan District | mndot.gov
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Navigating Multiple Jurisdiction
Presentation transcript:

July 4 th Operation Fast Forward Safarian, Kaz, PM

Background:  Evacuation routes  Evacuation traffic signal timing

Purpose:  Evacuation signal timing test, at the conclusion of the July 4th fireworks.  Test evacuation assumptions and strategies.  Coordination with other District agencies and its Regional partners conduct  Collect data during a Regional event that includes both heavy vehicular and pedestrian traffic.  Public safety will remain the priority for all public safety agencies.

District Agencies:  DDOT  MPD  NPP  Fire  WMATA  HSEMA

Regional Partners:  VDOT Arlington county Fairfax County  MDOT Montgomery County Prince Georges County

Operation Routes:  Route # 1 – Georgia Ave (from 7th and F St NW to Beltway)  Route # 2 – Pennsylvania Ave eastbound  Route # 3 – Connecticut Ave to Beltway  Route # 4 – 14th street south bound  Route # 5 – K Street westbound/Whitehurst freeway/Canal road

Operation Routes:

Operation Parameters  Traffic Signal Timing  Traffic Management Center  Dynamic Message Signs  Traffic Control Officers  Traffic Signal Technicians  MPD Officers  Roadway Operation Patrols  Cone Crews  Data Collection Crews  System Inspection oversight Division  DDOT ELOs  800MHz Radios

Operation Timing and Duration:  The operation starts right after the conclusion of the fire works.  It lasts for 2 hours

Operation Procedures:  240s CL for all 5 selected routes in coordination with VA and MD.  7 th ST/Georgia Ave.(Simulation Route) EB, WB and SB moving restrictions at the 6 critical intersections  All motorists are directed to turn to northbound direction  14 th ST Bridge. HOV lane reversal Always a last minute decision by MPD Requires coordination with VDOT and MPD DDOT 800MHz radios used for communications with VDOT

VMS 1: “EVAC/IN/PROGRESS” / “LEFT/TURN/ONLY” VMS 2: “EVAC/IN/PROGRESS” / “RIGHT/TURN/ONLY ” Critical Intersections Traffic control:

Data Collection:  Both vehicular and pedestrian  Traffic simulation area  Data collection means Recording cameras Manual counts Travel time runs VDOT Mobile Units