1 Bharath Paladugu TRPC Clyde Scott Independent Consultant Ming-Bang Shyu Fehr & Peers TRPC Smart Corridors: implementing DTA using DYNAMEQ The 22nd INTERNATIONAL Emme UsERS’ CONFERENCE September 16, 2011 Portland, or

2 Presentation outline TRPC Smart Corridors project overview
DTA model development using DYNAMEQ TRPC Modeling set up and vision I-5/US 101 Interchange Feasibility Study Where do we go from here?

3 Geography THURSTON COUNTY SMART CORRIDORS

4 SMART CORRIDORS PROJECT OVERVIEW
To improve multimodal traffic operations on the corridors. Analyze operational needs Evaluate alternatives such as signal coordination and transit signal priority Investment strategy So, what tool do we use? Traffic operations at a regional scale DTA MODEL

5 DYNAMEQ DTA model development
Import regional model from EMME Network refinements: Intersection controls and geometry Signal timing data for about 80 signalized intersections Centroid loading points OD Trip Matrices: SOV, HOV, Trucks PM Peak 1-hour trip tables from EMME 30-minute shoulders Calibration/Validation: Link counts and Intersection turning movement counts Travel time and speed data Lane queues

6 Simulation results OUTFLOW DENSITY

7 TRPC Models set up and vision
EMME MODEL DYNAMEQ MODEL 4-step model Long range planning Land use and policy evaluation Smart Corridors Corridor study Traffic operations ITS evaluation Air Quality Subarea model Licensing issue Core urban area

8 I-5/US 101 Interchange Feasibility Study
Key system Interchange Safety and mobility issues To identify existing and future needs Analyze a range feasible alternatives - Capital improvements Ramp metering Shoulder running

9 I-5/US 101 STUDY NETWORK REFINEMENTS
Subarea Model Smart Corridors Model

10 Dta assignment Trip Tables Convergence Modes: SOV, HOV, Trucks
PM Peak Period - 2 hours PM peak hour demand from EMME model 30 minute shoulders Peaking factors Convergence

11 ALTERNATIVES ANALYSIS
BRAIDED RAMPS

12 RESULTS – MANDATORY LANE CHANGE

13 RESULTS – QUEUE LENGTHS

14 RESULTS – NODE DELAYS

15 RESULTS - DENSITY

16 CONCLUSIONS AND NEXT STEPS
DTA model and Planning for Operations DYNAMEQ and opportunity for the jurisdictions to integrate signal coordination efforts Data needs Subarea – can we fill the donut hole back? Best practices to coordinate EMME/DYNAMEQ model developments

17 THANK YOU Contact – Bharath Paladugu 360.741.2510 paladugub@trpc.org