Disclaimer: This is for informational purposes only, the Board is not advocating any particular position Forming an LID Cost Estimate of the LID Additional.

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Land Use Program Septic System Overview Scott Weldon
How to Buy a Home An Easy Guide for What to Expect When Buying your Home Presented by your friends and neighbors at ihousesandiego.comihousesandiego.com.
FHA 203K Streamline. Why FHA 203K Streamline? Through the FHA 203K Streamline program, borrowers can purchase or refinance their home and include the.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Grinder pumps are selected, instead of gravity sewers, when you need more freedom to run sewer up hills, through isolated flat lands, or in areas with.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Board of County Commissioners Allen County, Ohio Tuesday, May 1 st, 2001 Presented By: Stephen M. Kayatin, Sanitary Engineer Ryan Rase, Business Manager.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
The City of North Bend Sanitary Sewer System
Utility Extension Project
Careers in Construction Unit 1. Construction Industry One of the largest industries in America Divided into four major divisions –Residential Light construction.
2014 Budget Department Presentations Infrastructure Funding Options.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Brockton Redevelopment Authority The BRA is a quasi-public agency contracted by the City of Brockton that is tasked with community development and economic.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
Secretary Kenneth C. Holt Maryland Department of Housing and Community Development WholeHome September 30, 2015 Secretary Kenneth C. Holt Deputy Secretary.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Southwood Waterline Project Shawnee Twp. House 7:30 PM November 29 th 2000.
Potential Sources of Financial Assistance to Connect to the New Sewer PRESENTED BY SHERYL FLORES AND ALMA AGUILAR 11/5/2015.
PA-1 Surface Water Control Structure Replacement Final Payment.
Smoke Testing Information
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Grand Firs HOA 2014 Septic Reserve Funds Proposal.
SW Neighborhoods, Inc. Empowering Citizens since 1978 Halo LID Project HALO LID Project.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Park Hill School District August 9, Tax Rate.
S Bachmann Springs Phase One Subdivision Abandonment Request.
Hurricane Ike Recovery Projects CDBG Funding Galveston City Council Workshop  Sept. 17, 2015.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
City of Franklin Department of Building and Neighborhood Services Transitioning from Private Sewage Disposal to Public Sanitary Sewer September 30, 2010.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Grassland/Meadowgreen Sewer Project Assessment and Non-Payment Policy and Procedure.
Resolution No WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE Contract Cost: $2,969, Contract.
February 21, General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Septic System Overview
Middlebelt Transport and Storage Tunnel (MTST) Project
Profile of Little Pond Sewer Service Area
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Agenda 2015 Installers Meeting
107th & 110th Avenue North Public Utilities Renewal Projects
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Springbrook Estates Sewer Improvement Area Informational Meeting
Private Septic Systems
Completing the State Aid Payment Request
Private Septic Systems
On-Site Wastewater Treatment Systems
Sewer Infrastructure Watuppa Plantations Development
McGuffey Park Homeowners Association Meeting October 14, :00pm
Housing Rehabilitation Program
Biltmore C Proposed Water & Sewer Improvement Project
City of Smithville Tax Rate Public Hearing and Budget Workshop #2
Presentation transcript:

Disclaimer: This is for informational purposes only, the Board is not advocating any particular position Forming an LID Cost Estimate of the LID Additional Homeowner Responsibility Timeline

Taking the first steps right now, talk with neighbors A number of informal meetings would be held to gauge interest and need for an LID A petition would be circulated. A minimum of 51% of homeowners would need to sign (more is better)

The petition is returned to the Public Works Division, and an estimate of the projects cost is made The LID goes before the city council for approval Once approved, the project is designed and goes out for bid Once a successful bid is received, construction begins

When construction is completed, homeowners will be notified of the final assessment A hearing will be held before the city council, and homeowners can voice their concerns about the assessment at that time After the city council affirms the assessments, homeowners will be billed

There will be a 30 day prepayment period during which all or part of the assessment may be paid. The remaining unpaid amount will be divided into annual payments over 10 or 15 years plus interest

The board has sought a preliminary estimate from the city public works department $788,484 total cost divided among 86 homes $9169 per home Only includes the cost of running sewer pipe along the streets and a stub to each property

Why does this cost so much? The lines have to be run fairly deep because of homes with basements Avoid other utility lines Deeper lines requires a wider surface opening, which requires more street patching/curb repair Certain assumptions were made that could increase or decrease the cost The city also figures in a 10% contingency, which may also alter the final cost

The LID only covers the cost of running sewer lines along the streets Homeowners would need to contract with a plumber to: Connect the home to the city line Abandon the original septic system Pump tank and fill it with sand/dirt (in some cases, convert it to a pump tank)

Four basic quotes: No basement, approx 100 ft. $ $4400 Basement, convert septic into pump chamber install sewage pump (no electrical connection, will need an electrician for that) $4500 (an additional $900 to upgrade pump) Split level $4200 (basically the same setup as the basement with some shorter pipe and less excavation) Basement with gravity feed $ $10000 (may not be able to do it for every home with a basement)

Takes some time to get going. Informal meetings Petition circulation Approval by the city council If the LID were approved this year Spring 2012 to begin construction Approximately 90 days to complete once begun

Questions? Feedback Do we move forward? Are people interested in pursuing this further?