Sepsis and Defect Analysis Roger Resar, Senior Fellow, IHI Thursday, December 19 2013.

Slides:



Advertisements
Similar presentations
A Practical Guide to Prescribing on Day 1! Dr. Liz Gamble
Advertisements

The Tolerated Defects in Healthcare Introducing a new approach to safety in small rural hospitals Aug 22, 2012 Roger Resar MD Senior IHI Fellow 1.
We ACT Leadership Team Meeting Friday, February 7 th, 2014.
M & E for K to 12 BEP in Schools
Notes by Ben Boerkoel, Kent ISD, based on a training by Beth Steenwyk –
The New Surviving Sepsis Bundles: From Time Zero to Tomorrow
PBL Post-Project Review. 1. Student Engagement2. Project Idea3. Student Learning4. Authenticity of Project Tasks and Products5. Quality and Use of Driving.
How to design reliable processes in Healthcare Frank Federico Executive Director, Strategic Partners.
Compliance with Severe Sepsis Protocol: Impact on Patient Outcomes Lisa Hurst RN BSN CCRN and Kim Raines RN CCRN References The purpose of this study is.
Sepsis Protocol Go Live December 1, 2009 Hendricks Regional Health.
Severe Sepsis Initial recognition and resuscitation
GAPP Coaching Call Sepsis Working Session August 14, 2014 Jan Ratterree Lynne Hall Jean Allred.
In 2001, the European Society of Intensive Care Medicine (ESICM), Society of Critical Care Medicine (SCCM), and the International Sepsis Forum (ISF) developed.
Early Goal Therapy in Severe Sepsis & Septic Shock
MSC Confidential Take the Shock Out of Sepsis. MSC Confidential Why Use Simulation?
Reflective Practice Leadership Development Tool. Context recognised that a key differentiator between places where people wanted to work and places where.
By Saurabh Sardesai October 2014.
Creating Effective Facilitation Plans for Capacity Building CHA/CHIP Support Laurie Call 1.
Solutions for business and government through  Strategic Planning  Process Thinking  Leadership Development PO Box 2013, South Melbourne, Victoria,
Coaching Workshop.
+ Hybrid Roles in Your School If not now, then when?
Charting a course PROCESS.
Integrated PPM Governance Leveraging Org Change Management for PPM Process Implementations Presented by: Allan Mills.
Segmentation in Reliability Design (Application of the Christensen Model) Roger Resar April 2006.
Creating a service Idea. Creating a service Networking / consultation Identify the need Find funding Create a project plan Business Plan.
OSSE School Improvement Data Workshop Workshop #4 June 30, 2015 Office of the State Superintendent of Education.
Everyone Has A Role and Responsibility
District Workforce Module Preview This PowerPoint provides a sample of the District Workforce Module PowerPoint. The actual Overview PowerPoint is 62 slides.
AGENDA 09/09 & 09/10 F Nature of Strategic Challenge & F Strategic Management F The Strategy Concept and Process F Strategic Plan - Team Meetings.
Applying the Surviving Sepsis Campaign Guidelines to Clinical Practice
RIDEM Lean Initiative NEWMOA Lean Summit May 2014.
ACM SEP-1: E ARLY M ANAGEMENT B UNDLE, S EVERE S EPSIS /S EPTIC S HOCK Numerator-Patients who received ALL of the following: Within 3 hours of presentation.
Business Management. The Scope of Management What is management? What are the specific tasks and responsibilities of management?
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
The Tolerated Defects in Healthcare Introducing a new approach to safety in hospitals June, 2013 Roger Resar MD Senior IHI Fellow 1.
Reliability Theory Concepts: (How to be a Coach) Delivering Uniformly Excellent and Highly Reliable Interventions Across a Healthcare System Roger Resar.
How to design reliable processes in Healthcare Moving to 95% Roger Resar MD Hilton Head June 2012.
NATIONAL MENTAL HEALTH SERVICES COLLABORATIVE Report of Independent Evaluation Presentation – 7 th February 2012 NATIONAL MENTAL HEALTH SERVICES COLLABORATIVE.
CHAPTER 12 Descriptive, Program Evaluation, and Advanced Methods.
Learning Focused Observations BEST Leadership Roundtable February 1 st, 2012.
SUPERVISION: SIGNS OF SAFETY STYLE Phase 1 The Supervision Contract Phase 2 Case Specific Supervision Phase 3 Performance Booster Phase 4 Review of P.E.
Activity 5: Lead this Group! Instructions: There are many ways for a leader to respond to situations that have developed within a group. How would you.
National Sepsis Audit National Registrar Research Collaborative Audit Project 2013 Nationally led by SPARCS (Severn and Peninsula Audit and Research Collaborative.
Welcome to todays session!  Please take a moment to check your connection and audio settings.  If this is your first time using LYNC please see the resources.
Facilitate Group Learning
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
District Leadership Module Preview This PowerPoint provides a sample of the District Leadership Module PowerPoint. The actual Overview PowerPoint is 73.
The (Surviving) Sepsis Campaign at Cork University Hospital
United States Statistics on Sepsis
Driving to Results: Key Changes and Leadership Behaviors: Management Systems to Deploy & Sustain the Improvements David Munch M.D. IHI Faculty Chief Clinical.
Sepsis Care Bundle- Obstetrics Aneurin Bevan Health Board.
The ‘SEPSIS 6’ <insert date> Faculty: <insert faculty>
Bela Patel MD Associate Professor of Medicine UT Health Science Center Houston Memorial Hermann Hospital – Texas Medical Center.
Sepsis Are You Ready to Save a Life? By Tammy Henderson, RN, BSN Biola University 1.
SEVERE SEPSIS AND SEPTIC SHOCK
Code Sepsis: Current Evidence Based Guidelines and the CMS Sepsis Core Measure Adult Patients - Abbreviated Updated May 26, 2017.
Sepsis 101.
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Code Sepsis: Current Evidence Based Guidelines and the CMS Sepsis Core Measure Adult Patients - Abbreviated Updated August 30, 2017.
Sepsis Surgeon Champions Talking Points
Coaching.
Code Sepsis: Current Evidence Based Guidelines and the CMS Sepsis Core Measure Adult Patients - Abbreviated Updated August 30, 2017.
Learning Forward Annual Conference Session F28
M.A.T.C.H. Professional Series: Module 11
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Teams What is a team? Maintaining Focus
Mount Auburn Community Learning Session
Implementing the Child Outcomes Summary Process: Challenges, strategies, and benefits July, 2011 Welcome to a presentation on implementation issues.
Sepsis Core Measure August 25, 2015.
Implementing the Child Outcomes Summary Process: Challenges, strategies, and benefits July, 2011 Welcome to a presentation on implementation issues.
Presentation transcript:

Sepsis and Defect Analysis Roger Resar, Senior Fellow, IHI Thursday, December

Session Objectives Learn a methodology that surfaces and scopes improvements in a complex process design (sepsis) Learn how to engage both the leadership and frontline in a ground up improvement work Develop the skill to utilize minimal (data, persons, time and meetings) resources P2P2

Assumptions I have Made You have formed a team A protocol has been designed by the team for implementation of the bundle guidelines in the affected departments Some early testing has been started P3P3

Sepsis 3 Hour Bundle Measure Lactate level Obtain blood cultures prior to administration of antibiotics Administer broad-spectrum antibiotics Administer 30mL/Kg crystalloid for hypotension or lactate >4 P4P4

Sepsis Bundle 6 Hour Apply vasopressors (for hypotension that does not respond to initial fluid resuscitation) to maintain a mean arterial pressure (MAP)>65 mm Hg In the event of persistent arterial hypotension despite volume resuscitation (septic shock) or initial lactate> 4 mmol/L (36mg/dL): Measure central venous pressure Measure central venous oxygen saturation Remeasure lactate if initial lactate was elevated P5P5

Facts of Design Complex protocols require the design of multiple processes Processes need to be designed by the frontline that will be using the process or little chance of success let alone sustaining the process will be enjoyed Process design needs to have clearly articulated standard work (who, when, where, what, how and with what) P6P6

Team and the Dyad The team sets the overall goals and designs a protocol based on science (what we want to do and accomplish) The frontline designs the standard work of how are we going to actually accomplish this while still doing everything else they have to do It means rethinking the role of the frontline as a resource to actually do the design rather than a passive group that will bid the teams demands P7P7

Frontline Structured Conversation Frontline Structured Conversation Frontline Defects Clinical Non-clinical Collect Data Collect Data Suggest Strategies Suggest Strategies Identify Defects Identify Defects Frontline Engagement Small Tests Leading To Project Success Frontline Defect Driven Project Design

Surface Defects Surface Defects Scope Defects Validate Select specific work Design Strategy Finish Project Actions Design Benefits Timeline90 min2 Days1 day60 min 30 days Frontline Engagement Leadership Engagement Frontline Engagement Tester Engagement Frontline Engagement Design Basics of the Actions Conversation Specific Methodology Anchoring Questions Frontline Feedback Align work Gauge Capacity Articulate Implications Study the next defect Y/N Frontline Data Collection Determine frequency Define Boundaries Determine Simple measures Frontline Input Small Tests Frontline Defect Driven Project Design R ResarR Resar

The Conversation with the Frontline Organize the visit to the unit beforehand SPECIFIC DUTIES Select a mix of frontline staff (6-8) Select a small “leadership” team (From the Sepsis workgroup) Arrange for at 60 minutes of conversation Arrange for a location on the unit for the conversation

The Conversation with the Frontline STEP 1 DESIRED OUTCOME Cross-section of staff working on the unit Enough time for all staff to have an opportunity to talk A location where interruptions are minimized 11

The Conversation with the Frontline STEP 2 Have each of the participants describe how they see their role in the protocol SPECIFIC DUTIES Establish a non-threatening atmosphere Limit this part of the conversation to the first minutes Purpose of this portion is to understand the work and work environment

The Conversation with the Frontline STEP 2 DESIRED OUTCOME Trust from the frontline staff this is not about assessing personal work performance Participants who are willing to talk about the work, how they do it, and how they add value to the processes being designed 13

The Conversation with the Frontline STEP 3 Assess using “anchoring questions” SPECIFIC DUTIES Use questions like: How does our protocol fit your work day? Tell us about how it worked the last time? Were you happy about the results of using the protocol? Use these questions to learn about both clinical and non-clinical situations Center questions around identified defects where actual harm discussions are avoided but potential of harm is present Steer discussion away from solutions

The Conversation with the Frontline STEP 3 DESIRED OUTCOME Find a specific example of a defect around which you can anchor subsequent questions about frequency, type of patient involved, previous attempts to fix, or what might happen with your day if it were resolved Keep the discussion to a completely non-threatening, blame-free environment to allow for maximal information sharing Keep a simple record of the defects surfaced for further discussion at the team level 15

The Conversation with the Frontline STEP 4 DESIRED OUTCOME Generate a list of defects that the frontline has surfaced Achieve buy-in from the frontline for possible action Achieve buy-in from the questioning team as to the need for action 16

Surface Defects Surface Defects Scope Defects Validate Select specific work Design Strategy Finish Project Actions Design Benefits Timeline90 min2 Days1 day60 min 30 days Frontline Engagement Leadership Engagement Frontline Engagement Tester Engagement Frontline Engagement Design Basics of the Actions Conversation Specific Methodology Anchoring Questions Frontline Feedback Align work Gauge Capacity Articulate Implications Study the next defect Y/N Frontline Data Collection Determine frequency Define Boundaries Determine Simple measures Frontline Input Small Tests Frontline Defect Driven Project Design R ResarR Resar

Scoping the Projects Team needs to decide if this is within the abilities of a Dyad to solve Team needs to give specific direction to the Dyad in regards to methodology for design of that part of the process 18

Properly Scoped The Dyad will feel comfortable working on this particular defect in the design because the new design is integral with the current work they do The solution for the defect will easily be designed within a few weeks (max 30 days) Multiple designs for multiple defects can be taking place at the same time 19

Surface Defects Surface Defects Scope Defects Validate Select specific work Design Strategy Finish Project Actions Design Benefits Timeline90 min2 Days1 day60 min 30 days Frontline Engagement Leadership Engagement Frontline Engagement Tester Engagement Frontline Engagement Design Basics of the Actions Conversation Specific Methodology Anchoring Questions Frontline Feedback Align work Gauge Capacity Articulate Implications Study the next defect Y/N Frontline Data Collection Determine frequency Define Boundaries Determine Simple measures Frontline Input Small Tests Frontline Defect Driven Project Design R ResarR Resar

Advantages Projects are accomplished by a dyad No team meetings No training other than JIT No data collection other than pencil and paper Creates enthusiasm for improvement 21