FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.

Slides:



Advertisements
Similar presentations
Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
Advertisements

FP420 Low and high voltage supply Henning E. Larsen, INFN Dec rev.2.
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Controller Wiring.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Chapter 6 Voltage Regulators - Part 1-.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Power Supply Design J.SHANMUGAPRIYAN.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
CRYOGENICS AND POWERING
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
V.Shutov Dec.2014 Present Design Status Of Multichannel Power Supply For AHCAL SiPMs.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
The power supply system of the AMS experiment M. Menichelli, L. Accardo, G. Ambrosi, R. Battiston, M. Bizzarri, S. Blasko, D. Cosson, E. M. Fiori, O. Maris,
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
LHC Collimators low level control rack test experience in CNGS A Masi, LHC Collimators low level control rack test experience in CNGS LHC Collimators low.
FP420 Low and high voltage supply INFN/Univ. of Torino July A presentation intended to stimulate the discussion on which.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
What is the G.C.S 1. The Cummins Generator Drive Control System (GCS) is a computerized control system used to control a Full Authority Electronic (FAE)
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
1 Industrial Systems BUS2000 Busbar Differential Protection System Differential overcurrent system with percentage restraint protection.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 Radiation worries in the cavern L.Jirdén
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
FP420 Low and high voltage supply Henning E. Larsen, INFN Feb
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
PXD POWER SUPPLY DESIGN 1 5th International Workshop on DEPFET Detectors and Aplications J. Visniakov, P. Vázquez Universidad de Santiago de.
SMPS.
Rectifiers, Filters and Regulator
FP420 Low and High voltage supply
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE SP – Slow control Status
Chapter 27 Power Supplies.
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Ideas and design concepts, and challenges
Henning E. Larsen, INFN 12 July 2006
Irradiation test of Pressure Transducers for the LHC machine
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Presentation transcript:

FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006

Location If the LV electronics should stay within some 20m from the detectors, there are only two possible locations (ref Daniela Macina): –Below the new cryostat, where the radiation level is estimated at about 700 Gy per year of running at full luminosity; –Below or near the adjacent magnets, where the radiation is much lower and estimated at about 15 Gy per year, but where there are already other things.

Functions for a superlayer supply Each superlayer will be LV supplied by a separate unit=> isolation –own ac-ac power transformer secondary winding –own AC-DC rectifier bridge –isolated digital communcation interface Linear regulators for radiation hardness (LHC4913 STM tol 5kGy) (2.0V and 1.6V, 5W) Remote controlled fine adjustable offset and shutdown. Monitoring of the voltage, current and heatsink temperature

LV supply blockdiagram

LV Crate for 1 station, 8 superlayers

Alice DCS

Open issues Location of support electronics in tunnel Communication interface module in LV supply? Communication medium to slow control system: Fiber or cupper? …

LV Block diagram Located in shielded location some meters (3..20m) from frontend One module per plane for redundancy and noise reasons Remote monitor of V,I and T Remote control of deltaV and power ON/Off Local over-temperture protection

Critical issues for support electronics What is the infrastructure and environement in LHC: Location of support electronics in the tunnel Radiation levels at these location Suitable electronics to survive there Temperature range Data communication