Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.

Slides:



Advertisements
Similar presentations
1 | Energy Efficiency and Renewable Energyeere.energy.gov Alternative Finance & Mitigating Deferred Maintenance May 21, 2013 Kurmit Rockwell PE, CEM, LEED.
Advertisements

Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
M&V Decision Tool Sub-Committee Report Venkat Kumar Satish Kumar FEMP-ESCO Meeting 6 th June, 2002 Palm Springs, CA.
Briefing on Historic Performance, Mandates, and Outlook by the Federal Performance Contracting Coalition Energy Savings Performance Contracting.
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
FEMP Biomass Super ESPC Program Presentation to the Renewable Energy Working Group September 10, 2002 Christopher Abbuehl US DOE – PRO.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Genesis Solar Module Brochure ™
OSFMA Conference 2003 April 9, 2003 Are You Asking the Hard Questions about Performance Contracting? OSFMA Conference 2003.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Helping Massachusetts Municipalities Create a Greener Energy Future Energy Management Services Eileen McHugh Municipal Energy Coordinator
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Green Schools How to Save Money and Improve the Learning Environment Power Point at
FEMP Assistance Meeting Forest Service Needs Energy Savings Performance Contracting ESPC.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
1 | ESPC Technical Assistance Team eere.energy.gov Welcome to Today’s Training on Energy Savings Performance Contracting Basics Some Technical Tips Before.
Phoenix Convention Center Phoenix, Arizona Introduction to UESC Webinar Project Financing UESC Basics: Project Financing Through your Utility Julia Kelley.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
UESC Case Studies – PG&E
Phoenix Convention Center Phoenix, Arizona General Services Administration Areawide Contracts for Use With Regulated Utility Companies Institutional ChangeDoing.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Combined Heat and Power for Federal Facilities and the U.S. DOE CHP Technical Assistance Partnerships Track.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
ESPC ENABLE Program Overview
Phoenix Convention Center Phoenix, Arizona Supporting Today’s Energy Manager: Tools and Training from DOE FEMP Agency Energy Manager Energy Manager Skill.
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Overview of US Army Corps of Engineers (USACE) ESPC & UESC Programs
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Phoenix Convention Center Phoenix, Arizona Art and Science of Energy Management Agency Energy Manager The Art and Science of Energy Management Butch Wallace.
Phoenix Convention Center Phoenix, Arizona FEMP’s New ESCO Selector Tool Project Financing Tools for a Successful Project Scott Wolf Oak Ridge National.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Phoenix Convention Center Phoenix, Arizona GSA’s Actions under the PPCC GSA’s Pipeline Session 1, Track 5Meeting the PPCC Sharon Conger Public Building.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Phoenix Convention Center Phoenix, Arizona Retained Energy Savings: A Success Story Track 1 Retained Energy Savings: Putting It into Practice Don JUHASZ,
Financial ESPC Training Work Session. Proprietary Information Of Energy 2013 Assistance from DOE National Laboratories FEMP works with DOE National Laboratories.
Phoenix Convention Center Phoenix, Arizona Building Performance Using DOE’s Energy Modeling Tools For Retrofit Planning Using DOE’s Energy Modeling Ecosystem.
2 Breakout Session # 506 Daryl Berg, DOE Contacting Officer Julia Trautman, DOE Contract Specialist Date April 15, 2008 Time3:20 – 4:20 p.m. Energy Savings.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Phoenix Convention Center Phoenix, Arizona Michael Bartlett, PMP, CEM, CBEP, LEED AP ABM Government Services, LLC August 13, 2015 Solutions Showcase –
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Phoenix Convention Center Phoenix, Arizona Energy Service Provider Perspective Agency Energy Manager Track Building Teams and Procuring Services Kevin.
Douglas County School District Energy Services Performance Contracting.
Phoenix Convention Center Phoenix, Arizona HVAC Technologies Track 3: Energy Technologies August 12, 2015.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Army Policy Guidance for Utility Energy Services Contracts Randy Smidt, Headquarters Dept of Army, Office of the Assistant Chief of Staff for Installation.
Overview Federal Project Financing Vehicles by David McAndrew Federal Energy Management Program.
FPL Energy Services - ESCO Rob Risley Sales Manager October 13, 2015 Proprietary & Confidential Information.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Energy Savings Performance Contracts & Energy Service Companies
Guaranteed Energy Savings Performance Contracting
Are You Asking the Hard Questions about Performance Contracting?
Definition of ESPC ESPC is a no-upfront-cost contracting method. The contractor incurs the cost of implementing energy conservation measures (ECM) and.
Delivering Efficiency with Performance Contracting
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project Executive Oak Ridge National Laboratory [August XX, 2015]

Energy Exchange : Federal Sustainability for the Next Decade ESPC is a no-upfront-capital-cost contracting method. The contractor incurs the cost of implementing energy conservation measures (ECM) and is paid from the energy, water, wastewater and operations savings resulting from these ECMs. 2 Definition of ESPC

Energy Exchange : Federal Sustainability for the Next Decade Meet energy reduction and environmental goals –Affirm agency commitment to these goals 2-in-1 performance contract with guarantees Improve facilities: comfort and reliability Provide critical facility data Better quality Interoperability Good for community relations Avoid cost of delay and inaction Fast construction Avoid deferred maintenance 3 Why do an ESPC?

Energy Exchange : Federal Sustainability for the Next Decade ESCO has incentive to find all ECMs ESCO has incentive to do all punch list items timely ESCO has incentive to commission well 4 More on: Why do an ESPC?

Energy Exchange : Federal Sustainability for the Next Decade 25 year maximum task order term Annual cost savings must exceed payments Annual measurement and verification (M&V) of savings is required Performance guaranteed ESCO is responsible for O&M – agency may perform O&M (negotiable) 5 ESPC Features

Energy Exchange : Federal Sustainability for the Next Decade 6 ESPC Nuts & Bolts

Energy Exchange : Federal Sustainability for the Next Decade Reallocation means: 7 Reallocate the Government’s Utility Bill Stop paying for waste and pollution Start paying for efficiency!

Energy Exchange : Federal Sustainability for the Next Decade 8 Initial Proposal Estimated Savings Estimated Energy Costs Others assumed constant (not affected by ESPC project) Initial Proposal Estimates ESCO Services Debt service System 1 System 2 System 3 System 4 Plug Process & other Baseline System 1 System 2 System 3 Only a subset of energy- related systems can be retrofitted and be paid for by savings. Other energy use is ignored — but it all can vary with weather, usage, etc. Savings

Energy Exchange : Federal Sustainability for the Next Decade Two types of savings may be used to pay the ESCO 1. Energy cost savings 2. Energy-related cost savings 9 Savings Must Exceed Payments

Energy Exchange : Federal Sustainability for the Next Decade ► Pick Energy Services Co ► Preliminary Assessment ► Investment Grade Audit ► Task Order Award 10 Typical Major ESPC steps ► Final Design ► Installation ► Acceptance ► Annual M&V* *DOE now provides life-of-contract support

Energy Exchange : Federal Sustainability for the Next Decade 197% contract savings static baseline savings beyond term underestimate of equipment performance underestimate of utility escalation Oak Ridge National Laboratory study 11 Beyond contracted for savings

Energy Exchange : Federal Sustainability for the Next Decade ESPC savings achievement: 100+% Appropriated savings achievement: 67% From CTS and M&V data, Lawrence Berkley National Laboratory Study 12 Beyond contracted-for savings (cont’d)

13 Measurement & Verification Core to the success of ESPC

Energy Exchange : Federal Sustainability for the Next Decade 14 ESPC Training

Energy Exchange : Federal Sustainability for the Next Decade ENABLE is a new ESPC program For small Federal facilities Standardized, streamlined process using GSA Schedule ECMs: lighting, water, basic HVAC controls, HVAC equipment replacement and solar PV 15 ESPC ENABLE Overview

Energy Exchange : Federal Sustainability for the Next Decade 16 Tom Hattery Federal Project Executive Oak Ridge National Laboratory U.S. Department of Energy Federal Energy Management Program