M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

Optical Manufacturing Solutions 1 Probe Assembly.
Lucas Air Mass Meter Stripdown sequence and technical information.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
The Larsen Auto Blocker Calibrating Your System for Maximum Productivity and Quality.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Chapter 27: Workholding Devices for Machine Tools
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
SQXF Shell & Yoke Assembly Procedure
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
The Larsen Autoblocker Calibrating Your System for Maximum Productivity and Quality.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
Lab 3 - Centering.
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
Ladder Assembly All tools and jigs produced Glue dispensing works
Sector 002 Assembly status report
Hybrid Issues.
Ladder Assembly All tools and jigs produced Glue dispensing works
nSW Alignment Installation
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
Geometric Dimensioning and Tolerancing
Gattini Detector Installation
Pixel module assembly tooling
Presentation transcript:

M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000

M. Gilchriese 2 Overview Tooling with common features for mounting hybrids to bare modules and for mounting assembled modules to disk sectors. Hybrids to bare modules - Modules to sectors - Assembly sequence, concept drawings and detailed drawings are or will be at these URLs and will be updated. Some of the tooling exists already. Expect to have all prototype tooling for both hybrid->module and module- >sector by mid-May. There will be two sets of each and a spare of each. Will give brief introduction here but suggest small party go to Fred’s lab and discuss in detail. Reminder that this is prototype tooling and procedures to be used to really understand how this will be done in production.

M. Gilchriese 3 Hybrid to Bare Module Removable top plate with guides. Adjustment adapter for holding flex vacuum chuck. Flex vacuum chuck. Flex hybrid Bare module Vacuum chuck for bare module Air jacks for applying load Baseplate and guide rods Entire assembly is sized to fit in optical CMM (SmartScope) or using other microscopy (not shown) to check alignment

M. Gilchriese 4 Possible Assembly Sequence Remove complete hybrid from storage box and place on bare module vacuum chuck, position to module reference edges with spacers and apply vacuum, remove spacers. Place upper plate with hybrid vacuum chuck attached on lower plate assembly. This will place hybrid vacuum chuck a few hundred microns above hybrid. Apply air to jacks to lift hybrid to it's chuck, apply vacuum to hybrid chuck and remove vacuum from module chuck then remove air from jacks. With vacuum on hybrid chuck remove upper plate assembly. Place module on module chuck and position to reference edges and apply vacuum. Place upper plate with hybrid back on assembly and apply air to jacks. Inspect alignment with microscope, remove air and move hybrid with adjusters as needed. Remove air from jacks and remove upper plate with vacuum connected to glue machine and apply glue. Replace upper plate on assembly and recheck alignment before applying air to jacks to bring hybrid with glue in contact with bare module. Cure and recheck alignment.

M. Gilchriese 5 Module to Sector Removable top plate with guides. Adjustment adapter for vacuum chuck holding assembled module Disk sector. Disk sector baseplate(two types - 9 and 11 sector disks) Air jacks for applying load Baseplate and guide rods

M. Gilchriese 6 Stencil on CGL7018 Stencils for each module location referenced to sector by precision pins.

M. Gilchriese 7 Example of Application to Sector

M. Gilchriese 8 Mount Assembled Module Adjustment adapter holding vacuum chuck that holds assembled module. Precision alignment done using optical CMM before applying pressure to jacks to bring sector in contact with module.

M. Gilchriese 9 Possible Assembly Sequence Use fixture, lower plate with sector support Level sector support with air cylinder jacking screws Install sector on support Select and install CGL mask Screen on CGL and remove mask Pickup module assembly with vacuum chuck and connect to upper plate Place upper plate on lower plate assembly Vertical stops will hold detector 200 microns above CGL Place complete assembly in SmartScope Align datum with sector fiducials Adjust back-of-sensor fiducial position as needed with vacuum chuck plate adjusters Apply air to jacks to move sector up to module with known pressure. Re-check detector fiducial positions With pressure on, apply UV-epoxy and cure Remove vacuum from module chuck Remove air pressure from jacks Rotate sector support plate to next position and repeat

M. Gilchriese 10 Module Removal Tests have started to understand module removal, a hard requirement. Need much more experience, but conclusion so far is that it will be possible to remove modules(including with UV tacks), wash off CGL and reapply and reattach module. But we need to test this multiple times.

M. Gilchriese 11 Critical Issues There are many outstanding issues but most of them can only be addressed by practice assembly. Hybrid to module critical issues –Hybrid is NOT removable from bare module under current production plan. –Room temperature cure(although probably could get around this) –Flex hybrid needs enough open area and sufficient flatness to pick up with vacuum chuck. Not yet demonstrated this is possible with thin substrates. Module to sector critical issues –General issue of module attachment that will be discussed during meeting. –So far CGL7018 seems to satisfy requirements for disk sectors but CGL7018 requires(always the plan) additional hard support of module to sector - UV tacks otherwise it creeps easily(see next page). –In-situ pigtail connection and strain relief.

M. Gilchriese 12

M. Gilchriese 13 Plan Complete tooling by mid-May. Glue robot(also used for SCT module assembly) to be ordered by end April. This will give more flexibility in glue pattern application, perhaps. Use tooling and procedures for applying heaters and any dummy silicon or modules to all new sectors. Will make separate chuck for apply heaters and anything else. If material other than CGL7018+UV tacks is found to be useful to explore, could try it also as long as it can be applied by stencil or perhaps by dispensing. Practice, practice practice