Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
Walls crates cables gas chambers electronics CERN adb.
Algebra Foundations Box Factoring or acb Method x 2 - 4x + 4 x2x2 4.
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Инвестиционный паспорт Муниципального образования «Целинский район»
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Do you have the right phone model and number? Were you able to unbox, assemble and connect the phone? Has your phone registered to the VOIP system? What.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Multiplying Terms Algebra, second instalment. Menu… Multiplying terms with different letters Powers and multiplying Mixed signs.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
TC meeting P2 planning wks 3&4 A.Tauro
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Test beam straw prototype production status
DCS: Temperature Probes
DCS: Temperature Probes
HPS Motherboard Electronic Design
Electronics for RPC Upscope
Pictures and comments from Vitali Smirnov August 2010
LST Module Installation
مفاهیم بهره وري.
HCAL HV splice box.
Testing of the EMCO Prototype Boards
Label Name Label Name Label Name Label Name Label Name Label Name
Presentation transcript:

Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit or ?  When we will put labels and stickers (before or after cables in place?)  Who, where will cut and put connectors on cables ? PS: HV (28x4x2), LV (100x2), Temp (32x2), LV in (200x2) SPD : HV (28x4x2), LV (32x2), LV in (100x2)  before or after cables in place (or mixed …)  When we will put labels and stickers (before or after cables in place?)  Cables between boxes will be put at the end (with electronics) ?  How to maintain in place cables during installation:  up to electronics installation,  after …  How to check cable connections (connector and electronics levels) ?