Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.

Slides:



Advertisements
Similar presentations
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Environmental Assessment Public Meeting
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Cathedral Area Historic District Project Breaking A 50-Year Impasse:
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
From Island Estates Parkway to St. Johns County Line.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Rte 11, Canton Village PIN Village Board Meeting October 29 th, 2007 Project Information.
Phase 2: 30% Design Plans September 4 th, 2012.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Outline  Board Direction  Tasks Completed  Recommendation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
At-Grade Intersection Design
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
City of Charlottesville
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
Santa Cruz avenue sidewalks Project
DICKINSON AVENUE RECONSTRUCTION
Public Information Meeting NW 100th Street Reconstruction Project
SE 12th Street Roadway Improvements February 8, 2005.
State Aid Standards Development
S.R. 26 Road Rehabilitation in Clinton County
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Presentation transcript:

Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation  Questions

Recommendation  Approve the plans as proposed based on the need to provide traffic calming and the consistency of the plans with the Corridor Design Manual and direct staff to continue with the design and permitting phase to be immediately followed by the bid phase.

Issues  91 st Street is a County Scenic Road  There is a documented history of speeding on the roadway and a history of complaints by residents  The County is required to bring the roadway up to current standards to the extent that it is economically and environmentally feasible where there are no conflicts with existing development

Project Background  Project limits are from SW 8 th Avenue to SR 26  Designated as a County Scenic Roadway in 1987  Speed limit reduced to 30 mph in 2002  Field meeting in 2005 with residents to discuss continued speeding problems  County approved gas tax bonds for resurfacing in 2005  Corridor Study conducted by Kimley-Horn and Associates during the Fall of 2007

Project Background

Corridor Study Recommendation  Construct a center island median approximately 1,100 feet south of Newberry Road  Construct a center island median approximately 200 feet north of SW 1st Place  Construct a chicane approximately 1,100 feet south of SW 1st Place

Public Involvement  Corridor Study Workshop – Sept 2007  Design Kick-off Meeting – July 2008  Public Meeting – 30% plans – Sept 2008  Citizen Advisory Committee – Oct 2008  Scenic Road Advisory Committee – Oct 2008  Resident Field Review – Oct 2008  Public Meeting – 60% plans – Nov 2008  Scenic Road Advisory Committee – Dec 2008

Corridor Study Workshop  Over 30 people in attendance  Presented results of traffic study  Discussed traffic calming options  Recommended resurface sidewalk  Participants broken into five groups

Workshop Results  Three groups recommended a combination of medians and chicanes  One group recommended a series of medians down the entire roadway  One group recommended doing nothing between SW 8 th Avenue and SR 26  Three groups recommended a roundabout at SW 8 th Avenue  All groups did not want a roundabout at SW 1 st Place

Design Kick-off Meeting  Over 30 people in attendance  Presented results of corridor study  Provided schedule for project completion  Citizens concerned about speeding, width of medians, impacts to trees, conflicts with driveways

Advisory Committee Meetings  Citizen’s Advisory Committee –Recommendations Use all native vegetation Present to Scenic Road Advisory Committee Bring the sidewalk to 8’ wide wherever feasible Present to Bicycle/Pedestrian Advisory Committee  Scenic Road Advisory Committee

Public Meeting – 60% Plans  Presented 60% plans to the public  Over 30 people in attendance  Provided scaled renderings of proposed traffic calming features  Residents concerned about pedestrian safety, speeding, impacts to trees, drainage, driveways, and emergency response

Existing Conditions  Scenic roadway w/residential character  2-Lane Major Collector Roadway  Lane widths between 10’ and 11’  Existing shoulder does not meet current standards  Severely deteriorated pavement condition

Proposed Modifications  Milling and resurfacing of existing pavement  10’ travel lanes  Correct deficiencies in sidewalk along west side  Curb and gutter to minimize tree impacts (east side)  2’ paved shoulder or curb and gutter on west side  Traffic calming features

SW 91st Street Design Typical Cross-section No curb

SW 91st Street Design Typical Cross-section Curb

Proposed Traffic Calming  Two (2) Center Island Medians: - Approximately 1,100 feet south of Newberry Road - Approximately 200 feet north of SW 1 st Place  One (1) Chicane: - Approximately 1,100 feet south of SW 1 st Place

Proposed Traffic Calming Cross-section – Median Island

Center Island Median Insert Picture

Existing Condition – Median

Proposed - Median

Chicane Insert Picture

Existing Condition - Chicane

Proposed - Chicane

Frequent Comments/Questions  Concern: Speed has been identified as a problem on this road. Widening travel lanes would increase speed. Public Works Response: We acknowledge that speeding is a problem, which is why we are proposing traffic calming. The lanes are not being widened with this project. The lanes are currently 10-11ft wide and the design proposes 10 ft lanes. Additionally, the data concerning a potential correlation between lane widths and rate of speed is inconclusive.

Frequent Comments/Questions  Concern: There have been historical flooding problems in this area. These problems should be addressed in this design as well. Public Works Response: We recognize that there are flooding problems in the area of 91 st Street. The flooding is not substantially attributable to the roadway. Solving these historic flooding issues is an expensive process and in a separate project from a roadway resurfacing project, like this one. A project that would solve those issues is better managed through the future stormwater management program that we are pursuing. The design plans on 91 st Street are not anticipated to exacerbate the flooding issues in this area. The final design plans for 91 st corridor will meet or exceed all stormwater requirements of the St. John’s River Water Management District (SJRWMD).

Frequent Comments/Questions  Concern: The proposed medians would push traffic closer to the sidewalk, decreasing safety for pedestrians. Public Works Response: The proposed modifications will not move cars closer to the sidewalk except in the locations of the medians. At these closest points, approximately 6 feet of space will be maintained between the edge of the travel lane and the sidewalk. Six feet of separation between vehicles and pedestrians/bicyclists is more than enough separation to address safety concerns. These areas will be also protected with curb and gutter to prevent vehicles from going off the road and into the pedestrian/bicyclist path. Vehicles will also be traveling at a lower rate of speed through these medians reducing the potential for pedestrian/bicyclist fatalities.

Frequent Comments/Questions  Concern: The modifications would result in the removal of scenic trees and foliage. Public Works Response: If the project proceeds as currently planned, we do not anticipate that any trees will be removed. It is proposed to place curbing on the entire east side of the road and on the west side in isolated areas to protect trees. Without this curbing a six feet wide unpaved shoulder would have to be provided. This shoulder would require regrading of the ditch and would definitely impact the trees. Additionally, the proposed modifications will allow for a reduction in the design speed which means fewer power poles will have to be relocated to meet clear zone requirements.

Frequent Comments/Questions  Concern: Is there sufficient right-of-way? Will the County be acquiring additional right-of-way for this project? Public Works Response: The county has sufficient right-of-way and will not be acquiring additional right-of-way for this project. The right-of-way on SW 91 st Street varies. The majority of the right-of-way is feet. The right-of-way narrows to about 66 feet in one area and widens to 100 feet in another area. This information was collected and confirmed from various recorded subdivision plats, deeds and a maintenance map that was filed in All proposed modifications are within the right-of-way.

Frequent Comments/Questions  Concern: The overhead utilities should be buried to let the tree canopy grow. GRU provided a cost estimate in 2007 to bury the lines at a cost of $118,000.  Public Works Response: The County does not own the utilities and cannot bury utility lines that it does not own. The County cannot require already existing lines (like the lines on 91 st Street) to be relocated below ground. The cost to place the utilities underground would have to be borne by the County. Staff has discussed with Gainesville Regional Utilities (GRU) the possibility of relocating below ground some of the utility lines along 91 st Street. GRU’s cost estimate only included the lines from SW 8 th Avenue to SW 1 st Place (1/2 the project length). It would cost considerably more to place the lines north of SW 1 st Place underground because these lines are newer and still have appreciable value.

Summary  Proposed plans provides a context sensitive design that addresses all issues related to scenic road, speeding and design standards  Proposed design will not exacerbate the historical flooding problems and will improve safety

Recommendation  Approve the plans as proposed based on the need to provide traffic calming and the consistency of the plans with the Corridor Design Manual and direct staff to continue with the design and permitting phase to be immediately followed by the bid phase.

Questions ?