Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
By Chris Ford and James Hughes ( ) ( )
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Rhode Island Society of Environmental Professionals in conjunction with the Rhode Island Department of Environmental Management Co-hosted by SAME’s Narragansett.
BoRit Superfund Site Timeline
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
1 Aggregate Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3,
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Presented by: Jonathan Silvester Oliver Kiernan. Maxey Flat Site Located in Fleming County, Kentucky Low level Nuclear Disposal Facility o Isolate waste.
DISTRIBUTED BY. A non-toxic, Planet Friendly solution for soil remediation  Proven effective in the field with documented test results Environmental.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Integrated Post-Las Conchas Monitoring Los.
PESTICIDE and HERBICIDE PRACTICES  Limit soil erosion by planting vegetation on bare areas and using mulch or matting for landscaped areas. CONCLUSION.
Wastewater and Floor Drain Sludge 6-1 (a) Wastewater From Vehicle Maintenance Facilities n Vehicle and Floor Washwater –Wastewater contains soaps, grease,
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
Sarney Farm, Dutchess County New York
Gwinnett County’s Post Development Stormwater Management Program
Rhode Island Department of Environmental Management
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
Regional Response Team /Northwest Area Committee (RRT/NWAC) Meeting Coeur d’Alene, ID.
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
Introduction to Construction General Permit Inspections.
PRESENTATION TO: Washington State Transit Insurance Pool ABOUT: Pollution Legal Liability Insurance (PLL) BY:Brian A. White ALLIANT.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
“Bring Your Courage” Headquarters U.S. Air Forces in Europe 1 USAFE CLEANUP PROGRAM UPDATE Mr. Willi Ningelgen HQ USAFE/A7CV.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Review of Work Plan for Leaded Gasoline Tank Bottom Disposal Pit Assessment and Interim Stabilization Measures Presented by The Great Plains/Rocky Mountain.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Oyster Restoration in the Lynnhaven River. Watershed A watershed is an area of land that drains to a common point. A watershed is an area of land that.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
September 18, 1998 State of Illinois Rules and Regulations Tiered Approach to Corrective Action (TACO) Presented by The Great Plains/Rocky Mountain Technical.
Today’s Topics Hartford Iron site assessment Cleanup to date Cleanup steps to come What can you do.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Wastewater Treatment. Municipal Systems … ~75% of Canadians are on these waste water systems Waste leaves your home  enters a service line  enters sewer.
Water Sources & Pollutants FS Unit 5 FCS-FS-5: Students will discuss why water and pH are important factors in food preparation and preservation. C. List.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
Lecture (9): Monitoring & sampling methods, maintenance ,
Storm Water Storage and Treatment
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Preparing a Site Conceptual Model
Presentation transcript:

Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities

Report Organization n 1. Introduction n 2. Current Conditions n 3. Facility Dismantling Procedures n 4. Assessment Locations n 5. Soil Boring and Monitoring Well Installation Procedures n 6. Soil and Stream Sediment Field Screening and Sample Collection and Handling Procedures n 7. Groundwater Monitoring Well Development and Sampling Procedures and Surface Water Sampling Procedures n 8. Determination of Remediation Objectives n 9. Soil Remediation Procedures n 10. Documentation and Reporting n 11. Selected References

Introduction n Area 1 is about 14 acres, 2 miles long, 60 feet wide n goal of process is to obtain a No Further Remediation (NFR) letter from IEPA n Area 1 is to be a bicycle trail –plan to remediate soil as necessary –and/or install an engineered barrier –groundwater remediation if necessary would occur while Area 1 is in use

Current Conditions n Area 1 includes –underground concrete and piping from several buildings that need to be removed –a septic tank and piping from office building to ditch on Eastern plant boundary n no recorded spills within Area 1 boundaries n groundwater less than 10 feet below surface, flow is 0.05 to 0.57 feet per year

Current Conditions n no SWMUs in Area 1 n storm water drainage is to the North and South Stormwater Ponds n Area 1 crosses 5 wetland areas

Preliminary soil assessment (Feb 2000) n 62 samples from 23 borings n Appendix B tables— organic chemicals –Tier I remediation objectives exceeded »benzene at 2 to 4 feet in two locations (BC-4 and BC-10) »benzo(a)pyrene at 0 to 2 feet in two locations (BC- 12 and BC-22) »benzo(a)fluoranthene and benzo(a)anthracene also at BC-12

Preliminary soil assessment (Feb 2000) n Appendix B tables— organic chemicals –benzo(a)pyrene at 0 to 2 feet in two locations (BC-12 and BC-22) »the detection limit for this chemical is greater than the calculated soil remediation objective by about 4 times. –There appear to be no Tier I remediation objectives for 1-methylnaphthalene, 2-methylnaphthalene and phenanthrene »will Tier II calculations be required by IEPA?

Preliminary soil assessment (Feb 2000) n Appendix B tables— inorganic chemicals –beryllium in 48 of 62 samples –arsenic in 61 of 62 samples »It appears that this is a natural occurrence of these metals. The average amounts are similar to reported values for Will county.

Environmental Audit (July 1990) Appendix H n 2 sampling locations overlap Area 1 (F3 and F4) n toluene, trichloroethylene, and “oil and grease” were detected

Facility Dismantling Procedures n fluids will be removed from pipes with vacuum trucks and burned for energy recovery n water in pipes or structures will be tested and released, treated or shipped offsite, as appropriate n a cross section of Area 1 will be trenched to search for unknown structures n geophysical surveying will be used to identify unknown structures

Future Assessment Plans n at least one soil sample from under each structure in Area, except lunch room and gate house n at least one soil sample for every 250 feet along length of Area 1 n up to 3 monitoring wells will be installed in Area 1 n upstream and downstream surface water and sediment will be sampled for each stream crossing Area 1

Remediation Objectives n If Tier I remediation objectives are exceeded, –soil or groundwater will be cleaned up –an engineered barrier will be used, or –a Tier 2 evaluation will be done.

Remediation procedures n Petroleum impacted soil will be removed immediately when found –stops ongoing migration of contaminants to surrounding soil and groundwater –sidewalls and bottom of excavation will be sampled and tested for remaining contamination

Documentation and Reporting n maps showing location of former piping and structures n summary of assessment and cleanup procedures n figures and tables showing sample locations, where soil was removed, screening and laboratory results n laboratory reports n description of procedures followed n summary of management and final disposal of contaminated soil