Presentation is loading. Please wait.

Presentation is loading. Please wait.

Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E.

Similar presentations


Presentation on theme: "Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E."— Presentation transcript:

1

2 Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E.

3 Prepared For: Alton Park Community Wide Brownfield Assessment Project: Phase I Environmental Site Assessments

4 Review of Historical Records Interviews with knowledgeable people Site Observations (ground surface and structures) Looks for Recognized Environmental Conditions (REC’s) Limited in Scope (ASTM E1527-05) A Phase I ESA Is:

5 Provides the “innocent landowner” defense from CERCLA liability to purchasers who perform “All Appropriate Inquiry” A Phase I ESA:

6 Intrusive investigation (borings) Collection or analysis of samples Evaluation for asbestos, LBP, wetlands, or other non-ASTM issues A Phase I ESA Is NOT:

7 The presence or likely presence of any hazardous substance or petroleum product under conditions that indicate an existing release, a past release, or a material threat of a release. Does not include de minimis conditions that do not present a threat to human health or the environment. REC

8 1 2 3 8 4 5 6 7 Phase I ESA Locations

9 36 th Street Landfill Alton Park Junior High School / Franklin Middle School (Building Vacant) Alton Park South Side Health Department (Building Occupied) Area 1

10 Area 1 Photos Health Department Junior High School

11 Area 1 Map Central Avenue 38 th Street McCallie Homes

12 Area 1 Map Area 1 REC’s 36th Street Landfill Southern Wood Piedmont Chattanooga Creek Floodplain Concrete Containment Pads 36th Street Landfill Southern Wood Piedmont Chattanooga Creek Floodplain Concrete Containment Pads

13 Area 1 RECs 36 th Street Landfill Southern Wood Piedmont Chattanooga Creek Floodplain Concrete Containment Pads

14 36 th Street Landfill and Southern Wood Piedmont Southern Wood Piedmont 36 th Street Landfill 1 2 3 8 4 5 6 7 Southern Wood Piedmont Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill Potential Contamination from Flooding

15 Concrete Containment Pads

16 Other Development Considerations Potential Wetlands Floodplain and Floodway Foundation/Excavation Issues 1

17 Area 2 Vacant Parcels Between Bi-Lo and RR Historically Undeveloped Wooded and Steep to Low Lying Wet Area

18 Area 2 Map Tennessee Avenue BiLo Shopping Center 37 th Street Broad Street

19 Area 2 REC’s Historical and/or Illegal Disposal

20 Other Development Considerations Potential Wetlands

21 Area 3 Former Auto Repair Facility Former Dry Cleaner Abandoned Anchor Glass Office Building Currently Undeveloped Except Office Building

22 Area 3 Photos Vacant ParcelsPavedParking Lot Anchor Glass Office Building

23 Area 3 Map W 45th Street Central Avenue Anchor Glass

24 Area 3 Map Area 3 RECs Former Dry Cleaner Drums of Unknown Content Oil Stains Former Dry Cleaner Drums of Unknown Content Oil Stains

25 Area 3 REC’s Former Dry Cleaner Drums of Unknown Content Oil Stains

26 Sanborn Map Showing Drycleaner (1955) Former Dry Cleaner

27 Area 3 Drums and Oil Stains

28 Area 4 Alton Park Recreational Center Facility Currently Vacant Building and Playground Facilities Surrounding Industrial and Residential

29 Area 4 Photos Playground Building Ball Field

30 Area 4 Map W 45th Street Central Avenue Anchor Glass

31 Area 4 Map Area 4 REC’s No REC’s Identified Facility in anticipated upgradient direction of known contamination No REC’s Identified Facility in anticipated upgradient direction of known contamination

32 Area 4 REC’s No REC’s Identified Facility in anticipated upgradient direction of known contamination

33 Area 5 Former Frank H. Trotter Elementary School Property Currently Undeveloped Surrounding Industrial and Residential

34 Area 5 Photos Looking West Looking East Towards Central Avenue

35 Area 5 Map Central Avenue Velsicol W 45 th Street

36 Area 5 Map Area 5 REC’s No REC’s Identified Facility in upgradient direction of known contamination No REC’s Identified Facility in upgradient direction of known contamination

37 Area 5 REC’s No REC’s Identified Facility in upgradient direction of known contamination

38 Area 6 Recreational Facility Ball Field Basketball Court Storage Building

39 Area 6 Photos Ball Field Pavilion and Storage Shed

40 Area 6 Map 62 nd Street Wilson Road Central Avenue Velsicol Polk Avenue

41 Area 6 Map Area 6 REC’s Spring on property with documented contamination from Residue Hill Landfill Ground water monitoring well on property to monitor contamination from Residue Hill Landfill Flood Plain of Chattanooga Creek Spring on property with documented contamination from Residue Hill Landfill Ground water monitoring well on property to monitor contamination from Residue Hill Landfill Flood Plain of Chattanooga Creek

42 Area 6 REC’s Spring on property with documented contamination from Residue Hill Landfill Ground water monitoring well on property to monitor contamination from Residue Hill Landfill Flood Plain of Chattanooga Creek

43 Monitoring Well

44 1 2 3 8 4 5 6 7 Flood Plain of Chattanooga Creek Southern Wood Piedmont Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill

45 Flood Plain of Chattanooga Creek 1 2 3 4 5 6 7 8 Southern Wood Piedmont Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill

46 Other Development Considerations Potential Wetlands 100 Year Flood Plain 3 4 5 6 7 Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill

47 Area 7 Piney Woods Elementary School Vacant Building Play Ground Wooded Area

48 Area 7 Photos Front of SchoolBack of School Play Ground

49 Area 7 Map Wilson Road Hooker Road Workman Road

50 Area 7 Map Area 7 RECs Down Gradient of Residue Hill Landfill Flood Plain of Chattanooga Creek Down Gradient of Residue Hill Landfill Flood Plain of Chattanooga Creek

51 Area 7 REC’s Down Gradient of Residue Hill Landfill Flood Plain of Chattanooga Creek

52 Down Gradient of Residue Hill Landfill Residue Hill Landfill Ground Water Flow Direction Approximate Location of Monitoring Well

53 Down Gradient of Residue Hill Landfill Residue Hill Landfill Ground Water Flow Direction Approximate Location of Monitoring Well 1 2 3 8 4 5 6 7 Flood Plain of Chattanooga Creek Southern Wood Piedmont Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill

54 Flood Plain of Chattanooga Creek 1 2 3 4 5 6 7 8 Southern Wood Piedmont Morningside Chemicals Chattanooga Coke Velsicol Residue Hill Landfill

55 Other Development Considerations Potential Wetlands Floodway and Floodplain 3 4 5 6 7 Morningside Chemicals Velsicol Residue Hill Landfill Chattanooga Coke

56 Area 8 Former Auto Repair Facility Former Auto Salvage Yard Currently Vacant/Undeveloped Lot

57 Area 8 Photos Looking WestLooking Northeast Looking Southeast

58 Area 8 Map 38 th Street Alton Park Blvd. Ohls Avenue McCallie Homes

59 Area 8 Map Area 8 REC’s Former Auto Repair Facility/Salvage Yard Foundry Sand/Slag Former Auto Repair Facility/Salvage Yard Foundry Sand/Slag

60 Area 8 REC’s Former Auto Repair Facility Underground Storage Tank Present Foundry Sand/Slag

61 Former Auto Repair Facility/Salvage Yard

62 Foundry Sand/Slag Close Up of Slag Foundry Sand

63 Phase I ESA Summary Area 1RECs Area 2RECs Area 3RECs Area 4No RECs Area 5No RECs Area 6RECs Area 7RECs Area 8RECs 1 2 3 8 4 5 6 7

64 ? Questions ? Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo


Download ppt "Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E."

Similar presentations


Ads by Google