1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.

Slides:



Advertisements
Similar presentations
Minnesota Passenger Rail Presentation Transportation Finance Advisory Committee presented by: Mn/DOTs Passenger Rail Office May 18, 2012.
Advertisements

Cost-Effectiveness of Reductions in Greenhouse Gas Emissions from High- Speed Rail and Urban Transportation Projects in California Juan Matute and Mikhail.
Silicon Valley Leadership Group – Transportation Policy Committee (March 5, 2014) David B. Kutrosky, Managing Director Capitol Corridor (Sacramento-Oakland/San.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Analysis of Multi-Modal Strategies on Interregional Traffic in the I-580 Corridor in Northern California ITE Western District Annual Meeting June 25, 2012.
FirstClassPartnerships, Inc. (FCP), a well-respected leader in transportation planning, was contracted by the Ministry of Transportation.
OCBC Infrastructure Committee April 8, 2014 LOSSAN Rail Corridor Update Jennifer Bergener – Managing Director, LOSSAN JPA.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Elizabeth Sall Maren Outwater Cambridge Systematics,
CE 515 Railroad Engineering Passenger Rail-Intercity and Commuter Rail Source: AREMA Ch. 10, REES Module 5 “Transportation exists to conquer space and.
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE Dan Richard, Chair California Passenger Rail Summit April 29, 2015 Sacramento, CA.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE Michelle Boehm Southern California Regional Director April, 2015.
Service Integration: Service Integration for Our Grandkids Jim Allison Manager of Planning Capitol Corridor.
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
Urban Rapid Transit John Dulin Garrett Page Surbhi Kapoor.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
December 3,  Summarize how the bond act affects  The attributes of the high-speed rail system  The timing and sequence of construction.
Michelle Boehm Southern California Regional Director CMAA Southern California Chapter May 13, 2015 A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
California Integrated Logistics Center. A BART TRAIN FOR FREIGHT Moving freight through the Port of Oakland without increasing highway congestion Faster.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
1 CALIFORNIA HIGH-SPEED RAIL Silicon Valley Leadership Group February 5, 2014 eBay, San Jose P R E S E N T E D B Y Ben Tripousis Northern California Regional.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
Integrated Network Performance in Denmark INFORMS Annual Meeting 2014, San Francisco Dr. Steven Harrod Railway Network Design in Denmark.
Transportation 2030 Plan for the San Francisco Bay Area: Action Plan Update.
Trains are better for our environment than other modes of travel.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
1 Passenger Rail Solutions – Balanced Approach 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009 Joe Adams, Vice President – Public.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
California’s Intercity Passenger Rail Network National Model Highest Ridership of Any State VMT Reduction of 355 M Annually $175 M in Annual Wages $4 B.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
“An Iterative Capacity Constrained Parking Methodology for Ridership Forecasts for BART Extension Stations” Mike Aronson May 19, th TRB National.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Metropolitan Bakersfield High- Speed Rail Terminal Analysis and Evaluation A Presentation to the California High-Speed Rail Authority By the Kern Council.
Prop 1B: Infrastructure Bonds 2007 Bay Area Vendor Fair Oakland, CA May 24,2007 Bay Area Transportation:
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
1 Round One Public Outreach Workshops Fall 2005 Presented to: Women’s Transportation Seminar 2007 Annual Conference May 2, 2007 Presented by: Therese McMillan.
Plan Bay Area Presentation Plan Bay Area Presentation California Air Resources Board June 27, 2013.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
California Intercity Passenger Rail Service Governance: Local Authority American Public Transportation Association December 2, 2015.
Harnessing Clean: Sameer Ranade Washington Environmental Council/Alliance for Jobs and Clean Energy.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Linking Northern, Central and Southern California to the world and the nation.
Linking Northern, Central and Southern California to the world and the nation.
California Transportation Planning Conference Rail Modernization to Improve Mobility for California Moderator: Melissa Elefante DuMond, AICP Director of.
Preparing for an Increasingly Urbanized San Joaquin Valley
Lessons for the U.S. from High-Speed Rail’s Urban Impact in China
If You Build It, They Will Not Come
Chicago to Council Bluffs-Omaha
6/27/2018 Staff Presentation June 27, 2018.
AN INVESTMENT IN CALIFORNIA’S FUTURE
Presentation transcript:

1 High-Speed Rail Evaluation October 12, 2007 Planning Committee

2 High-Speed Rail Questions 1.Should the Bay Area support building a statewide high-speed rail system? 2.Which Bay Area high-speed rail alignment is preferred and why? 3.How can High-Speed Rail be phased in Northern California and the Bay Area?

3 Q1: Should the Bay Area support building a statewide high-speed rail system? YES Development of high-speed rail service could divert an estimated 32 million daily vehicle miles traveled statewide passenger trips thereby reducing freeway congestion and improving air quality HSR service could save an estimated 22 million barrels of oil and 18 tons of CO 2 annually by 2030 since trains are inherently more efficient than airplanes and autos The Bay Area can “piggy back” on high speed rail investments to accelerate development of the regional rail network in the Peninsula, East Bay, Tri Valley & Dumbarton corridors HSR stations can promote higher densities and more utilization of mass transit in existing urbanized areas in the Bay Area and Central Valley

4 Q2: Which Bay Area high-speed rail alignment is preferred and why? Both – Each Alternative Provides Different but Important Benefits The Pacheco route provides a superior high-speed statewide service to Fresno and points south including Southern California – more trips would be made between Northern California points and Southern California with a Pacheco Pass alignment The Altamont route better serves regional travel and provides better connections between the Bay Area and the Northern San Joaquin Valley – more trips between destinations located north of Fresno would be made on the high-speed network with an Altamont Pass alignment In the long term, a system with both links would serve the highest number of trips to Northern California destinations

Pacheco Option

6 Preferred Regional Rail Plan Pacheco Option

7 Why New Preferred Pacheco Alignment? Cost – $2 billion less Ridership – 10% higher Other Issues: –All trains go through three largest cities –Avoids UPRR ROW agreement in East Bay –Avoids ROW needs in I-880 corridor in South Bay –Avoids Capitol Corridor and BART service duplication

Altamont Option

9 Preferred Regional Rail Plan Altamont Option

10 Why New Preferred Altamont Alignment? Cost– Same Ridership – 13%-14% higher Other Issues: –Avoids service splits to three cities –Reduces UPRR ROW negotiations –Avoids duplication of service with Capitol Corridor and BART service –Avoids ROW needs in I-880 corridor in South Bay

11 Pacheco + Altamont Option

12

13 Pacheco vs. Altamont vs. Both

14 Q3: How can High-Speed Rail be phased in Northern California and the Bay Area? Phase 1 – Regional Improvements Caltrain intends to use lightweight electrified trains – investment in the Peninsula trackage with regional and high-speed rail funding can make this corridor “high-speed rail ready” Improvements to ACE and Capitol Corridor services would also occur in the same timeframe to better link Sacramento and the Central Valley to the Bay Area. Consider seeking additional HSR bond funds dedicated to upgrading Altamont corridor for regional service. Phase 2 - Linking The Bay Area and The Rest of California Making the link between Los Angeles San Francisco/San Jose with express trains through the Pacheco Pass would be the next step. Phase 3 & 4 - Ultimate Rail Vision The long term network will include both Altamont as well as Pacheco routes and a second Transbay Tube which will also add a new BART link connecting San Francisco to Oakland

15 Pacheco + Altamont Option

16 High-Speed Rail Bond Measure Current legislation provides for a $9.95 billion HSR bond measure to be placed on the November 2008 statewide ballot Bond measure in two parts: –$9 billion for building HSR between SF Transbay Transit Center and LA Union Station –$ 950 million for “supporting rail infrastructure” $760 million allocated by formula to commuter/urban rail $190 million allocated to intercity rail Bay Area’s share of the $760 million is $439 million allocated as follows: –ACE - $18 million –BART - $285 million –Caltrain - $46 million –Muni - $69 million –VTA - $ 21 million