Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

Fern Valley Interchange Public Hearing November 3, 2010.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Strategic Priorities Consultation Survey Overview Strategic Priorities Advisory Committee November 6, 2013.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
Michener’s Chesapeake Scenic Byway Corridor Management Plan.
Dudley Square Complete Streets Design Project Public Meeting #1 October 22, :00pm – 8:00pm Boys & Girls Club of Boston Yawkey Club of Roxbury.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Public Open House February 6, Study Overview - Study Area South North.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Odd Fellows Road Interchange and Roadway Improvements Citizen Information Meeting April 15, 2015.
INTRODUCTION An intersection is the general area where two or more highways join or cross, including the roadway and roadside facilities for traffic movements.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Traffic Flow Parameters Surface Street Application.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Morning Sessions 1 & 2 -- Detector Design and Timing Peter Koonce KITTELSON & ASSOCIATES, INC. Best Practices for Signal Operations.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
At-Grade Intersection Design
Chapter 6: Intersections
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Bicycle Safety Countermeasures Module 4.
ROUNDABOUTING WHAT YOU NEED TO KNOW
Nixon Road Corridor Study: Findings & Options
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Project Management Team Meeting #3
Waltham Road (Andover – North Star).
Public Information Meeting NW 100th Street Reconstruction Project
Double Crossover Diamond Interchange
Sarno Road Corridor Study
Neighborhood Traffic Management Program Greenbrook Drive South
Presentation transcript:

Route 55: Lauer Rd –TSP & Access Management

Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory Committee Report  Introduce Preliminary Design Alternatives  Question & Answer Period  Break Out Session  Report Back  Next Steps

Workshop Purpose  Report Back to Community on Public Workshop I & the Citizen Advisory Committee  Introduce the Preliminary Design Alternatives to Community  Gain community feedback

Introduction & Background  NYSDOT Project Objectives: Reduce Accidents Reduce Traffic Delays Support Future needs of the corridor and the community

Project Overview  Feb 2008 Initiated to address safety and operational concerns along the corridor  Oct 2010 Public Officials Meeting  February 2011 Public Workshop 1  April – July 2011 CAC meetings  August 2011 Public Workshop 2

Public Workshop 1

Summary of Things That Work  Access to TSP/Poughkeepsie  Current Assets/Setup  Access to Businesses  Small Town Feel  Existing Turn Lanes  Zoning  Town Maintenance

Summary of Needs  Improve Intersection Operations at Stringham Rd. & Arlington High School (AHS)  Address heavy traffic along Route 55  Improve safety for pedestrians and bicyclists  Improve right turn movement onto Freedom Rd.  Improve ability to make left turns throughout the corridor  Improve traffic flow and signal timing throughout Route 55 corridor  Improve access to the many driveways along Route 55  Improve access to Post Office  Improve operations at Mobil Station near Freedom Rd.  Add left turn access at Lexington Park exit  Improve vehicle & pedestrian access on Dr. Fink Rd.  Improve site distance at TSP ramps and Route 55  Address flooding problems along Route 55 near Kelly’s  Address inconsistent vehicle speed through corridor  Maintain consistency of roadway corridor along Route 55

Citizens Advisory Committee  Committee Make-up Represent different facets of community Community voice  Focus Community Priorities  Schedule Monthly Meetings

CAC Focus  Priority Needs Improve Intersection Operations Address Heavy Traffic on Route 55 Improve Business Access Improve Bike/Pedestrian Access and Safety

Conceptual Layouts

Concept 1

Concept 2

Concept 3

Concept 4

Concept 5

From Layout to Alternative

Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Standard Traffic Signal Protected Approach Designated Turn Lanes Flush Median Protected Pedestrian Standard Traffic Signal Protected Approach Designated Turn Lanes Flush Median Protected Pedestrian

Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Standard Traffic Signal Protected Approach Designated Turn Lanes Flush Median Protected Pedestrian Standard Traffic Signal Protected Approach Designated Turn Lanes Flush Median Protected Pedestrian

Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Modern Roundabout Yield Approach No Turn Lanes Raised Median Permitted Pedestrian Standard Traffic Signal Protected Movements Designated Turn Lanes WB Right Turn By-Pass Flush Median Standard Traffic Signal Protected Movements Designated Turn Lanes WB Right Turn By-Pass Flush Median

12-Way Dr. Fink Connection 2Access to Business 3Access to School 4Pedestrian Connection 5Right’s In / Out 12-Way Dr. Fink Connection 2Access to Business 3Access to School 4Pedestrian Connection 5Right’s In / Out

Comparison of Alternatives Weighting Criteria Signalized Alternative (w/ flush median & turn lanes) Roundabout Alternative (w/ Raised Median Section) SafetyHigh Speed on Green 28 conflict points Protected Pedestrian Phase Low Speed Operation 8 conflict points Yield Control AccessTurning Movement Friction No Left at Peak Hours Rights in / Rights out Utilize Roundabout To make left OperationRestricted Lefts Red pedestrian phase Raised Median Rights in / out EnvironmentMore Pavement More Signs / Stripes Less Pavement More Green Space Const. Cost4.8 M5.2 M

Safety Considerations 32 Vehicle to Vehicle Conflict Points 24 Ped. to Vehicle Conflict Points 8 Vehicle to Vehicle Conflict Points 8 Ped. to Vehicle Conflict Points

Q & A

Break Out Session  Choose a Recorder and a Reporter  Using the worksheets provided Discuss How Well The Alternatives Meet The Project Objectives and Community Needs.  Please write down your comments on the worksheet- Be specific. This is our record of what happened at this meeting.  In 30 minutes or so we’ll ask the reporter at each table to present TWO items that your group identified (positive/negative).

Next Steps  Review comments; additional meetings with the CAC; refine alternatives; use specific design criteria; design report etc.  Workshop III – Present Preferred Alternative Please Fill Out Your Surveys And Drop Them By The Door Before You Leave