Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview 15.02.2013 2  Good design.

Slides:



Advertisements
Similar presentations
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
André Augustinus 16 June 2003 DCS Workshop Safety.
27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Scenario for the gas system 1.High cost gas (5 €/l of Xe) 2.High hydrostatic pressure over 7 m height 3.Light and large detectors, no big under- or.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
AccuMax Multi-Point Injection Mechanics
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
A. Wasem / TA1-GSTRT Meeting 20/02/20021 Results from Prototype CO 2 Cooling Gas System.
Overview of the 1.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
Diagnostics – Quaternary Pump & Fraction Collector Analytical 920 LCSemi-Prep 940 LC.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
900-LC P. van Poppel – Field Support Specialist October 2009.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ADVANCE IN AUTOMOBILES HYDROGEN FUELLED ENGINES BY C.SUBRAMANIAN, 10MECH50, III-MECH, VCET,MADURAI.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Associated detection/extinction systems D. Swoboda.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
HMPID maintenance activities during LS1 during LS1 Cosimo Pastore HMPID PLENARY MEETING March 22th, 2013.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Proportional and Servo Valves
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
TRT (and a bit beyond) – Overview 1. TRT Desynchronization – [206248: 1 -> : 533), elogelog – ROD firmware issue Reverted to the before-the-TS settings.
Cascade Control Systems (串级控制系统)
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Fan Assembly Driven by Magnetic Fields
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Gas system Commissioning procedures and status
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
Pixel Cooling System Modifications
August 23, 2000 R.N. Dubois Dow Chemical
R. Messner May 2004 Readiness Review
Presentation transcript:

Active gas system status. S.Konovalov, K.Zhukov

Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design and high-quality assembling of the gas system.  Cooperation with the gas group.  Prevention (monitoring of the parameters, analysis of trends).  Spare parts days of Gas system operation StartStopMonths 12/09/20082/12/ /09/20097/12/ /02/20117/12/ /02/201214/02/201312,5 ≈40 Gas system was stopped. Datedays 27/08/2008Gas analyzer (CO 2 cell)2 18/12/2009Mixer rack (pressure gauge) /02/2010Profibus problems1-2 25/03- 8/04/2010 Membrane rack (first stage pump)13.5 (12+1.5) 29/11/2010Gas analyzer (CO 2 cell)0.5 7/09/2011Membrane rack (first stage pump)<1 18 Efficiency ≈ 98.5 %

S.Konovalov "Active gas system..."TRT Overview Plans Gas system upgrade. Some improvements for more safety, more reliability… Tests & regulations. Automatic operation of the gas system in auxiliary operational modes (Filling, Recuperation, CF 4 mixture, Ar mixture). Maintenance & reparations. First priority tasks for to address TRT leaks. TRT meeting Friday, 15 February 2013 “Gas system status”” conferenceDisplay. py?confId= List of priorities on the last slide

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks It is possible to stabilize leak in the most part of the leaking channels. For this it is needed to tune and keep with the big accuracy 2 parameters: gas flow in this channel and pressure in the TRT outlet (pump inlet pressure). leak OUT IN Pressur e OUT pressure is fixed. Input pressure is possible to change by changing of the gas flow. Leak in 1 place

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Gas flow regulation. Gas flow regulation in the existent gas manifolds is very rough. Design end production of the fine flow regulation valves is needed. Design of the new flow regulation valves is practically done. It is not needed to produce new distribution manifolds. old new

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Remote gas flow regulation. When leak opens it is developing during some time (sometimes a few hours, sometimes several days). Every time we need to adjust gas flow in the leaking channel we need to ask urgent access and spend 1-2 hours in the cavern. Design, some tests (including tests in the magnetic field) end production of the remote gas flow regulation is needed. This work is began (Sergei Katunin).

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Pump inlet pressure regulation. Requirement for the pressure regulation accuracy was ± 1 mbar. Real pressure regulation accuracy is even better ≈ 0.1 mbar. It is desirable to decrease fluctuations of the TRT out pressure even more in order to stabilize leak mbar Output pressure is oscillating.Input pressure is not constant. leak OUT IN Pressure

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Next steps: precise pressure sensor PID algorithm fine tuning pump input resistance regulation Replacement of the regulation valve. Before. Now. Regulation looks better. Pump input pressure fluctuations are at the same level ≈ 0.1 mbar. Valve opening position Valve opening set point

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Pump pressure was regulating relative to the pressure in USA15. Pressure in the cavern differs from the pressure in USA15. This difference is not constant. Sometimes ΔP≈0.2 mbar and even more. We have got differential pressure sensor. This gauge measures pressure difference between pump input and ID volume. It helps to stabilize TRT output pressure. More tests is needed with more precise pressure sensor in barrel distribution rack output. USA15 – UX15 PRESSURE DIFFERENCE FOR CIRCULATION PUMP OPERATION FEEDBACK UX15-YSA15 pressure difference 0.1 mbar

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Distribution Input pressure is not constant. It is proportional to the tank pressure. Problems with TRT leak forced us to change gas regulation algorithm. The original idea was to keep concentrations of the gas components with the best accuracy. Variation of the tank pressure could be quite big. New regulation algorithm is not perfect. Fine tuning is needed. It will require quite a long time. Gas regulation PID XeCO 2 O2O2 KpTiKpTiKpTi Minimum of the CO2 & O2 concentration fluctuations Before 20/08/2012 compromised. Better pressure regulation, concentration stabilities is still good From 21/08/2012 to 21/11/2012 Minimum of the tank pressure fluctuations From 21/11/2012

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Xe mixture supply blowing out. Where was a few leaking channels [B43; C1; C4, C6] in which it was not possible to provide detector performance with minimum gas losses working in the loop. They were supplied with the gas from the gas system blowing out. Temporary set-up was assembled in USA15 and distribution part in UX-15. It is needed to design and produce permanent Xe mixture supply with gas flow, pressure readout, implementation into gas control and DCS, alarms…(practically one more distribution rack + some equipment in USA-15). Barrel M1, M2 St 1 St 2 St 3 St 4 leak OUT IN Pressur e breaks No leak CO2 in leak CO2 in Leak in 2 or more places leak Brake-through compromise

S.Konovalov "Active gas system..."TRT Overview First priority tasks for to address TRT leaks Ar mixture supply blowing out. The decision to supply part of the TRT blocks with Ar based mixture could be taken. Gas system has to be ready for that. Temporary set-up was assembled. It consists of the mixer in SGX-1 and distribution part in UX-15. It is needed to design and produce permanent Ar mixture supply with gas flow, pressure readout, implementation into gas control and DCS, alarms…(practically another one distribution rack in the cavern + one more mixer in SGX-1). A R DISTRIBUTION A R MIXER

First priority tasks for to address TRT leaks Nitrogen removal/recuperation system. Envelop gas which comes to the gas system because if the leak consists some admixture of N 2. Membrane module is not able to remove this N 2. Some modifications in the recuperation system gave possibility to replace gas in the gas system and clean gas from N 2. This was 100% manual operation. Design and production of the nitrogen removal/recuperation system fully remote controlled is needed. S.Konovalov "Active gas system..."TRT Overview RUN ÷0.42% RUN %/day = 1 l/day N 2 concentration

First priority tasks for to address TRT leaks Nitrogen removal/recuperation system. Design and production of the nitrogen removal/recuperation system fully remote controlled is needed. S.Konovalov "Active gas system..."TRT Overview

First priority tasks for to address TRT leaks Nitrogen removal/recuperation system. S.Konovalov "Active gas system..."TRT Overview PRIORITIES.