Objectives: Upgrade Siebel to a supported application Upgrade to Oracle 9i database Deliver all existing user functionality with no degradation in performance.

Slides:



Advertisements
Similar presentations
Information Technology Update Aaron Smallwood Manager, IT Business & Customer Services.
Advertisements

Information Technology Report Dave Pagliai Manager, IT Support Services March 2015 ERCOT Public.
MarkeTrak Orientation July 30,  Antitrust Admonition  Introductions  MarkeTrak Flight Test Orientation  Why Do We Test?  Overview  API vs.
Gemini issues Ritchard Hewitt Gas Codes Development Manager.
Retail Sub-Committee Update Robert Connell June 14, 2002.
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
ERCOT Retail Market IT Update Aaron Smallwood Director, IT Operations Retail Market Subcommittee April 7 th, 2015.
RO Project Priority List Update EDW Projects Update RMS Meeting Adam Martinez Mgr, Market Ops Divisional Projects Organization ERCOT April 12, 2006.
MyFloridaMarketPlace CRB Meeting
RMS Update to TAC January 3, Goals Update ► Complete and improve SCR745, Retail Market Outage Evaluation & Resolution, implementation and reporting.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
RMS Update to TAC May 8, RMS Update to TAC ► At April 9 RMS Meeting:  Antitrust Training  RMS Voting Items: ► NPRR097Changes to Section 8 to Incorporate.
Data Extracts & Reporting Recent Issues ERCOT Information Technology Data Extracts Working Group 11/27/07.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
1 TDTWG Update to RMS Tuesday January 6, Primary Activities 1.Reviewed ERCOT System Outages and Failures 2.Presented Service Availability and.
1 Siebel 7 Upgrade Project PR40066_03. 2  Key Functional Areas… –Compliance –Legal –Lodestar –Market Participants –Network Modeling –Retail Client Services.
Enhancements to FasTrak PR Project Update Retail Market Subcommittee November 8, 2006 Adam Martinez Mgr, Market Operations DPO.
Nodal COMS Update Commercial Operations Subcommittee January 13, 2009 Clay Katskee ERCOT - Market Operations Division Projects Organization.
Update to RMS January 14, MarkeTrak – Release 3 Release 3 was successfully migrated the weekend of December 13 th Stabilization period – Dec 13.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2 TDTWG April 2, 2008.
TX SET January 21, 2009 Retail Release Items for February 21, 2009 Kathryn Thurman ERCOT.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
Market Coordination Team Update Retail Market Subcommittee November 8, 2006 Susan Munson Retail Market Liaison.
1 C urrent Market Release TX SET V2.0 / Solution to Stacking.
Retail Business Processes PR 50121_07 Project Update Retail Market Subcommittee September 13, 2006 Adam Martinez Mgr, Market Operations DPO.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
Texas SET Version 3.0 Production Implementation Plan.
Report to RMS January 14, TTPT Key Dates and Deadlines as of 1/14/03 1/05/04 - Mandatory Connectivity Kick Off Call & Penny Tests begin 1/12/03.
PR50121_07 Retail Business Processes (RBP) Project Update Retail Market Subcommittee November 8, 2006 Adam D. Martinez Mgr, Market Operations DPO.
Retail Transaction Processing Year End Review and Recent Issues RMS January 2007.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
Rob Connell May 29, 2002 Retail Sub-Committee Update.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
COPS – ERCOT PROJECTS UPDATE Retail & Services Platform Development Karen Farley March 22, 2005.
1 New RO Projects Hope Parrish June NEW RO Projects for 2008 Requested by ERCOT - Overview Objective Objective of the following information is to.
1 Market Data Transparency SCR 740 Business & Technical Training SCR 727 Phase II: Web Services ERCOT presents: Market Data Transparency.
Retail Market Subcommittee (RMS) Update Kathy Scott April 9, 2013Commercial Operations Subcommittee 1.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
June 2010 COPS/RMS Information Technology Report Trey Felton Manager, IT Administration.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
ERCOT Market Services Organization Dale Goodman Director, Market Services (office) (cell) (fax)
February 10, 2010 RMS ERCOT 1/24/10 Production Issue Overview and Lessons Learned Karen Farley Manager, Retail Customer Choice.
September 21, Data Extract Projects Jackie Ashbaugh Commercial Operations Data Integrity & Administration September 21, 2006.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
1 Market Operations Presentation Board of Director’s Meeting January 17, 2006.
Information Technology Service Availability Metrics March 2008.
September 22, 2008 TPTF Nodal Status Report: Project Status Updates Nodal Project Managers.
Market Coordination Team Update Retail Market Subcommittee April 11, 2007 Susan Munson Retail Market Liaison.
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
Information Technology Update Aaron Smallwood Manager, IT Business & Customer Services.
EIS Projects Update COPS Meeting Adam D. Martinez Mgr, Market Ops Divisional Projects Organization ERCOT April 28, 2006.
MARS Taskforce RMS Update April 12, Initial Settlement As of April 5, 2011 Operating Date: March 29, 2011 AMC ESI ID Totals: 2,601,788 AMDG ESI.
Objectives: Add remaining fields to the ESIID Look Up functions requested in PRR312. Scope/Why is this important?: Allow users to have improved access.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
August 17, 2006 Data Extract Working Group EDW Project Updates 2006 / 2007 MO & RO PPL.
3 rd Party Registration & Account Management SMT Update To AMWG May 24, 2016.
MODPO Project Update Overview of December Implementations & EDW Changes Commercial Operations Subcommittee December 11, 2006.
1 Market Trials Update NATF January 5, 2010.
Objectives: Improve site structure and navigation Identify & implement an ownership structure Implement a web content management system (Serena Software’s.
3 rd Party Registration & Account Management SMT Update To AMWG March 22, 2016.
Role of Account Management at ERCOT EIS Project Updates Jackie Ashbaugh Mgr., Commercial Operations Data Integrity & Administration DEWG October 19, 2006.
July 2008 RO Projects Financial Overview Retail Market Subcommittee August 13, 2008 Hope Parrish Market Operations Division Projects Organization.
August 9, 2006 Retail Market Subcommittee Meeting MarkeTrak Update.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
MTG CEMR/MEDIACC Repair System Improvements
Stacking Implementation Plan
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2
Presentation transcript:

Objectives: Upgrade Siebel to a supported application Upgrade to Oracle 9i database Deliver all existing user functionality with no degradation in performance Scope: Upgrade Siebel software v6.3 to v7.7 Upgrade Oracle database 8i to 9i Maintain all existing Siebel functionality from v6.3 Maintain all existing functionality to interfaces (L*, Reports/Extracts, ETS (internal)) Allow developers to more easily enhance system functionality going forward Deploy thin-client for external Settlement Disputes & Service Requests Dependencies: None Objectives: Upgrade Siebel to a supported application Upgrade to Oracle 9i database Deliver all existing user functionality with no degradation in performance Scope: Upgrade Siebel software v6.3 to v7.7 Upgrade Oracle database 8i to 9i Maintain all existing Siebel functionality from v6.3 Maintain all existing functionality to interfaces (L*, Reports/Extracts, ETS (internal)) Allow developers to more easily enhance system functionality going forward Deploy thin-client for external Settlement Disputes & Service Requests Dependencies: None Project Objectives / Scope / Dependencies PR-40066_03 Siebel 7 Upgrade

Phase: Initiation – Completed in Sept ‘04 Planning – Completed in January ‘05 Execution – In Progress – Scheduled Implementation April ‘05 Closing – Goal to complete early June ‘05 Recent: Completed testing in several lower environments Test Scripts and Final Design sign-off underway Minor cosmetic modifications remaining Next steps: Started our migration to iTest on February 17 ‘05 Prepare internal training materials for week of March 14 ’05 Complete Migration Plan including Contingency “Fall-back” Plan Phase: Initiation – Completed in Sept ‘04 Planning – Completed in January ‘05 Execution – In Progress – Scheduled Implementation April ‘05 Closing – Goal to complete early June ‘05 Recent: Completed testing in several lower environments Test Scripts and Final Design sign-off underway Minor cosmetic modifications remaining Next steps: Started our migration to iTest on February 17 ‘05 Prepare internal training materials for week of March 14 ’05 Complete Migration Plan including Contingency “Fall-back” Plan Summary of Project Status PR-40066_03 Siebel 7 Upgrade

Requirements (pens down) – Completed early January ‘05 Final Design (Internal document) – Completed mid February ’05 Build – Completed late February ‘05 Testing – Goal to complete mid April ‘05 Internal Training – Goal to complete mid March ’05 MP Training – Web Cast conducted for Settlement Disputes prior to Deployment Production (Go live) – April ‘05 Requirements (pens down) – Completed early January ‘05 Final Design (Internal document) – Completed mid February ’05 Build – Completed late February ‘05 Testing – Goal to complete mid April ‘05 Internal Training – Goal to complete mid March ’05 MP Training – Web Cast conducted for Settlement Disputes prior to Deployment Production (Go live) – April ‘05 High level timeline PR-40066_03 Siebel 7 Upgrade

Bus Lead: John Kassel ph: PPL: Source: ERCOT Priority: 1.1 Rank: 15 Program Area: RO What prompted the project: This project was a CASUP recommendation approved by ERCOT Executive committee and the ERCOT Board of Directors Vendor support expired for existing version of Siebel and Oracle in 2004 – cost to maintain becomes significant if major problems arise Siebel is the Registration system for all ERCOT’s Customers Current version has limited Portal interaction capabilities Bus Lead: John Kassel ph: PPL: Source: ERCOT Priority: 1.1 Rank: 15 Program Area: RO What prompted the project: This project was a CASUP recommendation approved by ERCOT Executive committee and the ERCOT Board of Directors Vendor support expired for existing version of Siebel and Oracle in 2004 – cost to maintain becomes significant if major problems arise Siebel is the Registration system for all ERCOT’s Customers Current version has limited Portal interaction capabilities Additional Information PR-40066_03 Siebel 7 Upgrade

NOT CHANGING Transaction management of ALL 814 and 867 transactions Current workflow of service orders and service instances Contact administration and relationship management Reports and Extracts CHANGING Service Requests functionality and screen design (Wholesale and Retail) Settlement Disputes functionality and screen design (Wholesale) NOT CHANGING Transaction management of ALL 814 and 867 transactions Current workflow of service orders and service instances Contact administration and relationship management Reports and Extracts CHANGING Service Requests functionality and screen design (Wholesale and Retail) Settlement Disputes functionality and screen design (Wholesale) External Functionality PR-40066_03 Siebel 7 Upgrade

At this time, ERCOT anticipates the outage timeframe below for the April Maintenance Retail Release The timeframe is subject to change and confirmation will be provided prior to the release Friday, April 15, 2005 through Sunday, April 17, During the outage: All transactions sent to ERCOT will be held at the Paperfree server during the outage 867 transactions WILL be forwarded during the outage NAESB EDM and ANSI responses WILL be sent during the outage (i.e. This includes 997 Functional Acknowledgements) USA functionality will not be available Retail components of the TML and API will NOT be available (i.e. This includes Find ESI, Find Transaction and Submit Transactions) Settlement Disputes and Service Requests will NOT be available At this time, ERCOT anticipates the outage timeframe below for the April Maintenance Retail Release The timeframe is subject to change and confirmation will be provided prior to the release Friday, April 15, 2005 through Sunday, April 17, During the outage: All transactions sent to ERCOT will be held at the Paperfree server during the outage 867 transactions WILL be forwarded during the outage NAESB EDM and ANSI responses WILL be sent during the outage (i.e. This includes 997 Functional Acknowledgements) USA functionality will not be available Retail components of the TML and API will NOT be available (i.e. This includes Find ESI, Find Transaction and Submit Transactions) Settlement Disputes and Service Requests will NOT be available ERCOT System Outage Overview PR-40066_03 Siebel 7 Upgrade Implementation Plan

The shutdown times listed will be strictly adhered to unless prior notice is given to all MPs All MPs should submit transactions well in advance of the shutdown time so that large transaction volumes are not experienced just prior to shutdown (i.e. if you run batch jobs, schedule them throughout the day)!!! All MPs will have the opportunity to call-in to each conference call during the implementation if they wish to hear a progress update All times listed are Central Prevailing Time The shutdown times listed will be strictly adhered to unless prior notice is given to all MPs All MPs should submit transactions well in advance of the shutdown time so that large transaction volumes are not experienced just prior to shutdown (i.e. if you run batch jobs, schedule them throughout the day)!!! All MPs will have the opportunity to call-in to each conference call during the implementation if they wish to hear a progress update All times listed are Central Prevailing Time Shutdown Procedure PR-40066_03 Siebel 7 Upgrade Implementation Plan

Friday, April 15 th (mid-day) ERCOT will… Keep up NAESB and Paperfree Shut down XML Mover (for 814 & 824 transactions) and 867 Upload Shut down TML component for Settlement Disputes – for QSEs Shut down TML component for Service Requests This will isolate TCH processing… –Inbound MP transactions will be held at Paperfree NAESB EDM Response ANSI Responses Held transactions will be converted to XML and staged for TCH After inbound shut down, all in-flight transactions will continue to be processed and corresponding outbound transactions will be delivered throughout the day until the queues have been cleared Friday, April 15 th (mid-day) ERCOT will… Keep up NAESB and Paperfree Shut down XML Mover (for 814 & 824 transactions) and 867 Upload Shut down TML component for Settlement Disputes – for QSEs Shut down TML component for Service Requests This will isolate TCH processing… –Inbound MP transactions will be held at Paperfree NAESB EDM Response ANSI Responses Held transactions will be converted to XML and staged for TCH After inbound shut down, all in-flight transactions will continue to be processed and corresponding outbound transactions will be delivered throughout the day until the queues have been cleared Transaction Processing - Inbound PR-40066_03 Siebel 7 Upgrade Implementation Plan ERCOT will continue to send…

Friday, April 15 th (early evening) ERCOT will… Stop sending 814 & 824 transactions Begin Siebel code migration and data conversion Friday, April 15 th (early evening) ERCOT will… Stop sending 814 & 824 transactions Begin Siebel code migration and data conversion Transaction Processing - Outbound PR-40066_03 Siebel 7 Upgrade Implementation Plan

Beginning Saturday, April 16 th through Sunday, April 17 th ERCOT will… Evaluate where we are in the conversion process Identify any remaining activities Take periodic “Go Live” Check Points No-Go… Continue to work through conversion Identify remaining effort and determine next check-point Back out Plan (Time schedule being finalized) Go Live… Test verification of Production systems Turn on all Inbound and Outbound processing Begin monitoring transaction flows Beginning Saturday, April 16 th through Sunday, April 17 th ERCOT will… Evaluate where we are in the conversion process Identify any remaining activities Take periodic “Go Live” Check Points No-Go… Continue to work through conversion Identify remaining effort and determine next check-point Back out Plan (Time schedule being finalized) Go Live… Test verification of Production systems Turn on all Inbound and Outbound processing Begin monitoring transaction flows Upgrade Activities PR-40066_03 Siebel 7 Upgrade Implementation Plan

Monday (4/11) & Wednesday (4/13) 2:00pm Retail Market Calls ERCOT discussion of upcoming shut-down schedule Friday April 15th (mid-day) ERCOT transaction processing update “in queue” “in process” Overall system health CRs & TDSPs to provide status of transaction volumes Friday April 15th (early evening) ERCOT transaction processing update “in queue” “in process” Overall system health Monday (4/11) & Wednesday (4/13) 2:00pm Retail Market Calls ERCOT discussion of upcoming shut-down schedule Friday April 15th (mid-day) ERCOT transaction processing update “in queue” “in process” Overall system health CRs & TDSPs to provide status of transaction volumes Friday April 15th (early evening) ERCOT transaction processing update “in queue” “in process” Overall system health PR-40066_03 Siebel 7 Upgrade Implementation Plan Conference Calls

Saturday April 16th (late afternoon) Migration Progress Issues Go / No-Go Decision Sunday April 17th (morning) Migration Progress Issues Go / No-Go Decision Sunday April 17th (late afternoon if needed) Migration Progress Issues Go / No-Go Decision Saturday April 16th (late afternoon) Migration Progress Issues Go / No-Go Decision Sunday April 17th (morning) Migration Progress Issues Go / No-Go Decision Sunday April 17th (late afternoon if needed) Migration Progress Issues Go / No-Go Decision PR-40066_03 Siebel 7 Upgrade Implementation Plan Conference Calls

ERCOT has run “ ” v7.7 Test Cases with all applications in iTest. ERCOT currently has only “ ” open defects out of a total of “ ” logged. To date, ERCOT has identified “ ” Defects These defects are categorized as follows… xx - Documentation and Script errors or Data xx - Bugs (Coding errors requiring application level changes) xx - System or Environment related xx - Unknown (Root cause not reported or still in analysis) ERCOT has run “ ” v7.7 Test Cases with all applications in iTest. ERCOT currently has only “ ” open defects out of a total of “ ” logged. To date, ERCOT has identified “ ” Defects These defects are categorized as follows… xx - Documentation and Script errors or Data xx - Bugs (Coding errors requiring application level changes) xx - System or Environment related xx - Unknown (Root cause not reported or still in analysis) PR-40066_03 Siebel 7 Upgrade Implementation Plan Testing Results

Below is the status to-date of the Siebel 7.7 Testing Efforts in anticipation of the 04/17/2005 roll-out. Test Description UATPerformance Transaction Processing XX % completeXX % complete eService / CRMXX % completeXX % complete GUI XX % completeXX % complete Data Archive ReportingXX % completeXX % complete Below is the status to-date of the Siebel 7.7 Testing Efforts in anticipation of the 04/17/2005 roll-out. Test Description UATPerformance Transaction Processing XX % completeXX % complete eService / CRMXX % completeXX % complete GUI XX % completeXX % complete Data Archive ReportingXX % completeXX % complete PR-40066_03 Siebel 7 Upgrade Implementation Plan Testing Results