Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.

Slides:



Advertisements
Similar presentations
Time Series for Central West Grand Terre Island of the Lafourche Shoreline Aerial Video Survey Program Pontchartrain Institute of Environmental.
Advertisements

Feasibility Study Overview Louisiana Coastal Area Ecosystem Restoration 19 September 2000.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Matthew Nowlin – CPRA – Staff.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration.
Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.
U.S. Department of the Interior U.S. Geological Survey Land Area Change and Overview of Hurricane Impacts in Coastal Louisiana, By John A. Barras.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
Shell Island West NRDA Restoration
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
Coastal Protection and Restoration Authority January 18, 2012 Deepwater Horizon Early Restoration Phase I.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Southeast Louisiana Flood Protection Authority – East (SLFPA-E) and Pontchartrain Levee District Recommendations for Early Emergency Restoration Projects.
Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Presentation to the: Governor’s Advisory Commission Chris Accardo Chief, Operations Division.
Governor's Advisory Commission on Coastal Protection, Restoration, and Conservation June 6, 2012 Deepwater Horizon.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® The RESTORE ACT and other Economic Opportunities 4 September 2013 Alabama Section American.
Time Series for the east end of Raccoon Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009.
Morganza to the Gulf of Mexico Project State & Local Views and Path Forward Jerome Zeringue CPRA.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Oil Spill Restoration Planning – Part 1 (RESTORE Act, NRDA, SEPs) Kyle Graham Deputy Executive Director CPRA 8/22/2012 committed to our coast.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
CPRA Financing Corporation December 18, 2012 Deepwater Horizon Oil Spill.
Time Series for Ocean, La of the Louisiana Chenier Plain Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University.
April 20, 2011 Shoreline Protection Emergency Restoration Plan.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
CONSERVATION AND RESTORATION PARTNERSHIP FUND FY 2014 Request For Proposals September 18, 2013.
Oyster Advisory Commission October 3, 2012 Deepwater Horizon.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
Fiscal Year 2012 Annual Plan Integrated Ecosystem Restoration and Hurricane Protection in Louisiana Coastal Protection and Restoration Authority Karim.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Spill Related Planning Efforts September 15, 2010 Kyle Graham Governor’s Office Coastal Activities.
Comparison Photo Pairs for the Isles Dernieres of the Teche Delta Aerial Video Survey Program Pontchartrain Institute for Environmental Sciences.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
Comparison Photo Pairs for Grand Isle and Grand Terre Islands of the Lafourche Delta Aerial Video Survey Program Pontchartrain Institute for.
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
CCMP UPDATE and DRAFT of ACTION PLANS
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
CPRA Program Update ACEC Project Outlook November 17th, 2016
Louisiana Coastal Area
CPRA Program Update ACEC Project Outlook 2017 November 16, 2017
Beneficial Use of Dredged Material
Fab-Five Projects New Orleans FY19-FY23
Committed to our coast Preliminary Assessment of Restoration Impacts in the Isles Dernieres, Terrebonne Parish, LA CPRA Board Meeting Baton Rouge,
Presentation transcript:

Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department of Natural Resources

CIAP Current Timeline Involve CPRA Interagency Planning Team and Corps of Engineers in screening of CIAP proposalsInvolve CPRA Interagency Planning Team and Corps of Engineers in screening of CIAP proposals –Governor submitted Plan to DOI Secretary and Minerals Management Service (MMS) June 1, 2007 –State began implementing several restoration projects included in Plan, using State funds June 2007 –MMS determined Plan to be complete; initiated approval review July 30, 2007 –MMS approval of Plan anticipated; State begins submitting CIAP grant applications to MMS Late October 2007

State Early Action Projects -ENGINEERING AND DESIGN -Violet Diversion -Freshwater Bayou Bank Stabilization -Mississippi River Sediment Delivery Pipeline -Bayou Lamoque Diversion -Orleans Land Bridge Shoreline Protection -Blind River Freshwater Siphon -CONSTRUCTION -East Grand Terre Island -Barataria Land Bridge Dedicated Dredging -Grand Lake Shoreline Protection -Beneficial Use of Dredged Material -GIWW Bank Restoration -Terrebonne Parish -Rockefeller Shoreline Demo -Lake Salvador, Phase III Coastal Forest Conservation Initiative (Acquisition)

Surplus-Funded Restoration Projects Biloxi Marsh ($22M) Caminada Headlands OR HNC Complex ($40M) Marsh Creation near Freshwater Bayou ($4M) Cameron Parish Shoreline ($31M) Beneficial Use – Calcasieu Ship Channel ($5M) Pipeline Conveyance in Plaquemines Parish ($22M)

State Restoration Projects  44 projects completed: $49.71M  Dedicated Dredging Program: 2 currently under construction, Grand Bayou Blue ($1.8M) and the Point Au Fer ($2.5M) project  Mississippi River Reintroduction Into Bayou Lafourche (BA-25b): currently in design ($184M)  Barrier Island Maintenance Program (BIMP): Engineering and design has been initiated on the first project funded through BIMP, the Bay Champagne Marsh Creation project ($3.5M)

CWPPRA Projects  143 active projects since 1991  74 projects completed – $625M; 71,000 ac protected/restored; 391,000 total acres benefited  14 projects under construction, 7 designed, 48 in E&D  7 projects ($183M) “ready to construct” but unfunded  LA CWPPRA Funding = $ 2.4B  143 active projects since 1991  74 projects completed – $625M; 71,000 ac protected/restored; 391,000 total acres benefited  14 projects under construction, 7 designed, 48 in E&D  7 projects ($183M) “ready to construct” but unfunded  LA CWPPRA Funding = $ 2.4B

Oyster lease Acquisition and Compensation Program Leases Acquired Bush Canal Bank Stabilization and Seabreeze Embankment Reconstruction Project Terrebonne Parish Consolidated Government –(CIAP) Shoreline Protection in Lake Borgne at Shell Beach and Bayou Dupre Project (PO- 30) (CWPPRA) Pending Leases Acquisition North Lake Mechant Landbridge Restoration Project (TE-44) (CWPPRA) Pass Chaland to Grand Bayou Pass Barrier Shoreline Protection Project (BA-35) (CWPPRA) Barataria Barrier Island Complex Project: Pelican Island and Pass Chaland to Pass La Mer Barrier Island Restoration project (BA-38) (CWPPRA) Biological Survey Conducted Morganza to the Gulf Hurricane Protection Project Terrebonne Levee and Conservation District (Other Agency Request) Total Surveyed Acreage – 27,633.4 Number of Leases Acquired – 9 Pending Lease Acquisitions – 49

Beneficial Use of Dredged Material Large opportunity along Corps-maintained channels State contributed $1.4M for Wine Island restoration near HNC CIAP ($20M), State surplus funds ($5M) and LCA funds ($100M) to be available State, Port of Lake Charles, Calcasieu Parish, Corps, and landowner working to restore marsh near Calcasieu Ship Channel using CIAP and State surplus funds Large opportunity along Corps-maintained channels State contributed $1.4M for Wine Island restoration near HNC CIAP ($20M), State surplus funds ($5M) and LCA funds ($100M) to be available State, Port of Lake Charles, Calcasieu Parish, Corps, and landowner working to restore marsh near Calcasieu Ship Channel using CIAP and State surplus funds

SCIENCE 1. LCA S&T Program:  Support the science and technology necessary to effectively address coastal ecosystem restoration needs and provide analytical tools, programmatic and project-specific reviews, and recommendations for studies to investigate scientific and technological uncertainties  FY 06: $7M; FY 07: $5M 2. Coastwide Reference Monitoring System- Wetlands (CRMS-Wetlands):  To date, 371 sites have been visited and characterized and approximately 176 sites are fully operational and collecting all data parameters  $20.3M in funding authorized through FY Barrier Island Comprehensive Monitoring (BICM):  Completed Coastal post-storm assessment video and photography  Complete Coast-wide Shoreline Erosion Rates for Historic, Long-term, Short- term, and Near-term Time Periods (1880’s, 1920’s, 1980’s, 2004, 2005)  Completed Bathymetric Surveys for sandy shorelines (Sabine to Mermentau, Raccoon Island to Sandy Point, and Chandeleur Islands)  Completed LiDAR Surveys for sandy shorelines  $0.5M yearly

Coastal Use Permit Streamlining Processing time for all permits reduced by 51% (59.9 days to 30.6 days) between 2002 and 2006.