Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009.

Similar presentations


Presentation on theme: "Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009."— Presentation transcript:

1 Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009 www.lacpra.org

2 FY 2010 Annual Plan FY 2010 Annual Plan Team  Kirk Rhinehart, OCPR Planning Branch Administrator  Karim Belhadjali, Coastal Resources Scientist Manager  Mandy Green, Coastal Resources Scientist Supervisor  Other OCPR technical staff  Brown and Caldwell staff  RAND staff

3 FY 2010 Annual Plan Presentation Outline  Introduction  Legislative Requirements  Annual Plan Overview  Budget Summary  Project Execution  Next Steps

4 FY 2010 Annual Plan State Master Plan  The State Master Plan is a conceptual vision of a sustainable coast based on the best available science and engineering.  It builds on past efforts and existing programs to provide this comprehensive vision.  Has four primary objectives: –Reduce risk to communities, –Restore sustainability to coastal ecosystem, –Maintain a diverse array of fish and wildlife habitats, and –Sustain Louisiana’s unique heritage and culture.

5 FY 2010 Annual Plan Annual Plan Complements Master Plan  The Master Plan is a conceptual document that will be updated roughly every five years.  The Master Plan did not: –inventory all ongoing and future coastal projects, –establish specific schedules by which these projects would be implemented, or –set forth funding schedules.  Instead, the Annual Plan is published each year by the Office of Coastal Protection and Restoration (OCPR) and includes these aspects of coastal planning.

6 FY 2010 Annual Plan Legislature and Governor’s Office Directed  Act 8 of the 2005 1 st Special Session created the Coastal Protection & Restoration Authority (CPRA).  Act 8 directs the CPRA to prepare an Annual Coastal Protection and Restoration Plan for submission to the legislature.  Executive Order BJ 2008-7, signed January 2008, requires state agencies to administer activities in accordance with the tenets of the Master Plan.  Act 545 of 2008 directs the CPRA to integrate staff from DNR and DOTD to form the Office of Coastal Protection and Restoration.

7 FY 2010 Annual Plan The Louisiana Office of Coastal Protection and Restoration  July 1, 2008 Office of Coastal Protection and Restoration was established.  Combined staff from the Department of Natural Resources and the Department of Transportation and Development.  OCPR will be the lead in planning, design, construction, and operations, maintenance, and monitoring of all coastal projects.  OCPR includes the Louisiana Applied Coastal Engineering and Science (LACES) program committed to applying best science and engineering practices to all phases of the program.

8 FY 2010 Annual Plan The FY 2010 Annual Plan  Presents progress made in the prior year.  Lists projects planned for the following year and planned two years out.  Identifies funding needs.  Describes how CPRA and our partners intend to protect and restore Louisiana’s coast in 2010.  Gives budgets and schedules for coastal protection and restoration efforts to increase accountability.

9 FY 2010 Annual Plan New Information and Format  Act 545 requires the Annual Plan to include: – a three-year budget, –an implementation projection, and –a program progress assessment.  Appendix A provides annual project summaries.  Appendix B provides 3-year program spending projections.  Appendix C is The Barrier Island Report.  Appendix D is a compilation of project concepts for future consideration.  Appendix E provides a list of Master Plan Urgent Early Actions associated with specific on-going projects

10 FY 2010 Annual Plan Projected 3-Year Revenues (FY 2010 through FY 2012 Revenue Sources 2009 ($1,000) 2010 ($1,000) 2011 ($1,000) 2012 ($1,000) 3-Year Total ($1,000) CPR Trust Fund$55,299$45,921$45,113$45,313$136,347 CIAP$67,000$75,000 $50,000$200,000 Surplus '07 and '08 remaining$435,925$0 $435,925 GOMESA$0 $4,800$12,000$16,800 Carry Over From Previous Year$65,625$35,421$0 $35,421 Total$623,849$156,342$124,913$107,313$824,493

11 FY 2010 Annual Plan Potential Additional Funding  $300M State Surplus 2009 requested by Governor Jindal.  $28M for the state $417M for coastal parishes from Community Development Block Grants (CDBG).  $50M Hazard Mitigation Grant from FEMA.  Federal Economic Stimulus may provide additional funds to the state.  Tobacco Settlement Funds may be made available through securitization of the Louisiana Tobacco Settlement.  GOMESA Bond Money could contribute an additional $500M to $1B over the near team.

12 FY 2010 Annual Plan Project Funding Sources State Surplus Local Funds CWPPRA CIAP MMS Capital Outlay HSDRRS FED LPV State Trust Fund CDBG

13 FY 2010 Annual Plan Total Projected 3-Year Expenditures Programs 2009 ($1,000) 2010 ($1,000) 2011 ($1,000) 2012 ($1,000) Total ($1,000) CIAP Projects$67,000$75,000 $50,000$200,000 CWPPRA Projects$15,303$16,000$17,000$18,000$51,000 Surplus '07 and Surplus '08 Projects$64,075$163,108$116,908$55,908$435,925 WRDA Projects$20,000$13,925$16,039$16,320$46,284 Beneficial Use Program$21,000$25,000 $75,000 Project OM&M$4,593$11,417$11,679$7,814$30,910 Barrier Island Maintenance Program$3,500 $10,500 Ongoing Programs$16,275$18,050$18,150$18,175$54,375 Support/Emergency Response/Reserve$17,225 $51,675 CPRA Operating Costs$20,107$19,764$20,527$21,323$61,421 HSDRRS LERRDS and 30 year payback$0$300,000$0$62,000$262,000 Total Planned Expenditures$249,078$662,989$321,028$295,265$1,279,090

14 FY 2010 Annual Plan FY 2010 Expenditures by Phase Total Expenditures ($663M)

15 FY 2010 Annual Plan Restoration Projects in Design and in Construction No. of Projects

16 FY 2010 Annual Plan 3-Year Project Expenditures by Planning Unit Note: Includes planning, engineering, construction and OM&M, but excludes $362M LERRDs and 30 year payback, ongoing programs, and operating cost.

17 FY 2010 Annual Plan Sample 3-Year Project Schedules Fiscal Year201020112012 QuarterQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Project Name STATE Cameron Creole Levee OOOOOOOOOOOO Larose to Golden Meadow CCCCCCC CWPPRA Phase 1 1 West Pointe a la Hache Outfall Management WWWWWWWWWWWW Mississippi River Reintroduction Into Northwest Barataria Basin DDDDDDDDDDDD Riverine Sand Mining/Scofield Island Restoration DDDDDDDWWWWW CWPPRA Phase 2 Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration C Dedicated Dredging on the Barataria Basin Landbridge CCC Pelican Island and Pass La Mer to Chaland Pass Restoration (B) CC CIAP Barataria Landbridge CCC000000000 Lake Salvador Shoreline Protection OOOOOOOOOOOO Grand Lake Shoreline Protection CCCCC0000000

18 FY 2010 Annual Plan Next steps  Include reporting on public, private, and federal protection and restoration efforts.  Improve project benefits analysis and feedback (adaptive management) through LACES.  Establish Regional Planning Teams.  Further develop project prioritization and scheduling tools.

19 FY 2010 Annual Plan New Project Prioritization Tools  New tools for evaluating and selecting future projects.  Tools include Project Benefit Scoring.  Tools utilize Master Plan’s four objectives to evaluate benefits.  Tools anticipated to clarify which projects provide most benefit based on achieving Master Plan objectives.  Tools can also associate benefits with project costs.

20 FY 2010 Annual Plan Project Benefits Are Scored for Each Objective within the Master Plan Objective 1 Reduce economic losses from storm based flooding --------------------- Concentrated assets Distributed assets Strategic resources Objective 2 Promote a sustainable coastal ecosystem ------------------- Ecosystem productivity Process exchange Objective 3 Provide habitats for commercial and recreational activities ------------------------ Habitat suitability Wetland area Objective 4 Sustain the unique heritage of Coastal Louisiana ------------------------ Coastal heritage Natural resources Sustainable balance

21 FY 2010 Annual Plan Raw Project Benefit Scores (Example Projects) Reduce economic losses from storm based flooding Promote sustainable coastal ecosystem Provide habitats for commercial and recreational activities Sustain the unique heritage of coastal Louisiana Project12345678910 BA-71: Medium Diversion with Dedicated Dredging at Myrtle Grove ---+++ +++= LA-10: LCA Barataria Basin Barrier Shoreline - 2007 ---+++ =+++ BS-13 (EB): Bayou Lamoque Floodgate Removal --- +++=++= ME-20: South Grand Chenier Hydrologic Restoration Project -- +++====

22 FY 2010 Annual Plan Prioritization as a Function of Cost (Example Projects) Project Total Project Scores as a function of Cost Weight 0%20%40%60%80%100% BA-71: Medium Diversion with Dedicated Dredging at Myrtle Grove LA-10: LCA Barataria Basin Barrier Shoreline - 2007 BS-13 (EB): Bayou Lamoque Floodgate Removal ME-20: South Grand Chenier Hydrologic Restoration Project Key: Lowest Highest

23 FY 2010 Annual Plan Prioritization and Scheduling Summary  A work in progress.  Project level benefits scoring vs. regional level.  Model includes scheduling and funding optimization capabilities.  Tools limited by available data.  Regional Planning Team input key component to tool development.  Demo in the back of the room for those of you interested in the details.

24 FY 2010 Annual Plan Regional Planning Teams  Three Regional Planning Teams will be established in July 2009.  Goals: –improve the plan’s responsiveness to conditions on the ground and the coastal communities affected, –provide regional input into prioritization and scheduling tools, –identify issues and concerns, and –report back on the plan’s progress to their communities.

25 FY 2010 Annual Plan Project Concepts for Future Consideration  FY 2010 Annual Plan expends all available dollars unless additional State Surplus Funds are made available.  If additional funds are made available new starts are possible.  Appendix D provides a compilation of project concepts for future consideration.  Public is encouraged to review Appendix D and provide ideas about projects listed and project prioritization.

26 FY 2010 Annual Plan Public Comments Address written public comments to: Karim Belhadjali P. O. Box 44027 Baton Rouge, LA 70804 or info@lacpra.org Public Comment Period Closes March 27, 2009

27 FY 2010 Annual Plan QUESTIONS & DISCUSSION Comments

28 FY 2010 Annual Plan State CPRA Operating Costs Program FY2009FY 2010FY2011FY 20123-Year Total OCPR $14,609$12,280$12,718$13,170$38,168 DOTD Section 11 $2,100$2,128$2,266$2,414$6,808 CMD $1,718$1,890$2,013$2,144$5,854 GOCA $1,880 $5,640 DNR Secretary $1,900$1,586$1,649$1,715$4,951 Total $22,207$19,764$20,527$21,323$61,421

29 FY 2010 Annual Plan Ongoing Programs Projected 3-Year Expenditures Program FY2009 ($1,000) FY 2010 ($1,000) FY2011 ($1,000) FY 2012 ($1,000) 3-Year Total ($1,000) Coastal Science Assistantship Program$100$200$300 $800 Assistance to Levee Authorities$1,000 $3,000 Donations for Mitigation Activities$933$900 $2,700 CIAP Program Management$1,000 $3,000 Louisiana Applied Coastal Engineering and Science Program$11,500$10,500$12,000 $34,500 GIS Lab Support$250$500 $1,500 Christmas Tree Projects$350 $1,050 Vegetative Plantings$400 $1,200 Flood Protection and Ecosystem Restoration Conference$100 $125$325 Community Outreach (formerly America's Wetland Conservation Corps)$500 $1,500 Restoration Partnerships$2,000$3,000 $9,000 Atchafalaya Basin Natural Resources Inventory and Assessment$0$1,500$0 $1,500 Support for Department of Wildlife and Fisheries$75$0 Programmatic Total$18,208$18,050$18,150$18,175$54,375

30 FY 2010 Annual Plan

31

32

33

34


Download ppt "Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009."

Similar presentations


Ads by Google