Status of the FAIR pbar Source K. Knie May 3, 2011.

Slides:



Advertisements
Similar presentations
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
Advertisements

The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Intensity Limits and Beam Performances in the High-Energy Storage Ring
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Status Report Walter F. Henning.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
Working Group 5 Summary David Christian Fermilab.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Low energy ν-beam for EUROSB Marcos Dracos, Nikos Vassilopoulos IPHC Strasbourg, IN2P3/CNRS.
Valery Dormenev Institute for Nuclear Problems, Minsk
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
Safety issues for WP2 E. Baussan on behalf of WP2.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Beam line Experiment area SC magnet Pion production target
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Studies on pion/muon capture at MOMENT Nikos Vassilopoulos IHEP, CAS August 11, 2015.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Update on radiation estimates for the CLIC Main and Drive beams Sophie Mallows, Thomas Otto CLIC OMPWG.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Russian Research Center” Kurchatov Institute” Shock wave propagation near 450 GeV and 7 TeV proton beams in LHC collimator materials Alexander Ryazanov.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
General overview, layout of the pbar separator Target handling concept FLUKA calculations - for the target station - for the shielding flask Status of.
Oleksiy Dolinskyy 1st December, 2014
High energy beam transport.
Schedule for the FAIR Antiproton Target
Status of HESR 18th March Gießen Dieter Prasuhn.
Positron production rate vs incident electron beam energy for a tungsten target
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
Horn and Solenoid Options in Neutrino Factory
Calculation of Beam Equilibrium and Luminosities for
Simulation of Luminosity Variation
Alexander Mikhailichenko July 22, 2008
Large Booster and Collider Ring
of secondary light ion beams
of secondary light ion beams
NuSTORM - μ Storage Ring with Injection
Russian Research Center “ Kurchatov Institute”
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
HE-JLEIC: Do We Have a Baseline?
Presentation transcript:

Status of the FAIR pbar Source K. Knie May 3, 2011

FAIR accelerators p-bar target p-linac Super- FRS SIS100 SIS300 HESR CR RESR Unilac SIS 100 NESR HESR Antiproton Production Target SIS18 Upgrade CR FAIR Baseline Layout RESR p-linacSIS 300 Accelerator SuperFRS PANDA Atomic Phys. Plasma Phys. Low Energy Exp. High Energy Exp. NESR Exp. FLAIR Atomic Physics HADES & CBM Experiment

FAIR / CERN / FNAL pbar Sources cycle time 10 s (cooling time in the CR) overall pbar yield: 5 × pbar/p (scaled CERN data) → 1 × 10 7 pbar/s Increases the pbar yield by  50 % FAIR Collector ring will be operated at h = 1, CERN ring was operated at h = 6 Time needed for stochastic cooling in CR (AC), upgrade possible FAIRCERN (AC+AA)FNAL E(p), E(pbar)29 GeV, 3 GeV25 GeV, 2.7 GeV120 GeV, 8 GeV acceptance 240  mm mrad200  mm mrad  30  mm mrad protons / pulse2 × × ≥ 5 × pulse lengthsingle bunch (50 ns)5 bunches in 400 nssingle bunch 1.6 µs cycle time10 s4.8 s1.5 s

pbar Distribution After the Target R.P. Duperray et al., Phys. Rev. D 68, (2003) p pbar = 3.82 GeV/c ± 3% From ~ 2.5 × pbar / (p cm target) ~ 5 × (or 2 %) are "collectable" z / cm y / cm E p = 29 GeV

MARS Simulation of the pbar Distribution After the Target

CERN ACOL Horn, I = 400 kA Collecting pbars: Magnetic Horn target beam axis magnetic field area

Collecting pbars: Magnetic Horn

MARS Simulation of the pbar Yields yield = pbars in the ellipse primary protons

MARS Simulation of the pbar Yields Ir:  p = 1.8 b  pbar  =  2.0 b p pbar C:  pbar  =  0.42 b

Temperature Increase in the Target c Ir = 130 J kg -1 K -1 c Cu = 385 J kg -1 K -1 c Ni = 440 J kg-1 K -1

FAIR / CERN / FNAL pbar Sources cycle time 10 s (cooling time in the CR) overall pbar yield: 5 × pbar/p (based on CERN data) → 1 × 10 7 pbar/s Increases the pbar yield by  50 % FAIR Collector ring will be operated at h = 1, CERN ring was operated at h = 6 Time needed for stochastic cooling in CR (AC), upgrade possible FAIRCERN (AC+AA)FNAL E(p), E(pbar)29 GeV, 3 GeV25 GeV, 2.7 GeV120 GeV, 8 GeV acceptance 240  mm mrad200  mm mrad  30  mm mrad protons / pulse≥ 2 × × ≥ 5 × pulse lengthsingle bunch (50 ns)5 bunches in 400 nssingle bunch 1.6 µs cycle time10 s4.8 s1.5 s cycle time 10 s (cooling time in the CR) overall pbar yield: 1 × pbar/p → 2 × 10 7 pbar/s scaled CERN data: 1 × 10 7 pbar/s

Pulsed Target: FLUKA Simulation horn

FLUKA results pbar, 0 A pbar, 500 kA p, 0 A p, 500 kA Cu target, r = 6.5 mm primary protons homogeneously distributed in a disc with r = 1 mm

FLUKA results It is likely that FLUKA overestimates the production cross section. Therefore, the absolute yields might be a factor 2 to high.

Li Lens – A Possible Upgrade?  < 100 mrad can be collected I = 1 MA (I ~ r²) Distance target center - lens: 100 mm technically challenging / expensive 20 mrad <  < 80 mrad can be collected I = 0.4 MA Distance target center - lens: 220 mm more simple and reliable, less expensive

Li Lens – A Possible Upgrade?

Experimental data from CERN: A 36 mm/1.3 MA lens gave a 30% higher yield (with nominal production beam) compared to a 0.4 MA horn. (with a target optimized for the Li lens)

The Production Target Al block Ti window inside: Ni rod (r = 0.15 cm, l = 10 cm) within graphite cylinder (r = 1 cm) air cooling

Target Station

The pbar Separator 240  mm mrad  p/p = ± 3 % CR-type magnets

Pbar Target Building: Horizontal Cut 8 m

Pbar Target Building: Vertical Cut 8 m

Dose rates around the pbar target 170 m

Equivalent dose rates during operation

Induced Activity after Shut-Down airplane at m

Induced Activity after Shut-Down Operation on air for 20 m after the target. pbar losses are about 5 % when He bags are used.

Target Exchange (target on air!)

Target Station

Hot Cell

Target Exchange target station tunnel ground level

Life time doses for the magnet coils

20 MGy50 MGy Polyimide insulation required

Life time doses for the magnet coils J-PARC:: 1) Polyimide resin insulation (PI) for up to 100 MGy; 2) Mineral insulation magnet cables (MICs) with larger cross sections for higher radiation dose up to 100 GGy. Approximately 20 polyimide insulation magnets and 10 MIC magnets were designed. The fabrication started in The stranded conductors impregnated by the polyimide resin to form the coil