Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
Environmental Protection Agency Montenegro. Competent Authority Since November 2006, The competent authority for environmental issues was the Ministry.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
Planning Permission Process and Procedures
Substantive environmental provisions Prof. Gyula Bándi.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
Environmental Legislation and Agencies Review. Sets a time table for phasing out ozone- depleting substances.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
ENVIRONMENTAL MONITORING AND REPORTING BY ENTERPRISES FEASIBILITY OF DEVELOPING MONITORING GUIDELINES FOR CHEMICAL INDUSTRY IN EASTERN EUROPE, CAUCASUS.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
Acquis communautaire in Chapter 27 – Environment
Ship Recycling Facility Management System IMO Guideline A.962
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Berlin, Joint -Meeting, 28. Sept Helmut Döhler IPPC / IED Directive and Seville-Process.
1. To respond to specific recommendations of Agenda 21 requiring priority action in ASEAN. 2. To introduce policy measures and promote institutional development.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Environmental auditing
Landfill acceptance criteria: justification and background Heijo Scharff FEAD Workshop Implementation of the Landfill Directive Budapest, Hungary, 11 May.
TYPE, PLACE AND CONTENT OF THE CONDITIONS IN A PERMIT BOYKO MALINOV BULGARIA.
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
Fuel quality improvement steps towards EU approximation in Macedonia Slavjanka Pejcinovska-Andonova, REC CO Macedonia, Project Manager Szentendre, October.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
1 Permitting of industrial facilities in Croatia.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
Regulatory Framework for Uranium Production Facilities in the U.S.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Consultant: CMDC Joint Venture 1 Multi-Country Conference Prague 7-9 June 2004 Selected challenges in IPPC permitting - experience from CEE Vibeke Burchard.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Experience with Integrated Inspection and IP revision in CR Monika Přibylová.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Group EIA 1: Screening for Annex 2 Both:- case-by-case - thresholds < 10% goes to EIA All Countries have problems with “Salami Slicing” Little Information.
ECENA NETWORK Study tour Denmark Standard condition by Lars Christensen.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Aleksandra Antonowicz Green Federation GAJA/CCB
EEB 2017 report ‘BURNING: THE EVIDENCE’
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries

StrategyEnv. permitting lawImplementing legislation In EU, there are countries which have:  no implementing legislation but many more or less compulsory guidelines,  one ordinance or regulation covering all necessary forms and instructions for the implementation,  Several regulations or decrees with individual forms and instructions

Scope of the implementing legislation Application form and instructions how to fill it in Scope of the statement from concerned authorities Permit form Any compulsory methodology – e.g. the content of BAT guidance Instructions on setting up and organizing the BAT support body or system of information exchange on BAT

Application form for integrated permit – content 1/3 A.Data on the company B.Environmental management system C.Data related to the installation and its location D.List of raw materials, secondary raw materials and other substances and energy consumed or produced E.Description of emissions from the installation into all media and establishment of significant consequences of emissions on the environment and human health

Application form for integrated permit – content 2/3 F.Description of the environment at the installation site G.Description of measures and equipment used for control of the installation and emissions H.Detailed analysis of the installation in relation to BAT I.List of measures after shutdown of the installation for avoiding all pollution or human health threats and remediation of the site

Application form for integrated permit – content 3/3 J. Identifying participants in the process if the installation would have transboundary effects K. Statement of the operator with signature L. Abbreviations and symbols M.Annexes N.Proposal of integrated permit conditions

Application form - proposal of permit conditions The content corresponds to the integrated permit content. For existing installation it should among others contain improvement program for compliance with BAT guidance. It represents the wish of the operator how the binding conditions in the permit should look like. This can be accepted by the regulator, or it becomes a base for negotiation.

Integrated permit template is based on the recommendations for the environmental permitting law addresses all of the requirements of the Industrial Emissions Directive 2010/75/EU all environmental media are addressed along with emissions and environmental monitoring contains examples of conditions that could be set for an installation.

Integrated permit template - Integrated permit template - content 1.Description of the installation and connected activities and its location 2.Operating conditions incl. ELVs and other requirements to protect environment, reporting and improvement program 3.Expiring of existing permits 4.Justification 5.Information about appeal

Operating conditions – scope 1/3 1.Emission limits for air and water protection and monitoring

Operating conditions – scope 2/3 2.Emissions to land and related monitoring 3.Site and Roads 4.Prevention of accidents and minimisation of their effects 5.Management (e.g. operational instructions) 6.Incidents and Complaints 7.Efficient use of raw and supplementary materials and water 8.Energy efficiency 9.Waste storage, handling, recovery or disposal

Operating conditions – scope 3/3 10.Noise and Vibration 11.Closure and Decommissioning 12.Reporting on assessment of the compliance with permit conditions 13.On site monitoring 14.Improvement program

Recommendations Firstly set up scope of the permit conditions. Design the application form, which will give you relevant information for making decision about permit conditions. It is useful to test both the application and the permit. Well structured application with relevant information is preconditions for smooth and efficient permitting procedure.

Děkuji za pozornost – time for lunch