Documentation Traceability and documentation is required.

Slides:



Advertisements
Similar presentations
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Advertisements

AS9102 First Article Inspection Report
WELD TEST SPECIFICATIONS TOPICS COVERED IN THIS PRE TEST BRIEFING: ASME SECTION IX CODE WELD TEST SPECIFICATIONS VISUAL INSPECTIONS SAFETY IN WELDING.
Formal Process of QA and quality related certifications Formal Process of QA and quality related certifications MIM 3 rd year – Sem V Abhishek Mishra –
PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.
ISO 9001:2000 Documentation Requirements
Codes & Standards.
Software Quality Assurance Plan
How ISO9001 Compares with CMM Mark C. Paulk JAN,1995 CMM version 1.1 ISO9001 July 1994 presented by Zhilan Zhou.
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Qualification for Brazing
First Article Inspection Report
CARES and the reinforced concrete industry
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
The ISO 9002 Quality Assurance Management System
Project Management Quality Management* Dr. Khalid S. Husain * 07/16/96
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ISO 9001 Interpretation : Exclusions
For the benefit of business and people
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
ISO 9000 Introduction Imran Hussain.
Even More SQA: Work Procedures
Tim Haeberle API SC Winter Meeting
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module IV Traceability.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
Metal Fabrication Quality and conformity of our products 2015.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Supplier Quality Improvement
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Duties and Responsibilities
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Welding Career Opportunities ExPERIENTIAL LEARNING TECHNOLOGY Welding Career Opportunities Overview.
"Welder Certification" Weldertraining.org The purpose of this presentation is to introduce you to the various aspects of welder certification. This is.
Requirements of Documents for Quality Management System ISO 9001 Certification.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
What is ISO Certification? Information is a valuable asset that can make or break your business. When properly managed it allows you to operate.
T RACEABILITY OF R ECORDS. M EI B ETH S HEPHERD 3 rd Party Assessors Consultants.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
QUALITY ASSURANCE.
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
ISO/IEC
CLEAN UP & INSPECTION.
ISO 9000.
ExTAG Training Workshop Calgary 2012 QAR related Issues
UNIT V QUALITY SYSTEMS.
Traceability of Gas Pipeline Materials Research & Materials Manager
TRACEABILITY REQUIREMENTS UNDER EU GENERAL FOOD LAW
ISO 9001 Awareness Training.
First Article Inspection
AS 9100 Awareness Training.
ISO 9001:2008 Quality Management Systems
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Identification, traceability and serialisation
Presentation transcript:

Documentation Traceability and documentation is required

Documentation What is traceability ? The formal definition: Traceability is the ability to chronologically interrelate uniquely identifiable entities in a way that is verifiable. Traceability is the ability to verify the history, location, or application of an item by means of documented recorded identification.

Traceability What does this mean ??  The practical implementation of traceability will often vary according the product/application  For off-shore fabricators the implementation will be more comprehensive than for ex shipbuilding

Traceability From NORSOK M-601::: The WPQR/PQR documentation shall include the material certificates for the base and filler materials applied in the weld qualification test. All welding and related activities shall comply with the requirements of ISO and the additional requirements of this NORSOK standard.

Traceability All welds should be identified by unique numbers. The shop drawings shall contain enough information to enable correct selection of WPS. Minimum information needed is material type/grade and grouping number (ISO/TR 15608), dimension (outside diameter and wall thickness), PWHT requirement.

Traceability All welds should be identified by unique numbers. All pipes, fittings and welding consumables should be colour coded according to Annex D. All welding consumables shall have individual marking.

Traceability From NORSOK M-101:: The fabricator shall apply a weld numbering system for identification on all shop drawings and as reference in all documentation. Welding shall be carried out in accordance with the WPS and applicable drawings.

Traceability The inspection category shall be decided by the designer in accordance with NORSOK N-004, and shall be specified on the design drawings.

Traceability Requires that a system for identification has been implemented BUT--- that means that the identification must be maintained through the production process

Traceability Ex. PLATE Plate is documented through a Material Certificate  However that plate comes from a Batch no Produced at one Furnace at a given factory When the plate is cut-- the all parts has to be traced back to the plate  And the remaining plate to be identified

Traceability Then we need to know where the parts have been used in the construction We have to know which weld numbers are joining the parts And we need to know which WPS has been used for each of the welds

Traceability We need to know which welder(s) was welding that weld We need to know when it was welded We need to know the result of the inspection beiing carrried out

Documentation In order to fullfill the traceability we have to create a proper documentation that we can use as a proof of our work. We can create the documentation in two different ways

Documentation A. Positive documentation--- that means we create documents for everything we are doing in form of reports That means if the inspection is OK we make a report saying that the results is OK

Documentation B. Negative documentation-- that means we create reports in form of documents only when the findings are NOT OK. For findings that are positive, or OK, we sign off that the finding was ok and that it has been carried out according a standard procedure specified in detail by the company

Documentation Documentation is vital for establishing a good relationship with the customer Documentation should be followed up so that the required documentation can be delivered together with the product delivery