20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Remote access to PVSS projects and security issues DCS computing related issues Peter Chochula.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
WP6: Grid Authorization Service Review meeting in Berlin, March 8 th 2004 Marcin Adamski Michał Chmielewski Sergiusz Fonrobert Jarek Nabrzyski Tomasz Nowocień.
Framework for Automated Builds Natalia Ratnikova CHEP’03.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
UNICOS-PVSS evolution Hervé Milcent (EN-ICE-SCD) 06/09/2010.
1 Responsibilities & Planning DCS WS L.Jirdén.
Peter Chochula DCS Remote Access and Access Control Peter Chochula.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
Naming and Code Conventions for ALICE DCS (1st thoughts)
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Progress report Collaboration meeting 23-SEP-2009
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Company small business cloud solution Client UNIVERSITY OF BEDFORDSHIRE.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
23/2/2000Status of GAUDI 1 P. Mato / CERN Computing meeting, LHCb Week 23 February 2000.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
July 19, 2004Joint Techs – Columbus, OH Network Performance Advisor Tanya M. Brethour NLANR/DAST.
External Data and DIP Oliver Holme 18 th January 2008.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
3rd June 2004JCOP CCB Meeting1 JCOP Activities and News JCOP FW PVSS Scaling Up DSS GCS Rack Monitoring, Control and Safety (RMCSS) Miscellaneous.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
PVSS an industrial tool for slow control
SCADA Selection and Usage at CERN
Supervision Miniworkshop JCOP Workshop 2015
WinCC-OA Upgrades in LHCb.
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions

20th September 2004ALICE DCS Meeting2 Framework News FW redesigned during 2003 and compatible with PVSSII v3 (FW 2)  On request, and with the participation, of all LHC experiments FW 2 is not compatible with FW 1 or PVSSII or earlier Redesign to simplify configuration and to improve performance First release in Feb 2004 Regular releases since (~monthly) Current version FW 2.09

20th September 2004ALICE DCS Meeting3 Core  FSM: Redesigned version released Hierarchy improvements and increased flexibility (CMS request) Trend tree and configuration DB require modification to be compatible  Configs Completing implementation of performance improvement  Mass configuration Concept and prototype presented and agreed at FWWG New iteration needed to finish (end of October) Devices  Wiener Automatic generation of OPC config file implemented  CAEN EASY system implemented started Needs further clarification with company Some problems with generic OPC server  ISEG First release produced by Sorina Still major problems with OPC server  Rack Monitoring and Control First version ready Needs to be tested with TS/EL PLC software Needs formal agreement in FWWG Compatible with EMDB used by ATLAS, CMS and LHCb Framework Latest Developments

20th September 2004ALICE DCS Meeting4 Tools  Trending tool Adding XY plots (some limitations due to current PVSS bugs) Upgraded/tested to work in distributed systems Many improvements suggested by users have been implemented  Configuration DB Development frozen after next release (waiting for feedback) Mapping to user defined schema  DIP Driver Integration with PVSS complete Being prepared for release  Access control Work re-starting on this component Development  Help Concept agreed: Overview (essentially course material) + reference manual type help for panels and libraries Format for reference help panels agreed in FWWG Framework Latest Developments

20th September 2004ALICE DCS Meeting5 Framework Future Work Collecting requirements for:  Alarm system  Data visualisation  Other miscellaneous items First input from Control Co-ordinators These requirements will need further discussion in FWWG

20th September 2004ALICE DCS Meeting6 PVSS Scaling Up - I Showstopper Tests: “Showstopper” stress tests completed by end June 2004 as planned. Presentation made to JCOP on 22 nd July was well received. PVSS behaves very well indeed and our understanding is much improved.  No design features were found which would prevent the building of large systems.  Many of the minor bugs reported in last 12 months have been fixed in new V3.0 Release (especially in the area of Alarm reporting)

20th September 2004ALICE DCS Meeting7 PVSS Scaling Up - II Ethernet Stress: Collaborating with Peter to investigate and understand the consequences to PVSS of external interference. Introducing deliberate “Ethernet stress” on a private network.

20th September 2004ALICE DCS Meeting8 PVSS Scaling Up - III Optimisation testing: Experiments now invited to specify realistic and relevant scenarios for optimisation tests. Optimisation tests will be used to help determine better configurations. Working towards producing a recommendations document for best configurations

20th September 2004ALICE DCS Meeting9 Front-end News OPC Servers  ISEG After > 2years, and versions, ISEG has still not been able to provide a stable OPC server!  Wiener The Wiener OPC server is progressing better but still has bugs. New release (1.007) received this week – under testing  For both ISEG and Wiener we are finding bugs that should have been found by the company  Cannot continue to invest this level of effort into testing substandard products (applies really only to ISEG now)  CAEN There have been various problems with CAEN systems – lost of communication, OPC crashes. These are being investigated but are not yet understood!

20th September 2004ALICE DCS Meeting10 PVSS News - I PVSSII v3 released in March 2004 Major improvements over were:  Increased robustness and stability  Improved performance  Simplified distributed system configuration and local dp containers  New AES  Remote installable client  Mass parameterization  ModBus TCP/IP driver Latest version PVSS II 3.01 SP1 is available

20th September 2004ALICE DCS Meeting11 PVSS News - II Meeting with ETM 14 th /14 th September Many issues discussed in a constructive atmosphere New intermediate releases to include:  Oracle archiving  Siemens S7 driver Major new developments planned with next versions:  Improved security between PVSS managers (SSL)  Improved alarm handling (avalanche handling + alarm delay)  JAVA thin client  Use of new compilers gcc and VisualStudio 7.1  Identification of invalid data in trend  Dynamic building of name space  VCR facility  Simple XML-based communications protocol  Improved PARA module for Linux

20th September 2004ALICE DCS Meeting12 Security and S/W Deployment Computer Network and Infrastructure for Controls (CBIC) working group started:  Define plan of work to cover development of o/s system and networking tools,  Define rules and policies for connection of equipment,  Define rules, policies and mechanisms for inter-domain and Internet communications,  Document all domains and ensure responsibilities designated,  Investigate technical means to ensure compliance.