Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Trainers Notes This package provides an overview of the major issues likely to impact on Group Training Organisations with the Introduction of the new.
SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Barhale Procedure for Site Establishment
JOB ORDER CONTRACTING Contract Management Department 8/28/121.
Site Safety Visitors Induction
Welcome to Online OHS All your OH&S needs in one easy to follow database system.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Header and footer basics Add page numbers, date, and more Think of page formatting in a book. The book title is at the top of one page, the chapter title.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
PROCEDURES FOR SELECTING THE CONTRACTOR
UK’s CDM Regulations 2007 and its Applications in Singapore
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
May 2013 Improving Safety A Contractors View. Who are Finning 2.
© University of Reading Dec 2009 Health and Safety Induction For Excavation Works University of Reading.
Hoist Slings Considerations on the management of hoist sling.
Construction Health and Safety Management By Dr Simon Smith – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike License.
Joint ACAC/ACI Seminar on Certification of Aerodromes Marrakech, 5–6 September 2003 David Gamper, Director, Technical/Safety Airports Council International.
Engineering Health, Safety & Environmental
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Construction HSE Guideline _ 2005
Health and Safety Policy
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Operations Defining Operations What about Quality Planning your Operations Laws and Regulations Health & Safety Regulations.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Design Question 6 What will I do to establish and maintain classroom rules and procedures? Page 199.
PMP1 Taija Puolitaival Unitec 2012 Presenters Tony Bosnich Glenn Edmonds 2014.
Main Title Here Additional copy here, additional copy here, additional copy here, additional copy here, additional copy here. ADD YOUR WEB ADDRESS HERE.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.
Safety Management System
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Planning and Organising Two Plant and Equipment - Cranes- ConstructioConstru cc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich Glenn Edmonds.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
CDM Construction Design and Management
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Overview of ASME P Planning for Load Handling Activities
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Safety Management System Introduction to Safer Sphere Safety Management System Presentation Mike Forsyth RMaPS GradIOSH ICIOB Les Jones MIOSH CFIOSH.
SWT Construction partnering
The Design Team Carl James.
Desk Based Preconstruction – Planning
Temporary Works – P8 Project Practice.
Environmental Assessment
Planning and Organising Two Introduction to Construction Methodology
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Estimating Project Costs
Health and safety organization on construction site
Architectural Site Analysis
Temporary Works Co-ordination
COST PLANNING AND ESTIMATION
Health and Safety Induction
Click anywhere to get started…
Site Based Preconstruction – Enabling Work
From AS :   Part 4— Commissioning, operation and asset management
Presenter Tony Bosnich 2015
Health and Safety Staff meeting 9/7/18.
Health and Safety Induction
Presenter Tony Bosnich Oct 2015
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Planning and Organising Two Introduction to Construction Methodology
Main Title Here ADD YOUR WEB ADDRESS HERE
Presenter Tony Bosnich 2014
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Presentation transcript:

Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Out come Accept that all sites are unique Plan and set up site establishment accordingly >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Every site is unique but generally it is a matter of using a check list type of approach details based on historical details relating to similar projects. What are some of the items you would consider on your check list. Write down ten items. What do we need in order to carry out this project successfully. >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Public protection Survey and set out Fences Access gates Signage Hazard Board Craneage Other lifting provision Temporary works Special formwork Site hut establishment Special false work Loading in platform Road Load bay Storage Set down area Wheel wash provision Site assembly area Silt pond Temp fire fighting provision Temporary weather proofing Temporary services Temporary access provision Traffic control Scaffolding Plant and equipment Any others to add? Here are some, >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT What are the site set up Elements of this Picture? Public protection Traffic plan Signage Scaffolding Environmental Hoardings Look at this site >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT But as part of the site set up some items will be soft. Safety plan PPE Quality plan Communication system Insurances Planning /Programming Method statements Computer set up Agreements, contracts Copier Site rules and requirements Documents Inductions Sub contractor provision Crane and plant booking arrangements Plant maintenance and testing provision Any others ? These are all considered to be hard physical items. >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT There maybe be an area allocated for site establishment by the consultants. Note also most buildings actually cover the whole site now, so the trend now is to remove MC main site establishment to exterior of site. Most of the requirements will have already been established based on your pre contract planning, and usually only one site visit. What is the main reason for including site set up details in the pre contract planning. Where do we do this set up. >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT There are no details drawn by any consultant as this is a P&G items and it is up to the Main contractor how they want to set up the site, hence it is not a detailed measured item. Where to start? Clear Site plan to suitable scale Existing details >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER