Things go in and things go out..  Your building will need both roll-up doors for truck access and swinging doors for human access.  For the roll-up.

Slides:



Advertisements
Similar presentations
Heat Loss Comparison: Doors and Windows Adam Piepgrass ME 340 Section 2 Winter 2010.
Advertisements

TRUCK COMPANY OPS Truck company operations are tasks that support the fire attack. Often called Support Functions The engine companies put the fire out.
Assignment: Draw the four elevations of your building
Maximizing Your Productivity. Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt.
Sleeping Area and Bath Facilities
Chapter 11 General Service Areas Types of Service Areas Designed the laundry area Usually has a service entrance May have an ironing area May have a sewing.
EDT Floor Plan Design-Bedrooms1 Weekend Cabin Retreat Project Designing the Floor Plan - Bedrooms Sacramento City College EDT 300.
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
Two Point Perspective Directions Follow the power point through the steps to complete each perspective problem. Look for the lines that are blue for the.
Reducing Your Carbon Footprint By Shawn Esperti.  Every year the average citizen produces about 10 tons of carbon dioxide — enough to fill two Olympic.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Competency: Draw Floor Plans Objective: Determine door and window types.
Physics and Astronomy Outreach Program at the University of British Columbia Physics and Astronomy Outreach Program at the University of British Columbia.
Energy Conservation within walls. Energy conservation Energy cannot be created or destroyed but can simply be changed from one form to another. The more.
PASSIVE SOLAR DESIGN. Design Techniques
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Windows and Doors. Typically once the roofing material has been installed/completed the windows and doors are installed. It’s important to install these.
By: Dakota White.  Slides  Elements  Project Description  Client Survey  Bubble Diagram  Design Sketches  Code Considerations  Habitat for Humanity.
Electrical Wire Identification
Materials Ideas Plastic Lumber Soda Cans, Bottles, etc. Recycled Cotton Barn Wood Steel Bamboo Cork SunSlates (Solar roofing shingles) Concrete Tires Mud,
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Science Project Advice on how to reduce energy losses.
Barry is painting the exterior of a tube. The tube is shaped like a cylinder with the dimensions shown below. a. What is the surface area, in square inches,
Today’s lesson will focus on Energy Efficiency and Conservation. So, what do these terms mean? Renewable Energy 2.
Overhead View The overhead view shows the horseshoe style of seating that I would like for my classroom. I will walk through each of the different sections.
Today we’re going to learn more about Renewable Energy
Punch! Pro Platinum Home Design Adding Windows. Click on the Floor Tab, and then click on the Window icon. Your cursor will now have a little window attached.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
The Stock Market Game Power Point Presentation Directions: Economics: Mrs. Miret & Mrs. Galeri.
Payback time! 1. Lesson objectives  understand methods to reduce energy loss from the home.  understand how these methods work (the keyfacts).  understand.
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
Return to Home! Go To Next Slide! Return to Home! Go To Next Slide!
Building Construction
Путешествуй со мной и узнаешь, где я сегодня побывал.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
Energy loss in the home Insulation method including cost and saving
Siding, Gutters, and Windows
3 AREAS of RESIDENCE Sleeping-family sleeps, rests, and baths
Energy loss in the home Insulation method including cost and saving
Electrical Principles and Wiring Materials
Electrical Wire Identification
© 2015 Pearson Education, Inc.
Kiosk Discussion May 23, 2017.
Sleeping Area and Bath Facilities
Design of Overhead Transmission line
continued on next slide
WHAT IS RADON? It is a natural radioactive gas that you cannot see, smell or taste. Radon enters buildings by seeping in through cracks in foundations,
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Table 2 Please turn to page 315..
Electrical Wire Identification
Private Area Planning.
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
One Point & Two Point Perspective
CATEGORY ONE Enter category name on this slide..
Competency: Draw Floor Plans
Қош келдіңіздер!.
Competency: Draw Floor Plans
Automatic Sliding Doors Automatic Sliding Doors. MAK Automatic Doors offers a wide range of Automatic Doors,Rolling Shutters,Sliding Glass Doors,Swing.
Buying a New Home.
Информатика пән мұғалімі : Аитова Карима.
continued on next slide
> < > < ≥ ≤ Shot at 90% Larger Smaller Larger
continued on next slide
Garage Doors  A garage door is a large door on a garage that opens either manually or by an electric motor a garage door opener. Garage doors are frequently.
Presentation transcript:

Things go in and things go out.

 Your building will need both roll-up doors for truck access and swinging doors for human access.  For the roll-up door, go to and open the page for “Ribbed-Commercial Overhead Door Pricing”.  The door you will select will need to be 2” thick – 26 gauge steel with white aluminum backer.  The size will be 18’ x 14’.  You will want the door to contain no windows.  You will need 2 of these doors.

 For the entry doors to your building, you will need to go to  You will need to purchase 3 of the following doors.  Model # UWHG3680R

 Using either Home Depot or Lowes, look for insulated sliding windows.  You will need 5 windows, each measuring a minimum of 3 feet high and 4 feet wide.  The larger the window, the more light will enter the building, but the greater the heat loss.