April 10 2008CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.

Slides:



Advertisements
Similar presentations
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Advertisements

The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 (Not just) Backplane transmission options.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Trigger A front end chip for SLHC CMS strip tracker IN2P3 microelectronic Summer School Frejus, June 2011  Concept of Silicon strip Pt-module.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
J. Varela, LIP Lisbon Report from the Calorimeter Trigger Review 1 Report from the Calorimeter Trigger Upgrade Review João Varela LIP on behalf of the.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
ATLAS upgrades Xmass meeting Current ATLAS Operations ATLAS has been working very well  First beams in Sept recorded successfully by all sub- detectors.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
LHCb front-end electronics and its interface to the DAQ.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
ATLAS Trigger Development
12 th Workshop on Electronics for LHC experiments - Valencia- 25 th - 29 th Sept. 2006Gilles MAHOUT Production Test Rig for the ATLAS Level-1 Calorimeter.
ATLAS TDAQ RoI Builder and the Level 2 Supervisor system R. E. Blair, J. Dawson, G. Drake, W. Haberichter, J. Schlereth, M. Abolins, Y. Ermoline, B. G.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
JET Algorithm Attila Hidvégi. Overview FIO scan in crate environment JET Algorithm –Hardware tests (on JEM 0.2) –Results and problems –Some VHDL tips.
A Fast Hardware Tracker for the ATLAS Trigger System A Fast Hardware Tracker for the ATLAS Trigger System Mark Neubauer 1, Laura Sartori 2 1 University.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
ATLAS calorimeter and topological trigger upgrades for Phase 1
Present System Back-end Front End PMT ROS Optical links ADC Pipeline
J. R. A Booth, D. G. Charlton, C. J. Curtis, P. J. W. Faulkner, S
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Run-2  Phase-1  Phase-2 Uli / Mainz
Example of DAQ Trigger issues for the SoLID experiment
ATLAS: Level-1 Calorimeter Trigger
L1Calo Joint Meeting Introduction
John Harvey CERN EP/LBC July 24, 2001
Commissioning of the ALICE-PHOS trigger
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
(Not just) Backplane transmission options
Presentation transcript:

April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade n The ATLAS L1 calo upgrade discussions are still in an early stage n We had a first dedicated upgrade meeting in January n We are now in the process of formulating an EoI n Aiming at a R&D proposal late this year

April CMS Trigger Upgrade Workshop - Paris2 The present L1 calo trigger is now operational n Few details remain n Much effort has gone into the production, installation and commissioning n Much work with cabling n Up to now the emphasis has been on the initial system operational n Upgrade work only started recently

April CMS Trigger Upgrade Workshop - Paris3 ATLAS TDAQ Overview CALOMUONTRACKING Pipeline memories Derandomizers Readout drivers (RODs) Full event buffers and processor sub-farms Event builders Level 1 trigger Level 2 trigger Event filter Region of interest CTP calo muon Data recording

April CMS Trigger Upgrade Workshop - Paris4 The upgrade plans are driven by n Physics - need for a non-trivial increase of the L1 trigger rejection rate with about a factor of 10, since the L1 accept rate can not be easily increased. n Technology - the availability of higher performance components such as larger and faster FPGAs, higher bandwidth transmission links and new backplane technologies n Machine parameters – bunch crossing rate, luminosity, … n Costs n Subdetector plans: possibility of full readout of all calorimeter data, track trigger, etc. n Experience from present trigger construction

April CMS Trigger Upgrade Workshop - Paris5 Increasing the rejection rate n For a non-trivial increase of the rejection rate we need more information such as: n higher granularity and depth segmented ECAL data, n depth segmented HCAL data, n tracker information n We probably need topological trigger algorithms n We need a larger parameter space for the central TP – more threshold levels etc. n And we may get: n Digital input data extracted from the DAQ stream possibly with n Higher resolution n But first and foremost we need SIMULATIONS to guide our decisions

April CMS Trigger Upgrade Workshop - Paris6 Changing design parameters The calorimeter sample rate will probably stay the same which has a major impact on the design – the bunch crossing rate less so. Longer latency allowing more complex algorithms – one  s in the L1 trigger doubles the available processing time If full readout of all calorimeter data is chosen it requires high capacity trigger preprocessors probably near the Read-Out Drivers producing data streams to the L1 trigger and to the L2 and DAQ Large # high capacity links needed – The GTB is one promising candidate for RO and DC but other alternatives exist

April CMS Trigger Upgrade Workshop - Paris7 Possible future ATLAS TDAQ Overview CALOMUONTRACKING Level 1 preprocessors Readout drivers (RODs) Full event buffers and processor sub-farms Event builders Level 1 trigger Level 2 trigger Event filter Level 1.5 trigger CTP calo muon Data recording Pipeline memories

April CMS Trigger Upgrade Workshop - Paris8 Technology considerations 1 Decision to switch from ASICS to FPGAs has allowed many short and late design cycles - try to avoid unnecessary ASICs in SLHC L1 trigger as well The use of multi purpose components (boards and backplanes) has proven successful - will be a guiding principle in the SLHC design The higher FPGA complexity and higher clock rates will allow greater flexibility in choice of algorithms – but, this flexibility will be constrained by the chosen connectivity If it is decided to bring all calo data to the counting room a huge total bandwidth is required – a large # of fast fiber links – present design new design with full readout needs

April CMS Trigger Upgrade Workshop - Paris9 Technology considerations 2 FPGAs SERDES allow ~ 6Gb/s but there are telecom components that deliver higher performance Wavelength multiplexing techniques can greatly reduce # fibers – simplifies cabling Clock distribution ´between modules a challenge – GBT one possibility Many combinations to investigate

April CMS Trigger Upgrade Workshop - Paris10 Logistics issues Managing and sharing firmware designs between developers and institutes Early development of complicated algorithms for future hardware Evaluating new firmware design tools

April CMS Trigger Upgrade Workshop - Paris11 Different Scenarios Do nothing Must be verified that present system is not adequate at SLHC Small scale changes Similar architecture but with digital transmission Larger changes Increased granularity depth segmentation Radical redesigns New trigger sources – e.g. track trigger

April CMS Trigger Upgrade Workshop - Paris12 Possible R&D program Stage 1 – generic – low cost and short time scale Evaluate new FADC front end processing Faster generic processor module with current architecture Small link technology test boards Algorithm analysis for high granularity data Stage 2 – specific – higher costs and longer time scale Build demonstrator system in new technology crate environment Develop interface with calorimeter preprocessor

April CMS Trigger Upgrade Workshop - Paris13 SLHC L1 collaborators From the L1 calo trigger: University of Birmingham, UKContact: Dave Charlton University of Heidelberg, GermanyContact: Karlheinz Meier University of Mainz, Germany Contact: Stephan Tapprogge Queen Mary, University of London, UKContact: Eric Eisenhandler Stockholm UniversityContact: Christian Bohm Rutherford Appleton Laboratory, UKContact: Norman Gee New groups: Michigan State University, USAContact: Maris Abolins Argonne National Laboratory, USAContact: Bob Blair

April CMS Trigger Upgrade Workshop - Paris14 SLHC Development projects Multi-Gigabit links, Timing Distribution, Algorithm Firmware (Stockholm) Clock Jitter reduction, JEM emulation, Offline simulation (Mainz) High-speed design technologies, Algorithms, Architecture, Offline Simulation (Birmingham, QMUL, RAL) Digitization and signal processing technologies (Heidelberg) General purpose trigger evaluation board ( Michigan)

April CMS Trigger Upgrade Workshop - Paris15 Conclusions A large design phase space but many constraints Close collaboration with calorimeters needed Regular ATLAS – CMS trigger discussion may be useful (RD27)