DRAFT POES-GOES-GPS Blended TPW Products July ??, 2008 Preliminary Design Review.

Slides:



Advertisements
Similar presentations
Conversion of CPC Monitoring and Forecast Products to GIS Format Viviane Silva Lloyd Thomas, Mike Halpert and Wayne Higgins.
Advertisements

V14.1 Jun SPSRB Project Plan on Polar-Geo Blended Hydrometeorological Products Presenter: Limin Zhao (OSPO) Project Lead: Limin Zhao (OSPO) Project.
Presented by Limin Zhao, Stan Kidder, and ??????.
Status of Operational Implementation of MIRS V2.0 at OSDPD Limin Zhao, Aiwu Li and Jiang Zhao April 18, 2008.
LAPS Analysis & Software by Steve Albers. 2 Basic Solution LAPS coupled with MM5 NWP model Use diabatic initialization (“hot start”) Utilize parallel.
The Climate Prediction Center Rainfall Estimation Algorithm Version 2 Tim Love -- RSIS/CPC.
Gary Jedlovec Evolution SPoRT Products to End Users History and SPoRT paradigm Selected product examples Future products transitioning unique NASA data.
V15 7 Apr SPSRB Project Plan Template Instructions / Guidance A SPSRB goal is for “every funded product development effort responding to a user.
Recent Progress on High Impact Weather Forecast with GOES ‐ R and Advanced IR Soundings Jun Li 1, Jinlong Li 1, Jing Zheng 1, Tim Schmit 2, and Hui Liu.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Science Challenges: Streamline the process to ensure products are operational.
Netcen 14. UK Experience of Implementing the UNFCCC CRF Reporter John Watterson & Melissa Downes.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
Environmental Satellite Product and Distribution System (ESPDS) GOES-R Access Subsystem (GAS) John Linn ESPDS System Engineering 7 October 2009.
September 23-24, 2014Dawn Conway, AMSR-E / AMSR2 TLSCF Lead Software Engineer AMSR-E / AMSR2 Team Lead Science Computing Facility TLSCF at UAH Dr. Roy.
The Evaluation of a Passive Microwave-Based Satellite Rainfall Estimation Algorithm with an IR-Based Algorithm at Short time Scales Robert Joyce RS Information.
AMSR2 Report Stan Kidder 8/27/ Overview AMSR2 data is fully implemented at CIRA The next two slides show the AMSR2 RR and TPW. 2.
1 Status of NERON/HCN-M for The Committee for Climate Analysis, Monitoring, and Services (CCAMS) John Hahn NWS Office of Science and Technology.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
NOAA Satellite Proving Ground/User Readiness Meeting
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1 SPSRB Decision Brief on Retiring “Product Name” Date Presenter: V4 July 22, 2015 Guidance can be found on the note pages. Delete this banner when submitting.
1 CCOS Update November 3, 2006 PC Meeting Project Status –Completed Projects Results –On-Going Projects Status Plan for CCOS Final Phase –Guiding Principles.
Towards Long-Term Archiving of NASA HDF-EOS and HDF Data Data Maps and the Use of Mark-Up Language Ruth Duerr, Mike Folk, Muqun Yang, Chris Lynnes, Peter.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Precipitation Estimation from Remotely Sensed Information using Artificial Neural Networks (PERSIANN) Kuolin Hsu, Yang Hong, Dan Braithwaite, Xiaogang.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 POES Microwave Products Presented.
HDF-EOS at NOAA/NESDIS NOAA / NESDIS / ORA orbit-net.nesdis.noaa.gov/arad2/MSPPS Huan Meng, Doug Moore, Limin Zhao, Ralph Ferraro NOAA / NESDIS.
Operational Issues from NCDC Perspective Steve Del Greco, Brian Nelson, Dongsoo Kim NOAA/NESDIS/NCDC Dongjun Seo – NOAA/NWS/OHD 1 st Q2 Workshop Archive,
AMSR-E Ocean Rainfall Algorithm Status AMSR-E Science Team Meeting Huntsville, AL 2-3 June, 2010 C. Kummerow Colorado State University.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
1 An Integrated Look at the Hydrology Program Donna Page 25 Feb HIC/ARC Meeting.
OPC Anticipated Operational Impacts During NESDIS CIP Invocation Fall 2009 COPC Meeting Allan Darling.
Refinement and Evaluation of Automated High-Resolution Ensemble-Based Hazard Detection Guidance Tools for Transition to NWS Operations Kick off JNTP project.
5-6 June 2008CEOS Precipitation Constellation Workshop – Tokyo, Japan NOAA Status Report to the CEOS Precipitation Constellation Ralph Ferraro Center for.
CIRA / SPoRT Update 10/31/12 1 Update: “A Multisensor 4-D Blended Water Vapor Product for Weather Forecasting” Stan Kidder John Forsythe Andy Jones.
1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSPO SPSD Division.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
AMSR-E Ocean Rainfall Algorithm Status AMSR-E Science Team Meeting Asheville, NC June, 2011 C. Kummerow Colorado State University.
1 Final Report on WTF-CEOP JAXA Prototype system Satoko Horiyama MIURA JAXA/Earth Observation Research Center.
Layered Water Vapor Quick Guide by NASA / SPoRT and CIRA Why is the Layered Water Vapor Product important? Water vapor is essential for creating clouds,
V7 July 22, Analysis of Alternatives Decision Brief to the SPSRB Instructions / Guidance This template will be used by NESDIS personnel to present.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Applications of AMSU-Based Hydrological Products for Climate Studies Ralph.
AHPS Update HIC Meeting July 11, AHPS Update NRC AHPS Report NRC AHPS Report FY07 Planning FY07 Planning Program Execution and Tracking Program.
 Establishing state-of-the-art coding, documentation, configuration management standards for the AWG.  Software development process comparable with CMMI.
IPWG, 4 th Workshop, Beijing, October UPDATE ON THE STATUS OF PRECIPITATION PRODUCTS IN THE EUMETSAT SATELLITE APPLICATION FACILITY ON HYDROLOGY.
V1 November 12, Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
NOAA’s response strategy to the Hurricane Intensity Research Working Group (HIRWG) and related recommendations Greg Mandt NOAA NWS Office of Science and.
Zou Ziming 1 Ma Wenzhen Li Lei Zhao Hua Wang Chi 1: Center for Space Science and Applied Research Chinese Academy of Sciences Moscow ·
Rapid Update Cycle-RUC. RUC A major issue is how to assimilate and use the rapidly increasing array of offtime or continuous observations (not a 00.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
RICO DATA MANAGEMENT Steve Williams and Scot Loehrer UCAR/Joint Office for Science Support (JOSS) Boulder, Colorado RICO Workshop Boulder, CO February.
1 NWS Digital Services American Meteorological Society Annual Partners Meeting San Diego, CA January 13, 2005 LeRoy Spayd National Weather Service Office.
1 National Centers for Environmental Prediction: Where America’s Climate and Weather Services Begin Louis W. Uccellini Director, NCEP January 28, 2004.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
NOAA, May 2015 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group for Meteorological.
AHPS Program Plan FY07 Update. AHPS Program Plan Document Purpose  Provide an overview of AHPS and serve as a guide for the AHPS program  Defines in.
Transition of Science Algorithms into Enterprise Product Generation Operations 2016 AMS Annual Meeting Dylan Powell, Ph.D. Lockheed Martin ESPDS Science.
22 nd Operational-MIRS Meeting October 31 st 2008.
CGMS-43-NOAA-WP-25 Coordination Group for Meteorological Satellites - CGMS NOAA Use of Soil Moisture Products Presented to CGMS-43 Working Group 2 session,
Implementation Review Team Meeting
<workgroup name>
Maj Dan Pawlak Air Force Liaison to NCEP
Average Monthly Temperature and Rainfall
Update on New NSDS Guidelines
AMSR-E Ocean Rainfall Algorithm Status
CYCLE 2019 Application Process & Timeline
Presentation transcript:

DRAFT POES-GOES-GPS Blended TPW Products July ??, 2008 Preliminary Design Review

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 2 July ??, 2008 Outline Team Members Product Overview Project Requirements System Design Quality Assurance Documentation Project Timeline Issues To Be Resolved

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 3 July ??, 2008 Team Members Limin Zhao, John Paquette and Stan Kidder  Project Leads Andy Jones and John Forsythe  Lead Scientists Ivan Tcherednitchenko  Lead Developer Peter Keehn  System Implementer ??????  User Team(?) ??????  POP Lead (?)

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 4 July ??, 2008 Product Overview (1) TPW Product  Over water: Blended AMSU & SSM/I (Kidder & Jones 2007)  Over land (primarily CONUS): Primary: GPS PW (Ref?) Backup: GOES PW (Ref?) 0 mm 25 mm50 mm 75 mm Total Precipitable Water

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 5 July ??, 2008 Product Overview (2) Percent of Normal TPW Product  TPW divided by NVAP weekly normal TPW (Ref?) 100% 0% 200% Percent of Normal TPW

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 6 July ??, 2008 Product Overview (3) Products produced every 6 hr, nominally at 00, 06, 12, and 18 UTC Map: Mercator, 71°N to 71°S, 16 km resolution at equator Each product is about 3.5 Mbytes in size (28 Mbytes per day) Input data:  5 days of AMSU and SSM/I data (? Mbytes)  most current GPS PW and GOES PW (? Mbytes) Output data  HDF-EOS format  McIDAS format  AWIPS format

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 7 July ??, 2008 Project Requirements SPSRB  # POES/DMSP Blended Products: Generate operational blended TPW and RR products from POES and DMSP sensors Others  OSIP  NWS OB9  User requests fromn varous WFOs  NOAA’s Hydrometeorological Testbed (HMT)  NOAA’s Scientific Data Stewardship (SDS) program Proposed products satisfy all requirements

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 8 July ??, 2008 System Design Products will be generated at NSOF AIX Machine will host Input data:  AMSU and SSM/I data acquired from DDS  GPS data acquired from ???  GOES PW data acquired from ??? Output data (in ??? format) hosted on DDS Output fields converted to AWIPS format and distributed by NOAAPORT (???) (I’m sure I’m leaving things out)

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 9 July ??, 2008 Quality Assurance By CIRA/StAR/SAB?

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 10 July ??, 2008 Documentation Document 1—written by ? Document 2—written by ? …

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 11 July ??, 2008 Project Timeline (1) Mar 08: Development Phase Begins  Mar 08: IPT Branch Lead informed to begin product development  Mar 08: Initial Archive Requirements identified  Mar 08: Quality Monitoring Concept Defined  Mar 08: Static test data file provided to NWS/AWIPS (OB9.x)  May 08: Long-term Maintenance Concept Defined  Jun 08: Preliminary Design Review  Jun 08: Development processing system defined  Sep 08: Critical Design Review  Oct 08: Code is prepared for implementation  Oct 08: Final Archive requirements identified  Oct 08: Operational and backup processing defined

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 12 July ??, 2008 July 08: Pre-operational Phase Begins  July 08: Pre-operational product output evaluated & tested  July 08: Final/Streaming product delivered to NWS/AWIPS  Nov 08: Operational and backup processing capabilities in place  Nov 08: Final IT Security Concept Defined  Jan 09: Code transitions to operations; all documentation is complete  Jan 08: Operational and backup capabilities reach ops status  Jan 09: Brief SPSRB capability is ready to operational Feb 09: Operational Phase Begins  Feb 09: SPSRB declares product operational SPSRB Secretaries/manager update the SPSRB product metrics web pages OSD updates Satellite Products database Back to Index Project Timeline (2)

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 13 July ??, 2008 Issues To Be Resolved Porting DPEAS to AIX

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 14 July ??, 2008 Backup Slides

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 15 July ??, 2008 Outline Project Overview (Limin and Stan) Project Management Overview and Planning (Limin) AWIPS Requirements (John P) DPEAS (Andy) Operational System Design and Development (Limin and Andy) Processing System Infrastructure (Ivan and Limin) Products and Validation Plans (Stan and John F ) QC Monitoring (Ivan and Limin) Operational Integration and Data Dissemination (Ivan and Peter) Summary (Limin)

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 16 July ??, 2008 Integrated Product Team Limin Zhao, John Paquette and Stan Kidder  Project Leads Andy Jones and John Forsythe  Lead Scientists Ivan Tcherednitchenko  Lead Developer Peter Keehn  System Implementer

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 17 July ??, 2008 Project Overview

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 18 July ??, 2008 Background Terminology Presentations Requirements Goals

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 19 July ??, 2008 Terminology Blended TPW – Blended TPW Normal – DPEAS – GRID - AWIPS – McIDAS -

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 20 July ??, 2008 Presentations PDR  July 8, 2007 CDR  Sept 2008

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 21 July ??, 2008 Requirements Documentation NWS requests SBSRB requirements document

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 22 July ??, 2008 NWS Requirements Document Title: POES-GOES Blended Hydrometeorological Products Product specifications / needs: Atmospheric temperature and moisture profiles from IASI, AMSU-A and MHS. Data Latency: 0.5 ~ 3.0 hrs. Refresh: per 6 hours (possibly 3 hourly). Timeliness (e.g., how soon after observation is product needed?): 0.5 ~ 3.0 hrs

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 23 July ??, 2008 Project Goals Provide users the blended TPW from AMSU, SSMI and GPS. Provide updated blended products by merging data from more sensors, such as, AMSR-E, TRMM, … Provide blended RR products

PRELIMINARY DESIGN REVIEW POES-GOES-GPS Blended TPW Products DRAFT 24 July ??, 2008 POES/GOES Blended Hydro Products Blended TPW Blended TPW Normal Blended RR