Outline: Brief review Splitting of input signals Status of 2A system before and after splitting Status of 2B system after splitting Status of monitoring.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
DCZ status & results B A B AR Trigger Workshop, December 2004 Jamie Boyd University of Bristol for the Trigger Upgrade Group.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
Data and Computer Communications Chapter 8 – Multiplexing
Outline: Current status Active splitter Plan Chris Neu, Daniel Whiteson, Rick Van Berg L2 Upgrade Meeting 11 June 2004 XCES Input Path: Status.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
Pulsar System Overview and Commissioning Plan Cheng-Ju Lin Fermilab Installation Readiness Review 02/08/2005 Outline: - Items from last review - Pulsar.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Outline: Brief review Splitting of input signals Status of monitoring Plan Christopher Neu, Daniel Whiteson L2 Upgrade Installation Readiness Review 27.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
IC 3 BASICS, Internet and Computing Core Certification Computing Fundamentals Lesson 1 What Is a Computer?
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Electron Trigger in PHENIX Kenta Shigaki (KEK) at PHENIX Heavy Flavor and Light Vector Meson Physics Working Group Meeting on March 9, 2000.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Initial check-out of Pulsar prototypes
CLAS12 DAQ & Trigger Status
Injectors BLM system: PS Ring installation at EYETS
Pulsar WG Meeting (C-J Lin)
ALICE Muon Tracking Upgrade EDR Answers
Scott D. Metzler California Institute of Technology
Characterizing FOX Demonstrator Test Setups for LArDPS to FEX Modules at CERN RuthAnn Gregory.
Example of DAQ Trigger issues for the SoLID experiment
TTC news December 04 Sophie Baron TTC.
Pierluigi Paolucci & Giovanni Polese
ECE 352 Digital System Fundamentals
Presentation transcript:

Outline: Brief review Splitting of input signals Status of 2A system before and after splitting Status of 2B system after splitting Status of monitoring The future of split signals Christopher Neu L2 Upgrade Second Installation Readiness Review 9 February 2005 Status of Optical Splitting for ShowerMax Input Path

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 2 XCES Input Path: Description of Run 2A System Shower Maximum (CES) data used in L2 to reduce trigger rates for electron and photon triggers reduces detector background from single-phototube discharge track-matching to shower max reduces combinatoric background for electrons CES detector: within CEM calorimetry 32 wires at |z| 200cm for each wedge CES charged pulse -> digitized -> 4 neighboring wires are summed in some time slice(4 CDF clocks): 16 wire groups per wedge Compare sum to low and high thresholds: T low = 1.5 GeV, T high = 3 GeV (changed in ~May) Low and high trigger bits are set if wire group sum exceeds threshold 16 wire groups x 2 thresholds = 32 data bits per wedge/evt (called XCES bits) Data flow: SMXR board performs sum and threshold comparison; one SMXR per wedge Single fiber transmits 32 data + 8 for buffer # = 40 total bits from each wedge/evt 48 total cal wedges => 48 XCES fibers into L2 4 RECES boards accept these 48 fibers; use Taxi technology; latch according to L2 buffer RECES boards are aux cards in L2 decision crate (b0l2de00) Alpha reads out XCES bits when needed (for L2 decision making and/or when making TL2D)

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 3 Splitting XCES Input Channels Optical splitting problem: –Existing XCES channels driven by TAXI protocol through Agilent optical drivers Significant spread of optical power across system –Optical splitting easy solution is passive splitter Simple prism But incurs 1-to-2 -3dBm optical strength hit (50% reduction in signal power) –Many (about half) of the 48 input channels are too weak to split passively Need for an optical splitter that drives its outputs without significant loss Looked for commercial product – but found nothing that matched our needs (somewhat meager compared to bandwidth of typical current applications) West 1 West 2 East 1 East 2 ch dBm } → Penn designed and built a simple active optical splitter to accommodate all the XCES channels. Details can be found in litter.jpg and CDF 7152

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 4 Active Splitter: Implementation The active splitter boards reside in a custom- built crate in rack 2RR31C 15 slots Power provided by two 5V, 20A Lambda supplies Fully driven (15 boards) current draw and power: –-5V: 10.5A –+5V: 600mA –55.5W total dissipated Each supply is fused independently Power supplies are monitored with standard CDF PSM tool Dervin was a tremendous help getting the multitude of fibers routed into and out of the tight space (48 in + 96 out = 144 in 19”x6” space)

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 5 Status of 2A Channels Before Splitting 2A system monitored with TrigMon This is run from March. Three figures of merit: Benchmarks: This run is somewhat not representative; other runs had channels with P_miss~0.01.

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 6 Status of 2A Channels Before Splitting Recall data collected on the 4- wire groups of the CES is compared against two thresholds (low and high) in forming the XCES trigger bits Red curve is data passing low XCES threshold, blue is high XCES threshold Missing bits can be seen as deviations from 100% efficiency in bottom plots Typical for runs in that era...

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 7 Current Splitter Configuration Several active splitters had problems splitting signals from certain XCES channels Mostly problems were identified as higher- than acceptable error rates in the 2A system. Cause is under investigation For commissioning we employ a few passive splitters…twelve of the 48 channels are passively split I do not like this configuration either But it is getting the job done – the goal was to be able to split the 48 channels – and we have that now Once commissioning is over and splitting is a luxury item is we can study how to recover these 12 channels…

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 8 Status of 2A Channels After Splitting Results for 2A system: Run – from last week All 48 channels split and within error benchmarks from April. There is one remaining outlier channel: E17, which corresponds to b0ccal13 slot5, which has been a chronic problem for some time. Tough to split and send to RECES card.

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 9 Status of 2A Channels After Splitting XCES efficiency versus ADC count – Similar performance as from April. This behavior is monitored for current runs by CO and offline by hand. The performance shown here is typical for the 2A system. Splitting for 2A system has been in place and behaving since the last week of December.

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 10 Status of 2B Channels After Splitting 2B system: Low error rate on a handful of channels: E_W ~ 10^-5 Others much smaller. Still measuring what this error rate really is…note 2A system had error rates up to of order 10^-3. E17 and its SMXR are a problem for 2B electronics too… Note P_miss is zero for all 2B channels. The XCES channels are much more robust with 2B electronics.

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 11 Review From 9/27 Review Major open issues, manpower and timeline: Present – Oct 15: - understand data integrity issues from beam runs - order jumper fibers - order jumper fibers Oct 15 – Nov 15: - complete AS modifications - test each card for VLTN and in system with L2 torture - test each card for VLTN and in system with L2 torture - system build-up - system build-up - finishing touches on XCES portion of PulsarMon and start running XCES monitoring online - finishing touches on XCES portion of PulsarMon and start running XCES monitoring online Nov. 15: - personal deadline for fully split 48 ShowerMax channels Nov. 15: - personal deadline for fully split 48 ShowerMax channels - monitoring complete and capable of running online - monitoring complete and capable of running online - consistent L2 testing - consistent L2 testing Nov. 22: - beam in the machine Nov. 22: - beam in the machine Dec. 1: - collisions Dec. 1: - collisions All these goals were met at the appropriate times. We had 48 split channels for the return of collisions in early December. Both the splitting and the monitoring evolved over the weeks since the end of shutdown as new problems were identified.

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 12 Spare Situation and General Hardware Maintenance Needs AS Boards – 14 are in system; we have 2 spare cards Fuses – we have through-hole fuses and I know where to get more – will have an essentially infinite supply PS’s – have several (~6) spares in case these fail or new ones are needed Crate power supplies – have one Lambda spare, need to purchase a second Crate fuses – These are available Spare jumper fibers – we have ~10 spare Spare input fibers – we have ~10 spare What we need:

February 9, 2005 L2 Upgrade ReviewChristopher Neu Penn/CDFPage 13 Summary and Future of Split Signals Splitting input signals was designed to enable us to commission the 2B system while the 2A system was taking data. We have shown that after splitting the 2A performance is no worse than before the splitters were inserted. We have also shown that the 2B electronics have a much lower error rate in apples-to-apples comparisons. Having a completely split system, while tedious to establish, has been a benefit for the upgrade: - allows completely parasitic testing and comparison to alpha+TL2D - allowed for easier diagnosis of board-dependent problems - allowed to test under realistic conditions - test-stand-like conditions – or anything which is not an exact replica of the real system – is not good enough The split signals minimally need to remain as long as we consider the alpha system to be a hot spare. After this mixed-operating-mode is over, one could continue to utilize the split signals to feed the default 2B trigger electronics and a “hot-spare” version of the trigger system.