Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Slides:



Advertisements
Similar presentations
Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics.
Advertisements

EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
RADWG-RADMON WORKSHOP SUMMARY TALK Emmanuel Tsesmelis TS/LEA 1 December 2004.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
Thermoluminescent dosimetry at the IFJ Krakow P. Bilski, B. Obryk INSTITUTE OF NUCLEAR PHYSICS (IFJ), KRAKÓW, POLAND RADMON, 15 February 2006.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:
FINDINGS AND CONCLUSIONS OF THE WORKING GROUP ON FUTURE IRRADIATION FACILITIES I. Efthymiopoulos, EN/MEF - for the Irradiation Facilities WG
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
1 Radiation worries in the cavern L.Jirdén
ALICE setup: update on the installation 18/10/2010 Angela Intermite.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development /
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Matters arising RADWG - 3 July 2009
Radiation monitoring and follow up during LHC commissioning
ELENA installation and commissioning status
2 Fraunhofer INT Euskirchen Germany
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
CMS November Upgrade Week
Integration – preliminary ideas on routing and tests
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
Compact readout unit for the EP-RADMON radiation monitoring sensors
Irradiation Facilities Questionnaire
Business opportunities related to CERN electrical network
Pierluigi Paolucci - I.N.F.N. Naples
Radiation Monitoring in LHC Experiments
Radiation tolerant fibres for LHC controls and communications
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,

Motivation to test equipment on site Exposure to LHC like radiation field Short turn around Pre selection of components facilitated Complete systems tests (crates) before installation RP issues

MC simulations ARC per Gy –1 x 10 8 to 1 x n > 100 keV –2 x 10 8 to 4 x 10 9 n > 20 MeV –2 x 10 8 to 2 x 10 9 n > 100 MeV CNGS per Gy –1 x n > 100 keV –5 x 10 9 n > 20 MeV Dose rates : CNGS : 1 to 150 Gy per week ARC-DS : 1 to 200 Gy per year

CNGS Radiation Test facility 5 x WorldFIP Cable –1 of which is for the RadMon installation 4 x Profibus Cable 8 x NE48 Cable –Cable request given to TS/EL (8 th Feb 2008) 2 x (6x monomode fibre optic tubes) –Request given to TS/EL/CF (12 th Feb 2008) 4 x SubD Cables 4 x Patch panel (test area) 1 x Rack (repeater station) 2 x Rack (Control room) Length of each cable is approx 1.2km (Around 28km in total)

Layout of facility Control room Area Signal repeater area Test area

Readout electronics in Bat

Signal repeaters Signal repeater area

CNGS underground Location of Radmon dosimeters Radiation test area

CNGS – 17 October January 2008TS-LEA group meeting9 TS Radiation Monitors

Location of RadMon devices (1) (2)(3) (4)(5) (6)

Location Signal Patch Panels Patch Panel 1 Patch Panel 2 Patch Panel 3 Patch Panel 4

Signal Cables 4 Patch panels Per Panel –2 x WorldFIP (1 for RadMon) –1 x Profibus –2 x “Burndy” NE48 –1 x SubD 9 Connector –6 x fiber optic connections (Only on Patch panel 1 and 2) –2 x 3 phase power supply –1 x multi-socket single phase

Patch Panels

Miniracks

Candidate equipment for testing in 2008 LHC power converter electronics (RR’s & UJ76) QPS electronics