Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1.

Slides:



Advertisements
Similar presentations
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
ILC Controls & Instrumentation R&D Activities at Fermilab G. Tassotto, M. Votava, M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, U.S.A.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
F Optical Transition Radiation (OTR) Detectors for Beam Diagnostics Vic Scarpine Instrumentation Department Accelerator Division Jan. 17, 2006.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
KEK-ATF – Fermilab Collaboration Ideas David Johnson, Alex H. Lumpkin, Vic Scarpine, Manfred Wendt, Fermilab Presented at SLAC January 10, 2011.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Working Group F: Diagnostics and Instrumentation for High-Intense Beams – Summary – Manfred Wendt for the Working Group F contributors 8/29/2008HB2008.
October, 2009 Internal Review Beam Instrumentation David Gassner.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
Marc Ross T9 – Snowmass 2001 Closing Plenary T9 – Diagnostics M. Ross/R. Pasquinelli Thursday, July 19 RD: 1) determine mixing between z and x/y 2) determine.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
Measurement of 400 MeV Proton Beam Intensity and Transmission Through Collimator of HPRF Cavity at Fermilab MuCool Test Area M. R. Jana 1, M. Chung 1,
Scintillating Fiber Profile Monitor The M-Test Experience Gianni Tassotto 112/15/2014.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
E-beam scanner experience at FNAL
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
Have a chance to operate your own beam at CERN
WG2 Summary: Diagnostics, measurements, and commissioning
High resolution profile measurements
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Electron Source Configuration
Linac Diagnostics Commissioning Experience
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1

Fermilab Hadron Activities Current HEP hadron accelerator activities –Tevatron: p -> pbar collider Run II (until September 2010) –NuMI: 120 GeV beam-line for neutrino experiments (290 kW) –8 GeV beam-line to MiniBooNE, microBooNE –Switchyard beam-lines, e.g. MTest Beam Instrumentation –Stripline or split-plate BPM pickups, Echotek-based digital read-out electronics in most areas. –Transverse beam profile/ emittance characterization using flying wires, IPMs, OTRs, multi-wires, SWICS, SyncLight (TeV),... –Longitudinal beam monitors (WCM, read-out by high speed oscilloscopes or digitizers) –Beam halo characterization (crawling wire) –Beam loss detection (ionization chamber, scintillators & PMT) 8/25/2008HB2008 WG F: Diagnostics2

Accelerators at Fermilab 8/25/2008HB2008 WG F: Diagnostics3 Main Injector: 4x GeV (2.2 sec) NuMI: ~300 kW beam power

Flying Wire Monitor Wire: 5 µm carbon Speed: 6.6 m/sec Max. beam intensity: < 4x10 13 p (NuMI) 8/25/2008HB2008 WG F: Diagnostics4 Scraping Losses (TeV)

Multiwire (or SEM) FNAL type –Wire: 25 µm Ti (before W/Au) –Ceramic substrate, w beam gap, wires epoxied to pads. University of Texas type –Signal planes: 5 µm Ti strips –Bias planes: 2.5 µm Ti foil NuMI beam –Energy: 120 GeV –Intensity/pulse: 4x10 13 protons –Beam time: 8.56 µsec / 2.2 sec –Power/spill: 140 kJoule –Σ total: > 3x10 20 protons Extrapolation –5 µm Ti strip (1660 degC – 10 %): ~1.6x10 14 protons (max) 8/25/2008HB2008 WG F: Diagnostics5 FNAL Assembly University of Texas SEM thermal simulation 5 µm strip, 3x10 13 p

Ionization Chamber BLM 8/25/2008HB2008 WG F: Diagnostics V Guard to reduce Leakage current 1.5” ANODE Signal Out Guard Lead Specifications MaterialsGlass, Nickel Volumen110 ccm Argon gas at 1 Atm Calibration70 nC / rad Response time1-2 µsec Leakage current< 10 pA Operating range1 mrad – 100 rad

Fermilab Upcoming Activities Future hadron accelerator activities –400 MeV MTA beam-line (muon cooling experiments, FY09) –NOνA upgrade for up to 700 kW beam power (120 GeV) –HINS: High intense SCRF H- injector (60 MeV) R&D –NML: SCRF beam test facility (runs with electrons, 750 MeV) – µ-to-e experiment, needs 8 GeV slow spill –Project X, based on a new SCRF 8 GeV H - linac & HINS injector, 2 MW beam power (or 120 GeV –New 120 GeV beam-line to DUSEL (Homestake) –-… Most project are pre-CD0 (beam parameters not final) Instrumentation requirements need to be specified 8/25/2008HB2008 WG F: Diagnostics7

Fermilab’s Project X 8/25/2008HB2008 WG F: Diagnostics8 High beam intensities call for non-intercepting beam diagnostics

Accelerators at Fermilab 8/25/2008HB2008 WG F: Diagnostics9 µ-to-e MTA beam-line HINS NML NOvA Project X (8 GeV SCRF linac) DUSEL beam-line

Challenges (for discussion) Transverse beam size / emittance –Physical (intercepting) wires? –Laser wire (only H- beams) –Ionization profile monitors (calibration) –e-beam wire??? Beam halo characterization (sensitivity, safety) –crawling wire, laser wire, vibrating wire Resonant extraction feedback systems Beam gap instrumentation (dynamic range 1:10 9 ) Diagnostics for low energy beams (BPMs, emittance) Beam monitors as part of SCRF cryostats –BPM pickup (button or RF cavity style) –Use of HOM coupler signals Machine protection systems –BLM-based system with minimal response time (5-10 µsec total) –Reliability, absolute calibration Other challenges…?! 8/25/2008HB2008 WG F: Diagnostics10

BNL Laser Wire for HINS BNL test: –750 keV H - beam –Faraday-cup e - detector 8/25/2008HB2008 WG F: Diagnostics11

Fermilab LPM Test Setup Laser Profile Monitor details –Q-switch laser –Laser energy: 50 mJoule –Wavelength: 1064 nm –Pulse length: 9 nsec –Fast rotating mirrors (±4 0 / 100 µsec) –e - detector: scintillator & PMT Installation: –1 st Test with 400 MeV H - –HINS: 2.5 & 60 MeV Upgrades & issues –CW laser for single macro pulse sweep –Detector system for 8 GeV setup 8/25/2008HB2008 WG F: Diagnostics12 optical box laser beam H - beam double dipole BPM detector port

Electron Beam Profiler e-beam get deflected by the p-beam Defection depends on –e-beam energy and position –p-beam charge and distribution 8/25/2008HB2008 WG F: Diagnostics13 Electron Beam Proton Beam Electron Beam Proton Beam Electrons above Protons Electrons below Protons Electron Gun Electron Beam Position Detector Electron Beam Proton Beam Deflection of ion beam curtain observed at CERN SPS Transverse profile monitor using ion probe beams. J.Bosser, et.al. CERN-PS BD, Nov pp. W. Nexsen et al., SSCL-631, May E. Tsyganov et al., Proc PAC. Deflection of ~2 keV e - beam by 65 keV e - beam Nonperturbing electron beam probe to diagnose charged-particle beams. J.A.Pasour and M.T.Ngo, Rev. Sci. Instrum. 63 (5), May 1992.

Cold BPM for NML / Project X 8/25/2008HB2008 WG F: Diagnostics14 ILC type cold CM-free L-Band cavity BPM

Cold BPM (cont.) 8/25/2008HB2008 WG F: Diagnostics15 coax port cavity waveguide Field from 1mm y offset beam FFT for x port signal FFT for y port signal High resolution (~1 µm) CM-suppressed cavity BPM Simple structure to get cryogenic and cleanroom certification Fit into ILC cryomodule Operation at NML with –Project X CW-like beam (325 or 1300 MHz bunched) –ILC-like beam (~300 ns bunch spacing) single bunch acquisition f 110 = 1.3 GHz, Q L ~ 500 Design needs more investigation on CM suppression. Preliminary simulation results