CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 24 July 2007.

Slides:



Advertisements
Similar presentations
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
Advertisements

Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
IS2210: Systems Analysis and Systems Design and Change
ITIL: Service Transition
EmpowHR 9.0 Upgrade Status Meeting Thursday, June 12, :30 A.M. – 4:00 P.M. (EDT)
1 The IIPC Web Curator Tool: Steve Knight The National Library of New Zealand Philip Beresford and Arun Persad The British Library An Open Source Solution.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
1 CS 501 Spring 2003 CS 501: Software Engineering Lecture 2 Software Processes.
Graduate System for Management of Admissions, Alumni & Records Tracking (Grad SMAART) January 8, 2007 Office of Graduate Studies.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
Massachusetts Institute of Technology
CHPS Implementation Status Chris Dietz, Jon Roe OHD HL HSEB.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Systems Analysis and Design in a Changing World, 6th Edition
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
NOAA National Weather Service Water Predictions for Life Decisions DOH/RDM Science Workshop 1 Community Hydrologic Prediction System CHPS George Smith.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
1 CHPS National Weather Service/ABRFC Implementation of Community Hydrologic Prediction System (CHPS)
CORE Executive Board March 31, 2010 Next CEB April 28, 2010.
Welcome to the San Bernardino County Coach Quarterly Meeting.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
1 National Weather Service The Evolution of AWIPS NSTEP April 4, 2007 Ronla Henry.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
A JOINT PROJECT OF MISSISSIPPI STATE UNIVERSITY AND the Lower Mississippi River Forecast Center PROJECT FUNDED BY NOAA/OAR THROUGH THE NORTHERN GULF INSTITUTE.
Preliminary Applications of the HL-RDHM within the Colorado Basin River Forecast Center Ed Clark, Hydrologist Presented July 26 th, 2007 as part of the.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
CHPS Status and Plans Jon Roe, Chris Dietz, Joe Gofus OHD/HL/HSEB Semi-Annual RFC HIC Meeting 29 July 2008.
National Weather Service The Community Hydrologic Prediction System: a Services Oriented Architecture - OHD Experiences Pedro Restrepo Jon Roe Office of.
FLDWAV to HEC-RAS Transition Software Development (HEC-RAS into CHPS) Science and Modeling –Develop and evaluate model transition procedures –Build HEC-RAS.
CHPS-AWIPS II Integration Jon Roe, Chris Dietz, Joe Gofus OHD/HL/HSEB Semi-Annual RFC HIC Meeting 29 July 2008.
AWIPS II Update Unidata Policy Committee Meeting J.C. Duh Chief, Program & Plans Division, Office of Science & Technology, NWS April 15, 2010.
CORE Executive Board January 27, 2010 Next CEB February 17, 2010.
RFC Verification Workshop Happy Ending?! Julie Demargne, Mary Mullusky and Kevin Werner RFC Verification Workshop, August
1 Hydrology Program Execution Accountability and Planning HIC Meeting January 25, 2006 NWSTC Kansas City, MO.
NHC SLOSH Run – Irene Advisory 29CHPS Forecast on the lower HudsonIrene’s Actual Flood Impact.
CSC480 Software Engineering Lecture 10 September 25, 2002.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Worldwide Protein Data Bank wwPDB Common D&A Project November 24, 2009 November 24, 2009 Steering Committee Project Update.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Mantid Stakeholder Review Nick Draper 01/11/2007.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
OHD’s Hydraulics Group & Future of Hydraulic Modeling.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
AHPS Update HIC Meeting July 11, AHPS Update NRC AHPS Report NRC AHPS Report FY07 Planning FY07 Planning Program Execution and Tracking Program.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
1 DHM: Operational Distributed Hydrologic Model Lecture 5 DHM/HL-RDHM Workshop ABRFC June 5 -7, 2007 Lee Cajina OHD/HL Hydrologic Software Engineering.
Intelligence and Information Systems 1 3/17/2004 © 2004 Raytheon Company USC/CSE Executive Workshop on Agile Experiences March 17, 2004 A Raytheon Agile.
1 CHPS Support Strategy HIC Meeting February 24, 2010 Mark Glaudemans, Chris Dietz, Jon Roe, Don Cline, Tom Graziano.
CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 30 January 2007.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Community Hydrologic Prediction System (CHPS) Focus: Provide NWS RFCs with improved access to new science developed within the hydrologic community  replace.
CHPS DISCUSSIONS TRI-AGENCY CONFERENCE BRAINERD, MN OCT 5, 2010 Bill Lawrence SCH/ABRFC.
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
CHPS Status and Activities Jon Roe OHD/HL/HSEB Chief Semi-Annual RFC HIC Meeting 8 July 2009.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Bow Basin Watershed Management Plan Revised Terms of Reference
ITIL: Service Transition
MRBB Technical Committee Update to the MRBB
Chapter 18 Maintaining Information Systems
Object oriented system development life cycle
Educational Information System Replacement Plan Overview
Engineering Processes
Presentation transcript:

CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 24 July 2007

CHPS: Status Update2 Agenda  Progress summary Since January 2007 HIC meeting……………  Project status updates ResSim………………………………………… CHPS FEWS Pilot……………………………. AWIPS II – CHPS Interface…………………. Hydraulic model into CHPS…………………. CHPS model expansion……………………… HydroXC………………………………………..  Next steps………………………………… Slide #

24 July 2007CHPS: Status Update3 Summary of Progress  CHPS Information: One Stop  ResSim (Apex, Delft, HEC) Implementation phase, initial install at CNRFC (9 July)  CHPS FEWS Pilot (RTi, Delft, OHD/RSIS) First pilot demo done (April); enhancements underway  AWIPS II – CHPS Interface (Raytheon, Apex, Delft) Initiated contract task with Raytheon (June)  Hydraulic Model into CHPS (Apex, OHD, HEC) HEC-RAS implementation analysis contract initiated (June)  CHPS Model Expansion (OHD/RSIS) XEFS work started (June)  HydroXC (Apex) Demo of SHEF.B to XML converters (June)

24 July 2007CHPS: Status Update4 CHPS web site now operational: (Contains background information, quarterly status updates, other links) CHPS Information

24 July 2007CHPS: Status Update5 ResSim: Background  Project Description Enhance and put USACE’s HEC Reservoir Simulation (ResSim) model into operational use at CNRFC from NWSRFS Link ResSim model into CNRFC operations without directly integrating software within NWSRFS code Make all ResSim upgrades easily and quickly available to CNRFC Ultimately provide to all RFCs  Three year joint HEC-OHD effort 2006 – 2009 HEC to provide enhancements to ResSim in two phases (deterministic and probabilistic) OHD to provide SOA-based “portal” between NWSRFS and ResSim  Solution must work in current CNRFC operational environment (AWIPS)  Solution should be CHPS-ready for future operational environment (SOA; use Delft-FEWS)  Funded by Yuba County Water Agency

24 July 2007CHPS: Status Update6 ResSim: HEC Status Update  Phase 1 – Enhancements to ResSim basic deterministic functionality Work Order 2, Tasks 2-12: Implement features designed in Work Order 1  Early Linux version of ResSim delivered to Delft at end of June for integration with Delft-FEWS  Final acceptance testing of Linux/enhanced ResSim running at CNRFC expected mid-September  Phase 2 – Enhancements to support ensembles Work Order 3, Task 13: Design ensemble features  Not started Work Order 4, Tasks 14-17: Implement features designed in Work Order 3  Not started

24 July 2007CHPS: Status Update7  Contract with Apex & Delft  Phase 1: Design HOSIP Gate 2/3 passed 21 February  Phase 2: Implementation Technical design complete ResSim adapter implementation complete Configuration and installation of CNRFC complete First delivery of HEC’s Linux-based ResSim complete (Final HEC functional updates still in progress) CNRFC functional testing beginning now Acceptance testing scheduled for mid-September ATAN for CNRFC to be initiated in August HOSIP Gate 4 expected September CNRFC to run parallel with normal operations this winter ResSim: OHD Status Update

24 July 2007CHPS: Status Update8  Approach Demonstrate viability of FEWS in an NWS RFC environment  Purpose is to demonstrate complete forecast model thread on representative river basins  Purpose is NOT to compare FEWS results with NWSRFS  Accomplish in a short time  Develop as little throw-away code as possible (maximize re-use) Keep all CAT members in the loop  CAT = NCRFC, NWRFC, ABRFC, CNRFC, OHD Sr. Scientist  Regular status reports, “CHPS FEWS Pilot Project” list server  All members to attend final demo  Use HOSIP Gate reviews to gain insight into technical details CHPS FEWS Pilot: Background

24 July 2007CHPS: Status Update9 Delft-RTi activities  Phase 2: Implementation - complete RTi wrote DB Export application to extract data from operational IHFS database for use by Delft-FEWS Delft configured selected basins for NCRFC and NWRFC, set up workflows Everything completed by April CHPS FEWS Pilot: Status Update

24 July 2007CHPS: Status Update10 OHD/RSIS Development Team activities  Phase 2: Implementation - complete Started with original Fortran lumped SAC-SMA HT model from Victor Koren – delivered (wrapped) to Delft 26 Jan 2007 Ported Fortran to Java, using SSHP version of SAC-SMA as a basis – delivered to Delft 26 Feb 2007 Re-factored Java version of SAC-SMA HT Fixed bugs identified during testing Future delivery(ies) to be arranged CHPS FEWS Pilot: Status Update

24 July 2007CHPS: Status Update11 CHPS FEWS Pilot contains:  Unit Hydrograph operation (Delft’s existing Unit Hydrograph operation)  Snow model (Delft’s existing SNOWMELT model)  SAC-SMA with Heat Transfer model (SAC-SMA HT application converted to Java and integrated with FEWS by OHD/RSIS)  Channel Routing model (Delft’s existing Muskingham method)  Reservoir Routing model (Delft’s existing reservoir model)  Workflows that mimic existing HCL (Delft’s existing XML-based control flow)  Basic time series transformations (Delft’s existing time-series transformations)  Ability to conduct ‘what-if’ scenarios (Delft’s existing what-if capability)  Estimation of missing data and computation of basin area averages from point values (Delft’s existing modules, similar to NWSRFS pre-processors)  Export of data from the operational AWIPS IHFS database to FEWS (DB Export application developed by RTi) CHPS FEWS Pilot: Status Update

24 July 2007CHPS: Status Update12 CHPS FEWS Pilot: Results Pilot demo held at NWRFC April 17-18, 2007  Outcome: successful yet need more features to determine if FEWS is the right solution for RFCs CAT members defined features OHD initiated new contract task – to be awarded this week? HOSIP Gate 4 passed May 9, 2007  Original pilot project complete  Enhancements will be handled as different HOSIP project

24 July 2007CHPS: Status Update13  Features to be added: Convert the pilot to a client-server system at each Pilot RFC (multi-forecaster) Configure and install the pilot system at ABRFC Develop a MODS-like capability to supplement the FEWS “what if” scenario; base on the “Tune” capability developed by Delft for their PRTF Model Port NWSRFS SNOW-17 operation into FEWS Pilot Provide extra support for the existing FEWS Pilot systems, including:  Training for NWRFC, NCRFC, and ABRFC to teach them how to try some configuration work independently (e.g., configure a new basin)  Assist NWRFC with re-configuring the Santiam basin into separate segments  Configure one Pilot RFC (site to be determined) to use hydrologic forecast ensembles  Support for reported problems and small change requests Conduct workshop to demonstrate the new features CHPS FEWS Pilot: Results

24 July 2007CHPS: Status Update14 CAT Meeting 18 June; strategy adjusted: Hold off FEWS Pilot evaluation for now Wait for added features/training (Enhanced Pilot) CAT members & OHD to define required capabilities for CHPS Initial Operating Capability  Chris now compiling IOC capabilities input Identify gaps between Enhanced Pilot & CHPS IOC Conduct cost-benefit analysis Arrive at decision point spring 2008 CHPS FEWS Pilot: Next Steps

24 July 2007CHPS: Status Update15 CHPS FEWS Pilot: Late News  Unanticipated contract delays have prevented RTi/Delft from formally beginning work on this project  Conference call (7/19) to discuss impact of delay: RTi (Danny Dishon), Delft (Karel Heynert), OHD (Jon Roe, Chris Dietz)  Outcome One month schedule slip Hold project kickoff meeting on Aug 14 Installation/upgrades Nov 26 to Dec 7 Workshop week of Dec 10 to Dec 14  Where? Balmy ABRFC or frigid NCRFC?

24 July 2007CHPS: Status Update16  AWIPS II Overall Project: AWIPS Development Environment (ADE) v1.0 delivered June 2007  All development organizations received some specific ADE training  OHD to receive OS&T-sponsored SOA training this fall Raytheon to re-engineer all AWIPS components using ADE services  AWIPS II Release 1.0 to be delivered June 2009 – June 2010  NWSRFS to get simple black box wrapping, same look & feel  CHPS to replace NWSRFS after AWIPS II roll out Comprehensive talk by Jason Tuell later today AWIPS II – CHPS Interface

24 July 2007CHPS: Status Update17  OHD initiated task with Raytheon (RIS) in June RIS will analyze Delft-FEWS Pilot as example of CHPS RIS and Apex/Delft will jointly define boundaries between RFC-hydro and AWIPS II and identify tasks to be completed Analysis results critical for CHPS GUI decisions OHD to allocate tasks appropriately (some OHD, some contractor) RIS setting up first Technical Interchange Meeting (TIM) for August AWIPS II – CHPS Interface

24 July 2007CHPS: Status Update18  Hydraulic model key component for CHPS Initial Operating Capability  FLDWAV in use now  HEC-RAS desired in CHPS Hydraulic Model into CHPS

24 July 2007CHPS: Status Update19 Hydraulic Model into CHPS  OHD began discussions in June with HEC to incorporate HEC-RAS into CHPS Apex hired to conduct analysis of CHPS work involved to link to HEC-RAS in a way similar to ResSim HEC to make RAS engine run in AWIPS environment Complex/large RAS GUI needs Windows – not easy to port ‘Interim’ solution requires Windows platform for calibration Need to assure that Windows RAS engine is identical to Linux RAS engine to make hybrid solution work HEC to do most of the work; may use other contractors if needed (e.g., Delft, RSIS, RTi)

24 July 2007CHPS: Status Update20 Hydraulic Model into CHPS CALIBRATION MODE OPERATIONAL FORECASTING MODE HEC-RAS model on Windows Export data from calibrations Full functionality Windows-based HEC-RAS GUI HEC-RAS model on Linux Limited functionality Linux-based HEC- RAS GUI Adapter Delft-FEWS Infrastructure Proposed ‘interim’ solution for HEC-RAS into CHPS

24 July 2007CHPS: Status Update21  Ensembles eXperimental Ensemble Forecast System (XEFS) working group delivered “Design & Gap Analysis” report to Gary Carter on 11 May 2007 Oversight Committee formed May 2007:  Rob Hartman, CNRFC  DJ Seo, OHD  Chris Dietz, OHD  Mary Mullusky, OCWWS Execution Manager identified (Chris Dietz, OHD) Inventory of prototype software began June 2007 Draft implementation plan due August 2007 Must be done within CHPS framework XEFS project update coming Thursday CHPS Model Expansion

24 July 2007CHPS: Status Update22  Operational Distributed Hydrologic Modeling Continue with NWSRFS-based version of DHM until after AWIPS II roll out Schedule for CHPS-based DHM solution yet unknown Modular design of prototype HL-RDHM and baseline DHM will facilitate maximum code re-use into CHPS CHPS Model Expansion

24 July 2007CHPS: Status Update23 CHPS Model Expansion  Ultimately all new science prototypes will be developed in a CHPS environment greatly reducing time and effort to get science into operations

24 July 2007CHPS: Status Update24 HydroXC: Status Update Progress  web site went live (April) Old link still available,  Schema version 3.0 posted to website  First set of hydrologic object templates defined  Dr. Michael Piasecki (Drexel University) presented at Geoinformatics Data to Knowledge Conference in San Diego, CA, May , 2007  Apex developed proof of concept tools capable of converting back and forth between SHEF.B format and HydroXC format. Demonstrated at Consortium meeting on June 21 Future Plans  More objects and tools needed; Consortium members need to help  OHD plans to continue by incorporating HydroXC in future projects where appropriate

24 July 2007CHPS: Status Update25  Continued RFC involvement in evolution of CHPS  Continue examination of Delft-FEWS as infrastructure for CHPS to get to decision  All new RFC science projects to be targeted for CHPS  Top OHD priorities for CHPS: CHPS Initial Operating Capability XEFS into CHPS Integration with AWIPS II HEC-RAS hydraulic model into CHPS Next Steps

24 July 2007CHPS: Status Update26 Comments or questions now? More open CHPS discussion later today End of Presentation