Montana DEQ Air Resources Management Bureau Registration Section Montana Petroleum Association Annual Meeting August 27, 2008 Billings, Montana Presented.

Slides:



Advertisements
Similar presentations
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Advertisements

Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Colorado Reg Revisions
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
Final Determinations. Secretary’s Determinations Secretary annually reviews the APR and, based on the information provided in the report, information.
NASFAA 2003: Reconnecting With Students!. 2 eZ-Audit – Electronic Submissions of Financial Statements and Compliance Audits Session #105.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Title V Site Operating Permits (SOPs)
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
Oil & Gas Permitting Issues and Guidance Revisions Statewide and Jonah/Pinedale Development Area Mark Smith Wyoming DEQ/AQD.
House Committee on Business and Industry House Bill Implementation of Closed Account Notification System Texas Department of Banking April 22, 2008.
Electronic Products Workshop – 2004 Division of Air Resource Management -DEP.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
NC CFW Expenditure reports How to complete and submit an expenditure report Expenditure reports How to complete and submit an expenditure report.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
Lori Hanson Title V Operating Permit Supervisor (515)
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
Air Quality Regulations – What’s New? (for Ethanol Plants) Shelley Schneider Air Quality Division Administrator.
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING EXPEDITED PERMIT PILOT PROGRAM STAKEHOLDER MEETING Wednesday, September 13, 2006.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Maricopa County Air Quality Department Compliance Division – Inspections/NOVs Steve Depenbrok Compliance Division Manager.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Material Ordering Training Fall 2010 AARP Tax Aide 1.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Value Stream Mapping: August 2005 Current State Nancy Terranova October 26, 2006.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
ITFN 4014 and ITFN 2012 Orientation Fall Homepage Tel: CSU (678)
Overview of 3 rd Party Inspection Program for USTs.
Public Hearing on the Red Light Camera Ordinance Presented by Dana Crosby, Assistant County Attorney July 13, 2010 Board of County Commissioners.
3 CDBG Disaster Recovery Program InformationWorkshop Tuesday, January 13, 2009.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Title V – Increasing Efficiency Lori Hanson, Title V Operating Permit Section Supervisor.
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
Remote Sensing Program Jim Jones IM Solutions 2016 Virginia's Road to Clean Air One Car at a Time.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
Air Quality Division Emissions Inventories SAW: May 3, 2016 Page 1 Point Source Emissions Inventories Air Quality Division Susan Wampler May 3,
Form I-9 Process Training for Supervisors and Designees Developed by Talent Development & Human Resources Revised April 2013.
MODULE 3 Policies, Procedures & Supervisor Responsibilities.
EARLY CARE AND EDUCATION PROVIDER’S MEETING March 2016.
January 13, 2009 Tampa, Florida.  Add pollutants: PM2.5, CPM, NH3, TBAC  Expand summer season data requirements to the entire state  Lower hazardous.
Training for Supervisors and Designees
ESEA Consolidated Pre-Monitoring Meeting
Reporting the Course level RWR Assessment data
Department of Buildings
Annual Inspection Certification Program
Overview of the FEPAC Accreditation Process
Outreach Training Program Requirements
Municipal Net Profit Tax
Outreach Training Program Requirements
2018 Clerks Summer Conference
MyFloridaMarketPlace
Electronic Products Workshop Division of Air Resource Management -DEP
Navigating the E-rate Invoicing Process
Department of Environmental Quality
Preparing for a Stack Test
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Montana DEQ Air Resources Management Bureau Registration Section Montana Petroleum Association Annual Meeting August 27, 2008 Billings, Montana Presented By: Mark Ewanic

August 27, 2008

Outline Introduction –History –Office & Staff Registration/Deregistration –Submittal Process –New/Updated Registrations –Backlogged Registrations –Deregistrations Compliance Monitoring –Compliance Determination –Inspection Zones –Field Approach Providing Compliance Assistance –Registered Facilities –Unregistered Facilities –Common Compliance Issues Current Status and Path Forward Contact Information

August 27, 2008 Introduction

August 27, 2008 History Before January 2006 –Department had 600+ MAQP applications from oil or gas well facilities –Majority of facilities already constructed/operating without MAQP –Not feasible to utilize existing Department staff to issue the MAQPs within statutory time frames J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008

August 27, 2008 History January 2006 ARM Title 17, Chapter 8, Subchapter 16 –Oil or gas well facilities can construct/operate prior to issuance of MAQP –Must comply with requirements of Subchapter 16 –Must have submitted application prior to January 3, 2006, or within 60 days after well completion date (whichever was later) J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008 Jan 06 – Subchapter 16

August 27, 2008 History April 2006 ARM Title 17, Chapter 8, Subchapter 17 –Allow oil or gas well facilities to register with the Department in lieu of obtaining MAQP Supply requested registration information Follow fee, operating, emission control, inspection and repair, and recordkeeping and reporting requirements J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008 Jan 06 – Subchapter 16 Apr 06 – Subchapter 17

August 27, 2008 History October 2007 Air Quality Registration Section –Office established and staffed –Began acknowledging backlog –Acknowledge new registration/deregistration requests –Identify/contact facilities that may be required to be either permitted or registered but have not submitted an application J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008 Jan 06 – Subchapter 16 Apr 06 – Subchapter 17 Oct 07 – Registration Section

August 27, 2008 History June 2008 Initial Field Inspections and Verifications –Compliance inspections on Registered facilities –Verify status of unregistered facilities that may require MAQP or registration –Provide compliance assistance J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008 Jan 06 – Subchapter 16 Apr 06 – Subchapter 17 Oct 07 – Registration Section June 08 – Field Insp/Verif

August 27, 2008 History Present Day Ongoing Work –Inspection reports –Contact companies with unregistered facilities –New registration/deregistration requests –Backlog –Evaluate/improve process Subchapter 17 rule change J F M AMJJASOND 2006 J F M AMJJASOND 2007 J F M AMJJASOND 2008 Jan 06 – Subchapter 16 Apr 06 – Subchapter 17 Oct 07 – Registration Section June 07 – Initial Facility Inspections WE ARE HERE

August 27, 2008 Purpose of Registration Provide oil or gas well facilities with an alternative to MAQP –More operational flexibility Register 60-days after well completion Notify within 15-days after change –Reduced administrative burden No application No public notice No BACT analysis No notification prior to change

August 27, 2008 Reg. Section Office & Staff Office - Butte, Montana Staff –1 Supervisor Dave Aquirre –3 Full-Time Staff Mark Peterson Eileen Steilman Mark Ewanic –2 Student Interns Karen Gillespie Whitney Walsh

August 27, 2008 Registration & Deregistration Processes

August 27, 2008 Registration Submittal Process Facility Eligibility Registration Form –Inventory of emitters –Quantify emissions Registration & Operation Fees

August 27, 2008 Oil or Gas Well Facility Eligibility Meets definition of oil or gas well facility – (13), MCA Subject to requirements of ARM –PTE > 25-tpy any airborne pollutant –Modified after 11/23/68 and PTE increase >25-tpy NOT subject to ARM Title 17, Chapter 8, Subchapter 12 (Title V Source)

August 27, 2008 Registration Form Available online –( Owner & Facility Information –Contact –Location –Emitting Units –Emission Controls –Uncontrolled/Controlled Emissions Electronic or hard copies

August 27, 2008 Registration & Operation Fee Registration Fee –$500 per newly registered facility –Registration request is incomplete until fee is paid No fee when submitting facility update Annual Operation Fee –$600 per registered facility

August 27, 2008 Registration Acknowledgement Completeness Review Compliance Review Desk Audit Acknowledgment Letter

August 27, 2008 Completeness Review Facility is eligible for registration? Registration Process and Information is complete? Registration Fee has been received? Department requests additional information if necessary

August 27, 2008 Compliance Review Desk Audit Completed prior to registration acknowledgement Does not delay registration –Potential compliance issues identified –Provides compliance assistance

August 27, 2008 Acknowledgement Letter New facilities – Within 30-days of receiving completed Registration Form Backlog - 25% each calendar year beginning in 2008

August 27, 2008 Deregistration Request Letter to Department –Justification for deregistration Department may request additional information –Quantify all emissions (e.g., fugitives) –Emission calculations using more appropriate software –Source specific inputs Updated production Separator temperature and pressure Site specific oil and/or gas analytical data Plan Ahead –Submit in time to deregister by March 1 – Be aware of issues that my delay acknowledgement

August 27, 2008 Deregistration Acknowledgement Review similar to compliance review desk audit Respond to deregistration requests within 30-days of receiving completed request

August 27, 2008 Compliance Monitoring

August 27, 2008 Compliance Determination Initial compliance review desk audit –Completed when Registration is acknowledged Field inspection –Standardized field observations sheet –Compliance review desk audit upon return to office Documentation –Standardized inspection reports –Supplemental CD Digital photos Video from IR camera

August 27, 2008 Inspection Zones Divided counties with oil or gas well facilities Full-time staff members assigned zones –Complete field inspections – Registered –Complete field verifications – Unregistered

August 27, 2008 Inspection Zones - Inspectors

August 27, 2008 Inspection Zones - Facilities

August 27, 2008 Inspection Zones – Richland County

August 27, 2008 Current Field Approach Focusing on companies/facilities that did not comply with the ARM –Focus on unregistered facilities potentially needing to be registered –Conduct compliance field inspections on registered sources in same area

August 27, 2008 Providing Compliance Assistance

August 27, 2008 Registered Facilities Field Comp. Insp. Comp. Desk Audit Issue Insp. Rpt. 30-Days In Compliance No Further Action YES NO Phone Call Followed By Report Warning or Violation Letter Possible Enforcement Company Responds YES NO Resolution, More Time, etc. 60-Days

August 27, 2008 Unregistered Facilities Review DNRC Data ??? PTE >25-tpy ??? Phone Call Followed By Letter No Further Action Company Responds Site Verification NO YES 60-Days NO YES Possible Enforcement Request Add. Time Submit Registration Submit Info. For Not Registering Review Submittal

August 27, 2008 Common Compliance Issues Controlling emissions –Tank emissions not controlled Flare, VRU, etc. –Flare not working properly (i.e., combusting produced gas and/or tank gas) –Leaks detected H 2 S detected –Strong odor but no air quality analysis –Must comply with ARM Notification of change(s) to registration information –Addition of emitter –Change to emission controls

August 27, 2008 ThermCAM TM GasFindIR Camera Detect hydrocarbon emissions –Cost savings to industry Leaks in produced gas line Leaks in vapor recovery unit –Assistance with site maintenance Leaking thief hatches (faulty seal) Flares not operating Repair leaking VOC equipment (ARM )

August 27, 2008 Current Status and Path Forward

August 27, 2008 Registration Activity (8/26/08) Total Registrations Submitted:727 Total Registered Facilities:621 Reg. Facilities Acknowledged:135/67 (Backlog/New) Reg. Updates Acknowledged:145

August 27, 2008 Inspection/Verification Activity Facility Inspections:75 Facility Verifications:130

August 27, 2008 Emission Inventory –Send out in December –Report actual 2008 emissions –Return to Department by February Upcoming Activity Rule Changes – Subchapter 17 –Addition of BACT requirements for larger internal combustion engines –Emission control requirements of Subchapter 16 match Subchapter 17 –Notification requirements Registration Form Format –Working on Excel TM version –Link calculation sheets

August 27, 2008 Things To Remember Not required to register in lieu of MAQP No fee for submitting an update Registering by facility versus by well PTE should reflect maximum potential production March 1 deadline for deregistration And when in doubt...

August 27, 2008 Contact Information

August 27, 2008 DEQ ARMB Registration Section Butte, Montana Office 49 N Main, Suite B Butte MT Tel: (406) Fax: (406) Web: