Presentation is loading. Please wait.

Presentation is loading. Please wait.

Title V Site Operating Permits (SOPs)

Similar presentations


Presentation on theme: "Title V Site Operating Permits (SOPs)"— Presentation transcript:

1 Title V Site Operating Permits (SOPs)
Carolyn Maus, P.E. Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015

2 Overview Why Title V? Why Title V?
How is the initial application reviewed? What are the other application types? Is there public input? How is EPA involved? How is the initial application reviewed? What are the other application types? Is there public input? EPA – Environmental Protection Agency How is EPA involved?

3 Overview Why Title V? Why Title V?
EPA – Environmental Protection Agency

4 Affected source category
Why Title V? Major source Affected source category Title V permit needed Major source Affected source category

5 Overview How is the initial application reviewed?
EPA – Environmental Protection Agency

6 Initial Application Basic Info.
Due before site operation begins or 12 months after TCEQ/EPA action All site-wide and unit requirements Public notice and EPA review TCEQ – Texas Commission on Environmental Quality

7 Initial Application What’s in it?
Area map, plot plan, process information Forms with detailed site information PM/CAM Compliance status Certification PM – periodic monitoring CAM – compliance assurance monitoring

8 Initial Application Preliminary Review
Completeness Company and Site Information Site Operations Introduction to applicant Completeness Company/Site Info. Site Operations Introduction

9 Initial Application Technical Review
30 TAC Chapter 106/116 permits Major NSR Summary Table: PSD/NA permits Emission points in the MAERT Monitoring/testing, recordkeeping, reporting 30 TAC – Title 30 Texas Administrative Code NSR – New Source Review PSD – Prevention of Significant Deterioration NA – nonattainment MAERT – Maximum Allowable Emission Rates Table

10 Initial Application Major NSR Summary Table
AIR CONTAMINANTS DATA Emission Point No. (1) Source Name (2) Air Contaminant Name (3) Emission Rates * Monitoring and Testing Requirements Recordkeeping Requirements Reporting Requirements lb/hr TPY** Special Condition TK-1 Tank VOC 2.5 0.24 5, 6 5, 7 5, 7, 8 Special Condition numbers with requirements for the EPN VOC – volatile organic compounds lb/hr – pound(s) per hour TPY – tons per year EPN – emission point number Contents of current MAERT

11 Initial Application Technical Review
Site-wide requirements OP-REQ1 Unit-specific requirements OP-SUM OP-UA Negative applicability OP-REQ2 OP-REQ1 is the Application Area-Wide Applicability Determinations and General Information form. OP-SUM is the Individual Unit Summary form. OP-UA forms are Unit Attribute forms. OP-REQ2 is the Negative Applicable Requirement Determinations form.

12 Initial Application Negative Applicability
Lacks information Shows that all exemption criteria are met 40 CFR – Title 40 of the Code of Federal Regulations 2SLB – two-stroke lean-burn RICE – reciprocating internal combustion engine hp - horsepower

13 Initial Application More Technical Review
Compliance OP-ACPS Compliance History Review PM/CAM OP-MON OP-ACPS is the Application Compliance Plan and Schedule form.

14 Initial Application Periodic Monitoring
Does the rule contain sufficient monitoring? Does it have sufficient monitoring frequency? If you answered No at least once, you’ll need PM. If you answered No at least once, you’ll need PM.

15 Initial Application Compliance Assurance Monitoring
Subject to an emission limitation or standard; Using a control device; and Pre-control emissions ≥ major source threshold Emission Limit Control Device Pre-control ≥ major CAM applies!

16 Initial Application Resolving Deficiencies
The permit reviewer will: Send a list of deficiencies Review applicant responses Request additional information if needed

17 Initial Application Working Draft Permit
The applicant will: Submit comments within 30 days Legibly mark changes on forms or draft Clearly indicate new, revised, and deleted data Certify updates prior to public notice

18 Overview What are the other application types?

19 Overview Application types - SOP renewals SOP Renewals

20 SOP Renewal Timeline TCEQ sends renewal notification Permit issued
Permit expiration Five year permit term (unless otherwise noted) Application due (6-18 months before expiration)

21 SOP Renewal Application
Update all requirements Evaluate PM/CAM for all units Certify compliance status Public notice and EPA review

22 Overview Application types – SOP revisions and notifications

23 SOP Revisions and Notifications
Reviewed by: TCEQ EPA The public Purpose is to maintain current applicable requirements

24 Notifications What is a notification? What is a notification?
Can I use a notification? When should I submit my notification? Can I use a notification? When should I submit my notification?

25 Operational flexibility
Notification Types Off-permit changes Add applicable requirements from site changes New unit New PBR/standard permit Operational flexibility Remove unit Modify applicable requirements Decrease NSR emission limits Off-permit changes: Add applicable requirements from site changes New unit New PBR/standard permit Operational flexibility: Remove unit Modify applicable requirements Decrease NSR emission limits. PBR – permit by rule

26 SOP Revisions Types Administrative Minor Significant

27 SOP Revisions Application
Describe each change Identify affected emission units Use appropriate TCEQ forms

28 Administrative Revision
What changes? What changes qualify for this revision type? 30 TAC § When is it due? No later than 30 days after the permit anniversary Procedures? Can operate the change before revision issuance No public notice or EPA review 30 TAC § When is it due? 30 days after anniversary Procedures? Operate before issuance; No public notice/EPA review

29 Operate before issuance; Public announcement/EPA review
Minor Revision What changes? What changes qualify for this revision type? 30 TAC § When is it due? Before operating the change Procedures? Can operate the change before revision issuance Public announcement/EPA review 30 TAC § When is it due? Before operation Procedures? Operate before issuance; Public announcement/EPA review

30 Operate after issuance; Public notice/EPA review
Significant Revision What changes? What changes qualify for this revision type? 30 TAC § When is it due? Before operating the change Procedures? Cannot operate change until revision is issued Public notice/EPA review 30 TAC § When is it due? Before operation Procedures? Operate after issuance; Public notice/EPA review

31 Overview Is there public input? Is there public input?

32 Public Notice Publish Post Applicant must: Notice Signs
Publish notice Post signs Make permit documents available for viewing Submit public notice documents to TCEQ Applicant Tasks Submit Forms Public Viewing

33 Public Announcement TCEQ publishes announcement online
TCEQ posts documents online

34 Overview How is EPA involved? How is EPA involved?

35 EPA Review Concurrent with public notice/announcement
45-day review period Concurrent with public notice/announcement Stops if comments are received: Begins again after comments are addressed

36 Final State Action After EPA review: TCEQ issues permit
60-day public petition period: EPA may receive valid petition TCEQ resolves objections Permit may be modified

37 Guidance TCEQ Memos Additional FOP Guidance
FOP – federal operating permit TCEQ memos can be found at Additional FOP guidance can be found at

38 Submitting Applications to TCEQ
TCEQ APIRT, MC 161 P.O. Box Austin, TX Mail a copy of all applications to the appropriate TCEQ regional office. APIRT - Air Permits Initial Review Team MC - mail code

39 Submitting Updates to Applications Under Review
[Name of Assigned Permit Reviewer] TCEQ Air Permits Division, MC 163 P.O. Box Austin, TX Mail a copy of all updates to the appropriate TCEQ regional office.

40 Submitting Info. to EPA Region 6
Air Permits Section (6PD-R) EPA, Region 6 1445 Ross Avenue, Suite 1200 Dallas, Texas Send all applications on a CD Send all application updates to: Identify the permit number CD – compact disc

41 Air Permits Division (512) 239-1250
Questions? Air Permits Division (512)


Download ppt "Title V Site Operating Permits (SOPs)"

Similar presentations


Ads by Google