The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

EQUIPMENT VALIDATION.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Performance Management: Getting Ready for Accreditation Needs Assessment Survey Community Assessment 1 Online survey Open to anyone interested in this.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Online Reconstruction 1M.Ellis - CM th October 2008.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
2014 CalCom Activity Plan based on last year’s work and open discussion: Periodic meetings with detector groups to discuss algorithms, discuss software.
CLAS12 – CND PARAMETERDESIGN VALUE Detector typeBarrel of scintillators Angular coverage40 o to 120 o Number of radial layers3 Number of azimuthal segments48.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
All The future of DC work. GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.
CLAS Collaboration Organization for 12 GeV Operations
Latifa Elouadrhiri Jefferson Lab
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
CLAS12 DAQ/Trigger/Online Status
CLAS12 DAQ, Trigger and Online Computing Requirements
CLAS12 First Experiment Workshop Summary
CLAS12 Commissioning with Cosmincs
CLAS Collaboration Organization for 12 GeV Operations
CLAS12 Calibration and Commissioning (CALCOM)
Systems Analysis and Design in a Changing World, Fifth Edition
ProtoDUNE SP DAQ assumptions, interfaces & constraints
HLT & Calibration.
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Overview of CLAS12 Calibration
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
System Analysis and Design:
Presentation transcript:

The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011

CLAS12 Commissioning Preparation of the commissioning plan for the CLAS12 detector has started -Crucial step for successful and efficient start of CLAS12 data taking -Need to address all detector subsystems with coherent and detailed plan, from construction and installation phase to in-beam commissioning -First document, describing the plans for the commissioning of the CLAS12 base equipment, was presented to DOE in 2008 for review Recently the CLAS12 steering committee has taken charge of the preparation of a new updated plan The CLAS12 steering committee has appointed a committee (R. De Vita - chair, D. Carman, D. Weygand, V. Burkert – advisor) to collect information for all subsystems, review it and organize collected information in a coherent plan, …, provide a written document

Commissioning Plan Commissioning will be divided in three phases 1.Quality assurance and system checkout of CLAS12 subsystems during construction and installation 2.Commissioning without beam (laser, cosmic rays, …) 3.Commissioning with beam Should be built based on information collected from detector groups and hardware experts Should address the software requirements to successfully complete the detector commissioning and perform initial calibration Should exploit the past experience gained during the CLAS commissioning and operation

Committee Activity: #1-Survey CLAS12 subsystems: Instrumentation: Beamline, Moller polarimeter, Magnets Detectors:FTOF, CTOF, EC-PCAL, DC, SVT, MM, HTCC, LTCC, CND, FT, RICH Online:Electronics, DAQ, Trigger, Slow Controls, Database, Reconstruction/Monitoring Information Template: Structure: list foreseen tasks according to the three commissioning phases (quality assurance and system checkout, commissioning without beam and commissioning with beam) Items: for each of the planned tasks, provide information on goals, technique and equipment, manpower and time needs, DAQ & Trigger configuration, software and computing resources, dependencies, information to be saved in the database, repetition frequency System Contact Persons: Main:should act as a liaison between the committee and detector/system group to collect and provide requested information Software: should be the link between the system group and the CLAS12 software group

Information Template 1.1. Quality assurance: Describe the procedure that will be followed during the construction of the system and its installation in Hall B to ensure the proper functioning of the device, verify alignment and positioning, identify and replace faulty components, …. For each test that is foreseen provide the following information.

Information Template 3. Commissioning with beam Describe the run conditions and configurations that are foreseen for this system in the initial phases of operation with beam. List the data runs that you plan on doing, specifying the configuration of your system and of the other detectors, DAQ and trigger configuration and describing the parameters that will be monitored (rates, spectra, …) and the final outcomes. Include all the runs that should be done to check the system and to perform a complete calibration of the detector.

System Contacts SystemContact Person(s)Software Contact Person(s) Beamline/TargetE. Pasyuk MollerB. Raue Magnets: solenoidL. Quettier torusL. Quettier Time of Flight: FTOFD. Carman CTOFV. Baturin Calorimeters: ECS. StepanyanW. Brooks/M. Wood PCALS. StepanyanW. Brooks/M. Wood Forward Tracker: DCM. Mestayer Central Tracker: SVTY. GotraM. Holtrop, S. Phillips MMF. SabatieS. Procureur Cerenkov Counters: HTCCY. Sharabian/ V. KubarovskyM. Ungaro/A. Vlassov LTCCM. Ungaro/ J. PriceM. Ungaro/A. Vlassov New equipment: CNDS. Niccolai FTM. BattaglieriD. Weygand RICHP. RossiM. Contalbrigo Online: DAQS. Boiarinov ElectronicsC. Cuevas TriggerV. Kubarovsky EPICSN. Gevorgyan DatabaseJ. Goetz Reconstruction/MonitoringD. Weygand

Status Request to fill information templates was sent out to contact persons on April 4 th 2011 Present status: Feedback from all subsystems 50% of the templates were returned Review of available templates is in progress Preparation of comprehensive document has started Thanks to all the system groups and the contact persons for their prompt response to this call and the precious information that is being provided!!

Outcomes In addition to providing critical information for the development of the CLAS12 commissioning plan, the survey has outcomes in relevant areas: Slow controls: the information provided by the system groups will allow to define a detailed list of slow controls that will have to be implemented. Database : list of items to be saved in the CLAS12 database will allow to define the database structure and exploit this fundamental resource in all the phases, from the detector construction to the final operation Software: details on software requirements and needs will be crucial to ensure the availability of proper tools and computing resources Manpower: estimates of the necessary manpower for the completion of all the tasks connected with the construction, installation and commissioning of the CLAS12 subsystem allows to identify critical areas where the Collaboration may contribute providing engineering and software resources