Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.

Slides:



Advertisements
Similar presentations
Android Enabled Camera Positioning system Design Team 3 Chris Sigler Yan Sidronio Ryan Popa Jeremy Iamurri Austin Fletcher Facilitator: Dr. Oweiss Sponsor:
Advertisements

Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Vertical Launch UAV Project Plan. ∞ Construct an unmanned aerial vehicle (UAV) with a camera payload ∞ UAV must autonomously navigate with real-time video.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Alex Funiciello Dan Graves Mike Hardbarger Jim Reepmeyer Brian Smaszcz May 14, 2010.
A Project Team Members: Shamlan AlbaharRifaah Alkhamis Doug BloomquistChris Deboer.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
Auto - Drive An Automated Driving Range. Team Members Mike Loiselle Jared Beland Jeremy Paradee.
R I T Team Members: Nathan Boyer → Team Lead Brandon Howell → Power Electronics Engineer Brad Whitlock → Electrical Lead Joe Krisher → Mechanical Systems.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Autonomous Dual Navigation System Vehicle Dmitriy Bekker Sergei Kunsevich Computer Engineering Rochester Institute of Technology December 1, 2005 Advisor:
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
Client: Space Systems & Controls Laboratory (SSCL) Advisor : Matthew Nelson Anders Nelson (EE) Mathew Wymore (CprE)
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
TelosB Charging and Energy Meter Kit(Dec1201) Group Leader: Tomas Mullins Communicator: Casey Liebl Webmaster: Shiya Liu Team Members: Andrew Gurik & Qiao.
April 26, Team Information Designation Ongo-03 Members Advisors Dr. J. Lamont, Prof. R. Patterson, Dr. Rajagopalan, Dr. J. Basart ClientSpace Systems.
Client: Space Systems & Controls Laboratory (SSCL) Advisor : Matthew Nelson Anders Nelson (EE) Mathew Wymore (CprE)
A Mobile Wireless Electrocardiogram System for Health Care Facilities John Farner Jason Fritts Julian Jaeger Joe Richard Georgia Institute of Technology.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Problem Statement TelosB Charging/Metering Kit Power from 2 sources Charge AA or AAA NiMH batteries Monitor Current, Voltage and Power Deliverables 3 Fully.
LABET Low Altitude Balloon Experiments in Technology CPR E 491 ENGR 466.
EE 491 Project Presentation May07-04 – PDA Based UAS Remote Video Terminal Team Members: Devin Carney Jonathan Farmer Matt Henkes Rene Rios Faculty Advisor:
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
Client: Space Systems & Controls Laboratory (SSCL) Advisor : Matthew Nelson Anders Nelson (EE) Mathew Wymore (CprE)
Mentors Workshop Control System Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Smart Digital Valve Control Simulator May April 25, 2001 Client: Client: Fisher Controls Intl. Inc. Contacts: Contacts: Patrick Ryan and Jeff Seyller.
Low Altitude Balloon Experiment in Technology (LABET) Group Members – Richard George – Industrial Technology Mike Svendsen – Computer Engineer Steve Towey.
Autonomous Helicopter James LydenHarris Okazaki EE 496.
Abstract Proposed Approach Solution Development Project Requirements Estimated Resources Other Resources Financial Resources Project Schedule Computer.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
UNION COLLEGE WEATHER STATION Brian Kruppenbacker Jeffrey D’Alessandro Advisor: Professor Traver.
Client: Space Systems & Controls Laboratory (SSCL) Advisor : Matthew Nelson Anders Nelson (EE) Mathew Wymore (CprE)
Spalding Gymnastics Scoreboard Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer Ali Khan.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
AUTONOMOUS UNDERWATER VEHICLE Propulsion Vertical Thrust Controloverview The AUV Team Thrust Experiment Pool Testing The ultimate purpose of the AUV is.
Network Enabled Wearable Sensors The Combined Research Curriculum Development (CRCD) project works with the Virtual Reality Applications Center (VRAC)
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
Aerospace Digital Communication Instrument Senior Design Presentation.
MSU SeaMATE ROV Explorer Class
Construction of the Balloon Project SCIPP Interns.
Detection of Patient Falls Using Three-Axis Accelerometer Umer Jamshaid Tyler Quarles Parampal Randhawa Martha Serna Matthew Treinish April 26, 2011 School.
Group Members Richard George – Industrial Technology Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Client.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer SPALDING GYMNASTICS SCOREBOARD Client: Spalding Advisor: Zhao Zhang.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Mid-Semester Presentation Senior Design II October 2, 2012 Humidity-Activated Bathroom Fan.
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
Final Presentation Senior Design I April 19, 2012 Humidity-Activated Bathroom Fan.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122 – Autonomous Quadcopter Jason Enslin (EE – Team Leader) Courtney Walsh (ME – Aero) Richard Nichols (EE) Glenn Kitchell (CE) Jeff Welch (ME) Dr.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
Ryan Massicci Alan Lee Troy Hawley Weather Meter.
Instrumented Walker Skyler Bullington Tommy Frankenberger Larson Stacy
SCADA for Remote Industrial Plant
Weather Station Weather station design for measuring
Low Altitude Balloon Experiment in Technology (LABET)
Serial Data Hub (Proj Dec13-13).
P15661 Reciprocating Friction Tester Base Subsystem
Image Acquisition and Processing of Remotely Sensed Data
<Your Team # > Your Team Name Here
Presentation transcript:

Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client – ISU Space Systems and Control Lab (SSCL) Advisor – Matt Nelson

Overview Client Statement of Need Project Requirements and Deliverables Project Plan Subsystem Designs & Implementations Testing Lessons Learned

Client Statement of Need The SSCL desires a blimp platform for research and outreach events. The need is to have an outdoor blimp platform capable of carrying a small payload and able to navigate in calm to light winds.

Requirements Non-Functional Durable and reusable design Controlled via computer interface Positional data displayed on computer Operating Environment Outdoors Winds up to 10mph Humidity up to 90% Functional Requirements Vertical lift feet Wireless control feet Carry 7 ounce payload Fly time of 20+ minutes Sensor to determine position

Project Deliverables Complete balloon system meeting requirements Operating manuals Detailed design documentation

Project Plan Work Breakdown Mike and Steve responsible for electronic components Brian and Richard for non electronic components Task Breakdown Gantt Chart

Communication / Collaboration Weekly meetings with team and advisor (client) At least a weekly meeting with just electronics team Frequent meetings in lab for implementation Used Dropbox to facilitate SVN like role Used GoogleDocs to facilitate sharing of information

Costs

System Overview

Balloon Design Hybrid Latex Blimp System

Balloon Implementation Initial implementation Struggled to achieve lift Weight calculation inaccuracies Propellers not performing as specified Redesign Remove stiffeners Remove latex balloons Increase to 2 mil plastic

Frame Design Cross Foam Core Load Frame Rigid material yet light, inexpensive Bass wood for motor mounts Propeller shrouds System box

Frame Implementation Difficulties attaching balloon around electronics box Shortened weight distributors Propellers not exact specified length, did not fit in vertical shroud Slightly trim propeller tips

Propulsion Design Weight constraint Battery life requirement 10 mph wind requirement Thrust CalculationsBattery Life Calculations

Propulsion Implementation Mount motors Attach propellers securely Attach easy to use bullet connectors Attach Deans plugs Connect motors to Electronic Speed Controllers

Circuit Design Compile list of sensors Select specific sensor Consider cost, voltage, accuracy Select processor capable of handling inputs

Circuit Implementation Package types ESCs raising voltage Solution – Diode Voltage drop during XBee Transmission Clean signal off of regulator pin Breadboard potential issue

Onboard Control Logic Design

Onboard Control Implementation Implemented each sensor separately Xbee ADC (gyro) I2C (compass, pressure) GPS Timers (ESCs) Simple, flexible message format Dealing with limited program space

Base Station Design C++ on Linux

Base Station Implementation Writing KML Files Implementing OpenGL GUI Serial communication Thread interaction

Testing Approach

Important Tests Individual module tests System lift Base station and onboard system interaction Assembly tests Battery Life Communication Range Indoor test flights (Uncooperative weather recently) Tests not carried out Outdoor tests – Fight winds

Lessons Learned Skills Basics of constructing practical circuits Basics of PIC Programming Be flexible - hold up in one area, work on another Test changes one at a time to isolate unknowns Budget enough time for documentation Interdisciplinary team

Questions?