OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative SIO Mechanical Design Samples 64” Float Designs: Global Hybrid Profiler Mooring,

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Multi-Drop Sealed Connector System Introduction Fully sealed to IP66 & 67, the Multi-Drop Sealed Connector System uses cable-pierce technology to offer.
SeaCycler AST2 Surface Piercing Profiler Technology.
AC-SSC-1 Installation and operation manual
Material Handling Modules Configuring Your Own Work Cells.
Seattle SE/PE Meeting September 2010 Ocean Observatories Initiative Surface Piercing Profilers Tiger Team Presented to the Seattle SE/PS Meeting September.
μMS³ μModular Substrate Sampling System μMS³ μ Modular Substrate Sampling System.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
Networking for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Installation. Indoor Unit Installation Typical Installation.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Water Level loggers Vented vs Absolute. Definitions Absolute: Measures total pressure (weight) above the sensor. Atmospheric pressure must be removed.
Cell Culture Stirrer for YSI Design overview: past and present New features Manufacturability improvements.
High Sensitivity Smoke Detection
Measuring pressure. Conductivity, Temperature and Depth (CTD) Despite the name, all CTDs actually measure pressure, which is not quite the same thing.
TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
AST2 Hypbrid Profiler Mooring PDR Ocean Observatories Initiative Coastal & Global Scale Nodes At Sea Test 2 Hybrid Profiler Mooring Preliminary Design.
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Aquatic Plants. Phytoplankton Single celled Base of aquatic food web Oxygen production CO 2 + H 2 0  H 2 CO 3  H + + HCO 3 -  2H + + CO 3 2- As.
Puget Sound Tow CTD chain Test January 4, 2011  Participants: Scientist : Frank Henyey, Barry Ma Captain : Eric Boget Engineer : Tim McGinnis, Tim Wen,
Solar Electric Boat Drive train System Design Review
Overview – HOT Site Hawaii Ocean Time-series “HOT” Site –3 Stations: Kahe, Kaena & ALOHA –monthly cruises for 15 years –ALOHA Station 100km N of Oahu.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Ice Tethered Profiler (ITP) Moorings WHOI Principle Investigators John Toole Rick Krishfield Andrey Proshutinsky WHOI Principle Investigators John Toole.
Green Systems: Wet Demonstrator Stephen Lentz Director of Network Development.
Collaboration Meeting Argonne National Laboratory June 10-11, 2010 Mechanical Design of Glass Tiles and Trays Rich Northrop University of Chicago Second.
ALOHA-MARS Mooring Moorings called for in many OOI plans Features –Enables adaptive sampling –Distributes power, communications, time throughout the water.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
MEYER MULTI PALLET HANDLERS. THE PRODUCT 2 DEVELOPING THE TREND 3.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Aluminum probe carrier body Aluminum drive tube -assembled in sections, this provides up/down and rotational motion control of probe Fiber optic/ electrical.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Forklift pick set-up interfacing with a MCHP
© 2014 Eaton. All Rights Reserved.. Eaton 93PM: Value, Benefits, and Features.
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
CIBSE HCNW 28 August 2014 Modular boilers. Traditional or low-tech replacement boiler installation; Multiple boilers eg 2 no 66% of load for security.
SAL COLLEGE OF ENGINEERING AHMEDABAD LIQUID LEVEL MEASUREMENT
Altivar 32 So slim, So smart!
WP7 Objective: “Prove the design of a mooring incorporating a submersible winch capable of producing surface ocean CO 2 and biogeochemistry data “
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
1 Target Station Design Dan Wilcox February 2012.
S A Griffiths CM42 June 2015 Electrical & Control.
System Integration As a recognized market leader in the analyzer service field, Blue Stacks has experienced virtually every type of process analyzer system.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
MKTG 2016.
Optimum Pump Performance for Process Applications
DEVICE FOR THE IMPLANTATION OF NEURAL ELECTRODE ARRAYS
Development of a low material endplate for LP1 and ILD
Expandable Seafloor Observatory
MKTG 2016.
Ocean Instrumentation
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Bunker Wall Design Wall ESS
Daylight Redirecting Window Film
Stoughton Parts Sales 2019 Customer Appreciation Event
Presentation transcript:

OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative SIO Mechanical Design Samples 64” Float Designs: Global Hybrid Profiler Mooring, Mesoscale Flanking Mooring, and AST2

OOI Annual Review Year 2 May 16 – 20, 2011 Hybrid Profiler Mooring – 64” Float Assembly designed to fit standard WHOI 64” sphere design. Adaptable design allows for configurations for AST2, GHPM, and MFM with minimal exchange of parts. Can be attached in-line, or as a mooring top-element.

OOI Annual Review Year 2 May 16 – 20, 2011 Hybrid Profiler Mooring – 64” Float Top Weldment Assembly Strain relief to mitigate forces on the mooring cable from Surface Piercing Profiler (above) (4) upper lifting bails for easy recovery – based on previous WHOI design Mount tabs for beacons / external instruments

OOI Annual Review Year 2 May 16 – 20, 2011 Hybrid Profiler Mooring – 64” Float Bottom Weldment Assembly (4) lower lifting bails for further ease of handling during deployment and recovery Shown here with load cell as it will be deployed in AST2 WHOI standard EM chain WHOI standard universal joint

OOI Annual Review Year 2 May 16 – 20, 2011 Hybrid Profiler Mooring – 64” Float Internal Cage Assembly Allows for protected placement of instruments and controller inside the sphere. Removable for easy maintenance of installed components. Simple, modular construction for further ease of assembly and installation.

OOI Annual Review Year 2 May 16 – 20, 2011 Hybrid Profiler Mooring – 64” Float Standard WHOI inductive termination (on cable to Surface Piercing Profiler) attaches here Load cell data logger for AST2 Modular cage sections Internal Cage Assembly Handles for cage removal

OOI Annual Review Year 2 May 16 – 20, 2011 Mesoscale Flanking Mooring – 64” Float Mooring Top Float – 30m Depth Most parts identical to Global Hybrid Profiler Mooring 64” float, for added benefit of common components Full suite of instruments installed in center well

OOI Annual Review Year 2 May 16 – 20, 2011 Mesoscale Flanking Mooring – 64” Float Top Weldment Assembly Top plate in place of strain relief to interface with internal cage assembly (4) upper lifting bails for easy recovery Mount tab shown here with fluorometer/turbidity sensor as deployed in the MFM (additional protection will be added)

OOI Annual Review Year 2 May 16 – 20, 2011 Mesoscale Flanking Mooring – 64” Float Internal Cage Assembly Allows for protected placement of instruments and controller inside the sphere. Removable for easy maintenance of installed components. Simple, modular construction for further ease of assembly and installation of wide range of instrument types and sizes.

OOI Annual Review Year 2 May 16 – 20, 2011 MFM - Internal Cage Assembly Mesoscale Flanking Mooring – 64” Float pH instrument SIO titanium controller housing Handles for cage removal CTD Dissolved Oxygen Instrument Pump – Ensures high-precision measurements with a controlled supply of uncontaminated water to internal instruments