1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2.

Slides:



Advertisements
Similar presentations
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Advertisements

Role of Senior Management
Planning M&E to Tell Our ACSM Story. Objectives Discuss how ACSM activities can address barriers to help reach national TB control targets. Describe how.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Preparing and Structuring a Training Event.
1. Session structure Overview Actions Definition Challenges Outputs Exercises Module 11 WSP revision following incident 2.
MODULE 8: PROJECT TRACKING AND EVALUATION
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
1. Module 2 Describe the water supply system Session structure Overview System components and description Outputs Challenges Factors to consider Exercise.
Measurement. T EAM STEPPS 05.2 Mod Page 2 Measurement Objectives  Describe the importance of measurement  Describe the Kirkpatrick model of training.
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2.
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
The situation The requirements The benefits What’s needed to make it work How to move forward.
Using iSIKHNAS for Budget Advocacy 2.3 Using performance indicators for budget advocacy.
DETERMINANTS OF DATA USE Session 2. Session Objectives  Explain the data-use conceptual framework  Highlight the determinants of data use  List potential.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Chlorination & Chlorine Demand
1. Session structure Overview Example definition Actions Example output Challenges Exercises Module 3 Identify hazards and assess risks 2.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Case Study: The Walkerton Experience The Events of May 2000.
Module 3. Session DCST Clinical governance
Mississippi State Department of Health
Laboratory Assessment Tool-LAT Philippe Dubois April 2-12, 2013 Phom Penh, Cambodia.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
Risk Management from Source to Tap – a strategic approach Gerard O’Leary Office of Environmental Enforcement Environmental Protection Agency.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 8 Prepare management procedures 2.
Data Quality Assessment
Issues Arising from The Quality of Drinking Water In Ireland Report Brendan Wall Senior Inspector Environmental Protection Agency.
Estimating Access to Health Care in Russia O.V. Borisenko, P.A. Vorobyev Russian Forum XI ISPOR XI European Congress of ISPOR
Continuous Improvement and Focused Monitoring System US Department of Education Office of Special Education Programs Overview of the OSEP Continuous Improvement.
M & E TOOLKIT Jennifer Bogle 11 November 2014 Household Water Treatment and Water Safety Plans International and Regional Landscape.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 9 Develop supporting programmes 2.
Presented to Managers. INTERNAL CONTROLS are the integration of the activities, plans, attitudes, policies and efforts of the people of an organization.
In the Framework of: Financed by: Developed by: MODULE 11 Management Overview Business Plan Update.
Monitoring Know the importance of monitoring in humanitarian response Be aware of different elements of monitoring Identify challenges and tips for effective.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
Leah Guzman and David Edmunds Environmental Program Specialists The Ground Water Rule Workshop Department.
Data Quality Assessment of PEPFAR ART Sites In Nigeria Final Report February 17, 2006 Nigeria/Monitoring and Evaluation Management Services in collaboration.
Session 5: Selecting and Operationalizing Indicators.
1. Session structure Definition Actions Outputs Challenges Exercises Module 7 Verify WSP 2.
CHAPTER 10 BUSINESS RISK. BUSINESS RISK 1.Natural disasters 2.Financial risk 3.Legal risk 4.Technology-related risks 5.Mismanagement 6.Safety and security.
Module 3 Identify hazards and assess risks
Chlorination & Chlorine Demand
Module 7 Verify WSP Session structure Definition Actions Outputs
Logistics Assessment & Planning
4.4 Monitor and Control Project Work
Module 2 Describe the water supply system
Artibonite Department, Haiti DINEPA, CDC, ACTED, UNICEF
Chapter 20: Measuring the Effectiveness of the workforce
Module 8 Prepare management procedures
Module 9 Develop supporting programmes
بسم الله الرحمن الرحيم.
National Wilderness Stewardship Alliance March 29, 2016
Module 10 WSP review Session structure Overview Mini-exercise Actions
Environmental Services Training Group
COMPLIMENTARY TEACHING MATERIALS
Module 11 WSP revision following incident
Budget Execution Course – Opening Session
Swimming in the Deep End, Shark Free!
Audit Findings Process
Project Management Training
Module 5 Improvement/upgrade plan
Module 6 Monitoring control measures
Intensive Intervention – Tier 3
Alexander Hinz & Kasy Stinson Water Supply Division
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Needs tree introduction
Kasy Stinson Water Supply Division
Presentation transcript:

1

Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2

Overview Define and validate the monitoring of control measures Assess if the control measures are working Know what corrective actions are needed when things go wrong Module 6 Monitoring control measures 3 Control measures: what/how/when should be monitored? where/who? Monitoring results: Is the control measure working? What corrective actions are needed? Y N

Actions Effective monitoring: What is being monitored How What time / frequency Where Who will monitor Who will analyse Who gets results Module 6 Monitoring control measures 4

Control measure Critical limit WhatWhereWhenHowWhoCorrective action Chlorination at water treatment >0.5 & < 1.5 mg/l Disinfectant residual Entry to distribution On-lineAnalyserWQ officer See non compliance protocol 5

Outputs Module 6 Monitoring control measures 6 Picture source: Accurate assessment of the performance of control measures Explicit corrective actions where needed Broken fence – failing control Fix it

Challenges Absent or ineffective evaluation of data Staff expectations / attitude Lack of resources for monitoring and corrective actions – human and financial Module 6 Monitoring control measures 7 /

8 Exercise In small groups 45 minutes Walkerton case study Prepare a timeline of events and indicate the opportunities for intervention that could have prevented or reduced the scope of the outbreak. What actions should the operators of this facility have taken that could have prevented this outbreak? Who was to blame?