Presentation is loading. Please wait.

Presentation is loading. Please wait.

Module 5 Improvement/upgrade plan

Similar presentations


Presentation on theme: "Module 5 Improvement/upgrade plan"— Presentation transcript:

1

2 Module 5 Improvement/upgrade plan
Session structure Why do we need an improvement/upgrade plan? Overview Actions Challenges Outputs Exercises

3 ? Module 5 Improvement/upgrade plan Do you know what to do?
Why do we need an improvement/upgrade plan? Prioritize action for each uncontrolled or ineffectively controlled risk Implement short-, medium- and long-term activities Maximize effectiveness of resources ? Do you know what to do?

4 Module 5 Improvement/upgrade plan
Overview Improvement/upgrade plan involves Development Implementation Maintenance Monitoring and review of upgrades Required due to absent or ineffective control measures Should explicitly state who is responsible

5 Introduction of new controls could introduce new risks
Module 5 Improvement/upgrade plan Introduction of new controls could introduce new risks

6 Module 5 The plan (iterative process)
New risks? Uncontrolled risks? Short Medium Long term Develop plan Implement plan Evaluate plan Amend plan Recalculate the risks Update the WSP

7 Module 5 Improvement/upgrade plan
Example plan Review example plan in workbook Invent a new “action” Complete rest of table: Arising from Improvement plan Accountabilities Due Status What other factors need to be considered when developing an upgrade plan (see Appendix G)? E.g. Is there a need for research and development?

8 Module 5 Improvement/upgrade plan
Challenges Ensuring WSP is up to date Securing finances Lack of resources Ensuring new risks are not introduced or are mitigated

9 Module 5 Improvement/upgrade plan
Outputs A prioritized improvement/upgrade plan for addressing each uncontrolled risk Implementation of short-, medium- and long-term activities for upgrade A process for monitoring the plan

10 Module 5 Improvement/upgrade plan
Exercise In small groups Develop a suitable “health awareness campaign” for your water supply area (10 minutes) Identify key factors that need consideration for financial investment of a system upgrade activity to be realized – outline a draft proposal (20 minutes)

11 Module 5 Improvement/upgrade plan
Summary of WSP stage 2 – system assessment Describe the water supply system (Module 2) Identify the hazardous events/hazards & assess the risks (Module 3) Determine & validate control measures, reassess & prioritize risks (Module 4) Develop, implement & maintain an improvement/ upgrade plan (Module 5) Catchment Treatment Distribution User Any agent or event that can cause harm. Likelihood and consequence of occurrence What is preventing hazardous events/hazards from occurring? How can you be sure these controls are suitable? A plan is needed if existing controls are ineffective or absent


Download ppt "Module 5 Improvement/upgrade plan"

Similar presentations


Ads by Google