Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.

Similar presentations


Presentation on theme: "Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground."— Presentation transcript:

1 Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground Waters

2 Overview Ohio Administrative Code Goals of OEL Calculation OEL Exceedance OEL Form 5031 Take Home

3 Ohio Administrative Code OAC 3745-81-24 (D) (21) OEL calculated for DBPs at all monitoring locations Exceedance of the MCL requires a report OEL report due 90 days following notification Publicly accessible upon request

4 Goals Primary: to help prevent an MCL through advanced warning of increased DBP Locational Running Annual Averages (LRAA) for quarterly monitoring Secondary: to cause PWSs to address locations or facilities with seasonal DBP issues

5 Calculation of OEL A = TTHM or HAA5 result for the quarter before the previous quarter B = TTHM or HAA5 result for the previous quarter C = TTHM or HAA5 result for current quarter D = Current Operational Evaluation Level Value

6 Example Location “X” (DS201) TTHM Results Current Quarter Value (3 rd Qtr 2013) ……………………... ( 114.0 µg/L ) 2 Previous Quarter Value (2 rd Qtr 2013)……………….....…….61.3 µg/L Quarter Before Previous (1 st Qtr 2013)….............………..45.1 µg/L 334.4 µg/L 4 OEL = 83.6 µg/L

7 OEL Exceedance Early warning Not a violation No public notice requirement Can be at 1 or more monitoring location(s) TTHM or HAA5

8 Following an Exceedance 1.Receive call from OEPA to determine scope 2.Receive letter from OEPA with report template 3.Complete OEL report (Form 5031)

9 45 Total 84% 3 rd Quarter 62% Purchased SW 6 Repeat OEL Exceedances (Since Aug. 2012)

10 Limited Scope Limited scope OEL report if cause is known High DBP levels result from a certain change in water quality, treatment or distribution

11 What’s the Point? Begin dealing with DBP issues prior to NOV Investigate areas of concern Make adjustments to lower DBP levels Document investigation on Form 5031

12 OEL Form 5031

13 Section 1 – Source Water and Treatment

14 Noteworthy Changes to Source Water:  Significant algal blooms  Uncharacteristic precipitation events  Alternative well usage  Distinctive change to purchased water Changes to Treatment:  Chemical feed increase or decrease  Chemical product changes Section 1 – Source Water and Treatment

15 Section 2 – Distribution System Operations

16 Noteworthy Events or Changes to the Distribution System:  Hydrant flushing  Line breaks  Rerouted flow  Significant demands

17 Section 3 – Storage Tank Operations

18

19 Section 4 – Chlorine Residual Monitoring

20 Disinfectant residual information;  Average residual can be found on your MOR  Number of distribution samples includes daily samples and samples collected with TC  Number of samples <0.2 mg/L for free or <1.0 mg/L for combined chlorine  Repeated for each month of the quarter

21 Section 5 – Additional Information

22  Additional monitoring information  Plans to comply with the MCL  Corrective actions taken from past OEL exceedances

23 Take Home Early warning not a violation OEPA will notify of an exceedance Report covers treatment, storage and distribution Failure to submit a report is a violation Goal is to optimize control of DBPs and avoid MCL exceedances

24 More Information www.epa.ohio.gov/ddagw www.epa.gov/safewater/disinfection/stage2

25 Questions


Download ppt "Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground."

Similar presentations


Ads by Google