IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Special Recognition Cheryl Wilson, State Auditor and Inspectors Office Presented by Ann Embree and Sherri Schieffer County Training Program and Oklahoma.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
1 Evaluation Reviews and Reevaluations Macomb ISD Special Education Management Services August, 2006.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Review of 2010 Biennial Audit of Capital Projects Cyndi Fout Project Services Director February 28, 2011.
Overview of the Federal Aid Process for Transportation Projects.
Greenfield District Utility/RR Engineer, INDOT
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
1 CDBG Procurement Requirements For Local Officials.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Right of Way Section Dee Jones State Right of Way Manager Richard Dunlap Operations Manager Joe Gray Region 5 Right of Way Manager
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Research Phase, Indiana 811, Initial Notice, Verification Deborah Porter Project Engineer/Utility Coordinator Clark Dietz, Inc.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Mock State Aid Project County Highway Accountant’s Conference 2015.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
AISD Bookkeeper and Admin Training 2013 STANDARD SERVICE AGREEMENT Bowie High School August 8, 2013 STRONG LEADERS STRONG SCHOOLS BUILDING ON STRENGTHS.
Specification & Quantities Estimating
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
The Lifecycle of Grants: Grant Agreement and Fair Housing November 7, 2012.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Contract Training Class I
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Highway Utility Engineer, INDOT
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
LPA – Utility Coordination Natalie Parks, P.E. American Structurepoint, Inc. December 19, 2013.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Construction Oversight
County Highway Accountant’s Conference 2015
LOCALLY ADMINISTERED PROJECTS
State Aid Construction
Designers’ Manual Overview and Chapter Contents
Residential Placement Application 2011
Research Phase, Indiana 811, Initial Notice, Verification
Work Plan Development.
105 Indiana Administrative Code Article 13
State Aid Construction
Presentation transcript:

IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015

Agenda Learning Objectives Introduction Table of Contents Certificate Special Provision 107-R-169 Approve Consultants or Contractor Work In State Contract Records Checklist Roles and Responsibilities

Learning Objective Explain why IDM Chapter 104 was developed Become familiar with IDM Chapter 104 Know and apply Certificate Write special provision 107-R-169 Know how to approve Consultants & Contractors Know when to do relocation Work In Contract Know what records to maintain Know and apply the IDM Ch 104 Checklist Know and apply applicable roles

Introduction Design Manual IDM Ch. 104 replaces IDM Ch. 10 IDM Ch. 104 – revised August 2013 But it is only 80% of where we want to be. Changes listed on Title Sheet Why do we have IDM Ch. 104? To provide detailed guidance to design team Suggestions for improvement

Table of Contents (1) General Information Introduction Responsibilities and Roles Utility Rule 105 IAC 13 No Waiver-Limited Utility Involvement Utility Coordination Certificate Utility Coordination Special Provision Utility Coordination References Definitions and Acronyms Utility Coordination Process Subsurface Utility Engineering

Table of Contents (2) Design Considerations Reimbursement Highway Utility Agreement Cost Estimate Consultant and Contractor Approval Utility Work in State Contact Utility Coordination Records

105 IAC 13 Minor or major project Minor is less than 12 months design Major is more than 12 month design Project Manager makes the decision Input from the Utility Coordinator Affects duration of Utility Coordination

105 IAC 13 Geographical limits Limits of expected utility involvement In the area means in the geographical limits Defined by the Project Manager Minimum is survey limits

Contract Requirements No Waiver – Certificate with limited Utility involvement Certificate and Special Provision

Certificate : Limited Utility Involvement Use a certificate with limited utility involvement for routine maintenance projects such as: Mowing, Herbicide treatment, Sweeping Pavement markings, Etc. A certificate with limited utility involvement does not mean there are no utilities in the area

Certificate Use a certificate for all projects Certificate includes: Affidavit Utility information Exceptions Format is at INDOT website

What is an Exception? An Exception exists when a utility that needs to be relocated will not be relocated by the letting date.

Certificate Example 1 of 12 UTILITY COORDINATION CERTIFICATE Monday, May 18, 2015 Contract No.: Letting Date: LEAD DES No.:

Certificate Example 2 of 12 Related DES#s:Location Description Enter location description

Certificate Example 3 of 12 No Utilities were found within the project limits Utilities exist within the project limits, but have been found not to be affected by the proposed construction; or incidental construction. (Attachment A) Utilities exist within the project limits and have been found to be affected by the proposed construction (Attachment B) Design-Build Project (See Attachment D for Statement and Signatures) Type of Utility Certificate:

Certificate Example 4 of 12 Let without Exceptions Let with Exceptions (Attachment C) Not applicable (no Utilities Involved) Letting Status:

The undersigned affirms that they are an INDOT Certified Utility Coordinator and have performed all of the required duties for the project. The undersigned affirms they have performed his or her responsibilities as a utility coordinator in conformance with 105 IAC 13, the Utility Accommodation Policy and Indiana Design Manual Chapter 104. The undersigned affirms they have made a diligent effort to identify if Utilities are involved within the project. If it is determined that utilities will be affected with the proposed construction, the Utility Coordinator affirms that he or she has shown on the project plans all known utility facilities within the limits of this project; have completed the conflict analysis; and have executed work plans for all utilities with facilities in the project area. Plans or other information that clearly identify the scope of this contract were provided to all utility companies with utility facilities within the project area. Utility relocation work plans including narrative, schedule, and drawings have been reviewed, coordinated, and approved. All utility documents required for letting have been submitted to the designer as of (date). Certificate Example 5 of 12

Certificate 6 of 12 The “Existing Conditions of Utilities” statement included in this contract is for all utility companies with utility facilities found to be within the limits of the right of way. The “Existing Conditions of Utilities” include utility name, contact person name and telephone numbers, and work description and schedule. This certifies, when applicable, that the utility has acquired all necessary property interests and permits necessary to relocate impacted facilities. The Utility Coordinator does not guarantee or warrant in any way the accuracy of information provided by utility companies. Utility Coordinator, (District Name) District Date (Printed Name)

Certificate 7 of 12 Certification with Exceptions is approved for letting. (Senior Utility Engineer signature is required for exceptions) Senior Utility Engineer Date (Printed Name)

Certificate 8 of 12 Utility Name Attachment A List of Utilities within Project Limits, but were found to be unaffected by the proposed Construction: Utility Name:

Certificate 9 of 12 Attachment B List of Utilities within Project Limits found to be affected by the proposed Construction: ReimbursableWork in Contract Utility NameAgreement No.Permit No. YesNo Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes

Certificate 10 of 12 Insert 107-R- 169

Certificate 11 of 12 Attachment C List Utilities Let with Exceptions Utility NameException Description

Certificate 12 of 12 Attachment D INDOT Design-Build Project The undersigned affirms that they are an INDOT Certified Utility Coordinator and have performed all of the required duties for the project required for the Design-Build Project in which the awarded Contractor will take over further Utility Coordination responsibilities. The undersigned affirms they have performed his or her responsibilities as a utility coordinator in conformance with 105 IAC 13, the Utility Accommodation Policy and Indiana Design Manual Chapter 104. The undersigned affirms they have made a diligent effort to identify if Utilities are involved within the project up to the point that the Awarded Contract for the Design-Build Project takes over all aspects of the project, including Utility Coordination. As the project evolves under the direction of the Contractor for this project, there may be further Utility Coordination required which is the responsibility of the Awarded Contractor for this project. After this date,, the Utility Coordination responsibilities are relinquished to the Awarded Contractor. Utility Coordinator, (District Name) DistrictDate (Printed Name)

IDM Ch. 104 – SP 107 R 169 Remember – These are instructions to the Contractor For each utility in the area state: Utility name Utility is in the area of the project Utility is or is not in conflict with the project Designated Representative: name, telephone, Activities before utility begins construction Expected duration of relocation work General location of their existing facilities General scope of their relocation work

Special Provision 107 R 169

References Code of Federal Regulations 23 CFR 645 Indiana Code Majority of references Indiana Administrative Code 105 IAC 13 INDOT Standard Specifications FHWA Program Guide 23 CFR 645 ASCE Standards for SUE

Definitions Section includes Definitions Acronyms Abbreviations Intent was to be consistent with: Standard Specifications Design Manual Review at your own pace and time

Contractor Approval Primary responsibilities: Proper solicitation procedures were followed Costs are reasonable Utility submits letter requesting approval Utility submits supporting documents Continuing contract with rate sheet Bid tabulations and lowest qualified bidder selected UC reviews documents – recommendation OSA approves and signs letter Complications?

Work In Contract INDOT prefers to use work in contract When eligible for reimbursement When work requires extensive coordination When the same primary contractor will be used through the entire project Requires Des. No. for each facility type Utility must provide: Approved work plan Signed agreement Final stamped plans Specifications Engineer’s estimate List of quantities

Records Keep copies of the following: Maintain a utility coordination log Activities Conversations All signed documents All notices to proceed See specific requirements

Roles Roles and Responsibilities Key to understanding IDM Ch. 104 There a 6 specific roles described: Designer – 16 responsibilities Surveyor – 5 responsibilities Utility Coordinator – 81 responsibilities Utility Oversight Agent – 20 responsibilities Authorized Representative – 6 responsibilities Project Manager – 9 responsibilities

Responsibilities Responsibilities are listed in: IDM Chapter 104 Checklist for utility coordination They are not the same Checklist has tasks and sub-tasks Checklist – please get your copy Checklist – let us review

Checklist Why a checklist? Currently 12 milestones in SPMS Mileposts start and finish not defined Identified sub-tasks to define each milestone Results Checklist for utility coordination Mileposts defined by specific sub-activities Mileposts reduced from 12 to ?

Mileposts

Initiation Phase

Letter Permit Addendum

No payment for additional work without prior approval. Utility needs to coordinate approval prior to performing additional work. No payment for additional cost without prior approval. Utility needs to coordinate approval prior to incurring additional cost. Any change of work needs permit addendum. Any change of cost needs permit addendum.

Letter Work Complete

Letter Request Invoice

Summary Learning Objectives Introduction Table of Contents Waiver/Certificate Special Provision 107-R-169 Approve Consultants or Contractor Work In State Contract Records Checklist Roles and Responsibilities

Questions?