Meteorological Program Self Assessment Presented at NUMUG San Francisco, CA 2009.

Slides:



Advertisements
Similar presentations
Job Hazard Analysis I. Speaker’s Notes:
Advertisements

COMPANY MAINTENANCE MANUAL
Compliance From The Ground Up September 18, 2013 Earlene Gibbons Director, Operational Technology.
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Software Quality Assurance Plan
Determining a Backup Source of Meteorological Data for Dispersion Characteristics (Wind and Stability) Mark T. Carroll Heather A. McDonald Andrew J. Lotz.
11th NUMUG Meeting - St. Louis 10/13/061 Preliminary Dispersion Modeling for the NuStart Plant at Bellefonte Doyle E. Pittman and Kenneth G. Wastrack Tennessee.
Kenya AIDS Vaccine Initiative
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
1 ANSI/ANS American National Standard for Determining Meteorological Information at Nuclear Facilities R. Brad Harvey, CCM Physical Scientist.
Tritium Management by Design
Temporal Comparison of Atmospheric Stability Classification Methods
Weather and X/Q 1 Impact Of Weather Changes On TVA Nuclear Plant Chi/Q (  /Q) Kenneth G. Wastrack Doyle E. Pittman Jennifer M. Call Tennessee Valley Authority.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Project Change Management
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
S/W Project Management
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Investigation of Meteorological Tower Siting Criteria Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 15 th Annual RETS-REMP Workshop.
DMCC AV Program2006 NUMUG Meeting DOE METEOROLOGICAL COORDINATING COUNCIL (DMCC) ASSIST VISIT PROGRAM 2006 NUMUG Meeting St. Louis, MO October 12, 2006.
ESP / COL Applications Meteorological Data Requirements and Regulatory Conformance Issues Ping Wan Bechtel Power Corporation The Eleventh Nuclear Utility.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Information Systems Security Operational Control for Information Security.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Important informations
Meteorological Monitoring Supporting Maintenance Activities Robert F. Yewdall PSEG Nuclear LLC NUMUG Oct 2003 Chattanooga, TN.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Archival Workshop on Ingest, Identification, and Certification Standards Certification (Best Practices) Checklist Does the archive have a written plan.
Comparison of the AEOLUS3 Atmospheric Dispersion Computer Code with NRC Codes PAVAN and XOQDOQ 13th NUMUG Conference, October 2009, San Francisco, CA.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 Safety factors for periodic safety review for research reactors Group A: SF1 – SF4.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
NUMUG - Oct Atmospheric Stability – Methods & Measurements Robert F. Yewdall PSEG Nuclear LLC.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
May 2002[NUMUG] Listening to the Wind1 of 17 LISTENING TO THE WIND TVA Experience with Installation and Operation of Ultrasonic Wind Sensors Kenneth G.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Recent Developments Regarding Control Room Habitability Assessment
Overview of Quality Assurance
Instrument Maintenance
IEEE Std 1074: Standard for Software Lifecycle
Flooding Walkdown Guidance
The Role of Meteorology in the Nuclear Power Industry
  Aptiv Global Supplier Quality Early Production Containment Training.
Research and Test Reactor Decommissioning Inspections
TRTR Briefing September 2013
How to conduct Effective Stage-1 Audit
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Meteorological Program Self Assessment Presented at NUMUG San Francisco, CA 2009

Columbia 10m Wind Vanes

Columbia 10m Temp Probes

75m Instruments

Note unusually high frequency of ‘A’ Stability class in This is impossible in winter months.

High frequency of ‘A’ Stability class in 2005 & This is possible but not likely.

Temperature Probe Output Shift Lightning Strike

Delta T Shift

24hrs – Sunny vs Cloudy

Self Assessment Initiation History of problems with met tower data –NRC Submittal – 0% Recovery in 2001 –Prep for Submittal – 0% Recovery in 2005 –Answers to questions to peers LTA –List of issues growing Initiated Self Assessment –Team Makeup –In Depth Look – 29 checklist questions

Organizations Affected Reactor Engineering (responsible for accident analysis using met tower data) Licensing (met tower regulatory commitments and LBD management) EP (Interested party for real time met data and offsite dose software applications) Environmental Services (Responsible for environmental monitoring based on met tower data and data trending) Chemistry (Responsible for a) effluent monitor setpoint calculations and b) routine and abnormal release dose calculations both based on real time and historic met tower data) System Engineering (Responsible for instrument performance) Work Planning and scheduling (Responsible for repair of met tower instruments) IT (Responsible for met tower data software and computer hardware support) I&C (Responsible for Surveillances (calibrations)) Maintenance (Responsible for preventive & corrective maintenance)

Checklist Questions Desert Sigmas Heat Emission Rates Reference Bases Data Recovery Annual Rainfall Diffusivity Rain Collection Signal Trending Data Screening Wind Frequency Rejection Instrument Separation Sigma Theta Guy Wires As Found Calibration Distribution Diffusivity Instrument Cables Solar Instrument Interference Zones Dew Point Solar Shields Training Data Trending Remediation Tent Interference ISFSI Heat Effect Terrain Effects Advantages of ANSI Corrective Action Effectiveness Met Tower Walkdown

Self Assessment Findings Accuracy Commitment TS/LCS/ODCM/FSAR Calibrations Methodology Trending Training Tower Design/Climbing Work Request Priority LTA Consensus of Problems

Self Assessment Findings Accuracy Commitment Where conflicts exists between recommendations of –RG 1.97 Rev 2 and –Safety (Regulatory) Guide 1.23 Rev , CGS complies with RG ° vs 0.1°C for Delta T Temperature sensor improvement –Current sensor accuracy = ±0.30°C –Young sensor accuracy = ±0.10°C –MetOne sensor Accuracy = ±0.05°C

Accuracy Comparisons

Threshold for Concern

Self Assessment Findings TS/LCS/ODCM/FSAR No LCO or RFO in TS, LCS, or ODCM for inoperable/non-functional met tower instruments FSAR describes program/surveillances Channel Checks not performed for one channel

Self Assessment Findings Calibration Methodology Sections of loop not included in calibration –Lack of Cal Lab sensor data with loop test documentation –Lack of line integrity test of tower cables –Lack of validation of computer signal Lack of aspirator inspection As Found OOT not trended Process slow or interrupted Calibration by WO instructions

Self Assessment Findings Trending Frequency of instrument trends LTA Depth of trending LTA –Current procedure LTA for untrained personnel and LTA to identify problems and ensure timely corrective action –Lack sufficient action threshold criteria and cross- organization approval of criteria chosen –Does not trend all met tower signals & correct all channels, not just FSAR channels. –Does not compare signals to nearby towers –Limited methods –Interference zones not identified

Self Assessment Findings Training Turnover of personnel Background of personnel Time/schedule for training Funding Many groups need training –Right-hand not knowing Left-hand needs

Self Assessment Findings Work Request Priority With no LCO or RFO, work priority has been low System Engineers with nuclear safety- related systems & met tower instruments must balance limited resources

Self Assessment Findings LTA Consensus of Problems Engineering personnel are not trained in meteorology Belief that a system is not OOT until proven by calibration

Self Assessment Findings Tower Design Temperature probes on opposite sides of tower Wind vane design generating wind shadow Annual Rainfall runs November to November Torque guy system wires makes instrument elevator design difficult –Hesitancy to increase frequency of calibrations Tower Climbing –Windy, icy conditions –Maintenance delays (6 – 7 months)

Self Assessment Findings Others Input parameters in XOQDOQ –Heat Emission Rate –Terrain Height –Exit Direction XOQDOQ –Desert Sigma Data Validation LTA JFD creation software not robust enough to defend low work prioritization

Self Assessment Results 13 Condition Reports –Includes Licensing Bases Documents and implementing procedure revisions to ensure compliance with commitments. 18 Action Request Evaluations to –Consider design changes to improve accuracy and reduce bias of met tower signals, to –Consider software changes to process and validate met tower data prior to use in LBD submittals or ODCM compliance assessments, to –Ensure knowledge retention, and to –Validate input values to dose assessment calculations

End Presentation Discussion questions: –How do you convince Engineering or Maintenance that repair is needed? –How is tower maintenance performed in icy, windy conditions without an elevator? –Can delta T accuracy requirements of RG 1.23 Rev 1 be met? –Others?